ODOT contract 250227 bid tabulation
STA-Minerva Bridge (BIKEWAYS). Let by Ohio DOT on April 24, 2025, STA. 3 bids received; low bid $738,873 by Black Horse Bridge Construction Inc, -4.4% against the engineer's estimate of $773,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 58
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Black Horse Bridge Construction Inc | $738,873 | Low | -4.0% |
| 2 | Stanley Miller Construction Company | $755,787 | +2.0% | -2.0% |
| 3 | J D Williamson Construction Co Inc | $772,162 | +5.0% | 0.0% |
Engineer's estimate: $773,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Black Horse Bridge Construction Inc | 2. Stanley Miller Construction Company | 3. J D Williamson Construction Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $7,500.00 | $2,722.00 | $4,500.00 |
| 2 | Pavement removed (202E23000) | SY | 412 | $6.00 | $13.20 | $10.00 |
| 3 | Curb removed (202E32000) | FT | 9 | $30.00 | $25.00 | $30.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 16 | $15.00 | $40.00 | $30.00 |
| 5 | Removal misc.:abandoned utility pole (202E98100) | EACH | 1 | $300.00 | $1,000.00 | $600.00 |
| 6 | Removal misc.:EX. steel rail (202E98200) | FT | 97 | $3.00 | $13.00 | $5.00 |
| 7 | Excavation (203E10000) | CY | 38 | $27.00 | $105.00 | $15.00 |
| 8 | Embankment (203E20000) | CY | 368 | $62.00 | $92.00 | $18.00 |
| 9 | Subgrade compaction (204E10000) | SY | 605 | $6.00 | $1.00 | $7.00 |
| 10 | Excavation of subgrade (204E13000) | CY | 11 | $50.00 | $100.00 | $55.00 |
| 11 | Granular material, type B (204E30010) | CY | 11 | $90.00 | $160.00 | $115.00 |
| 12 | Proof rolling (204E45000) | HR | 1 | $200.00 | $225.00 | $300.00 |
| 13 | Geotextile fabric (204E50000) | SY | 31 | $20.00 | $35.00 | $8.00 |
| 14 | Fence, misc.:wood fence (607E98000) | FT | 118 | $107.00 | $79.00 | $97.85 |
| 15 | Curb ramp (608E52000) | SF | 30 | $45.00 | $78.00 | $55.00 |
| 16 | Special - as-built construction plans (690E91000) | LS | 1 | $2,000.00 | $7,500.00 | $500.00 |
| 17 | Special - survey control verification (690E98400) | LS | 1 | $2,000.00 | $2,600.00 | $6,500.00 |
| 18 | Soil analysis test (659E00100) | EACH | 2 | $125.00 | $150.00 | $125.00 |
| 19 | Topsoil (659E00300) | CY | 135 | $53.00 | $40.00 | $60.00 |
| 20 | Seeding and mulching (659E10000) | SY | 1,212 | $4.25 | $6.00 | $4.40 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.17 | $900.00 | $800.00 | $900.00 |
| 22 | Lime (659E31000) | ACRE | 0.30 | $160.00 | $150.00 | $160.00 |
| 23 | Water (659E35000) | MGAL | 7 | $1.00 | $1.00 | $2.00 |
| 24 | Erosion control (832E30000) | EACH | 8,500 | $1.00 | $1.00 | $1.00 |
| 25 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 2 | $120.00 | $500.00 | $170.00 |
| 26 | Concrete masonry (602E20000) | CY | 0.30 | $3,600.00 | $4,500.00 | $3,800.00 |
| 27 | 8" conduit, type D (611E02400) | FT | 22 | $35.00 | $45.00 | $38.00 |
| 28 | 15" conduit, type D (611E06400) | FT | 16 | $60.00 | $65.00 | $45.00 |
| 29 | Aggregate base (304E20000) | CY | 81 | $110.00 | $150.00 | $130.00 |
| 30 | Tack coat (407E10000) | GAL | 58 | $4.00 | $30.00 | $4.00 |
| 31 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 41 | $460.00 | $825.00 | $470.00 |
| 32 | Curb, type 6 (609E26000) | FT | 9 | $140.00 | $175.00 | $60.00 |
| 33 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $13,500 | $15,411 | $86,000 |
| 34 | Approach slab removed (202E22900) | SY | 11 | $24.00 | $200.00 | $75.00 |
| 35 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $82,000 | $52,774 | $85,000 |
| 36 | Unclassified excavation (503E21300) | LS | 1 | $54,000 | $23,167 | $20,000 |
| 37 | Pile driving equipment mobilization (505E11100) | LS | 1 | $30,000 | $10,111 | $12,500 |
| 38 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 700 | $20.00 | $45.00 | $33.00 |
| 39 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 800 | $40.00 | $34.00 | $33.00 |
| 40 | Epoxy coated steel reinforcement (509E10000) | LB | 11,895 | $2.00 | $1.65 | $1.65 |
| 41 | Class QC2 concrete, bridge deck, as per plan (511E34445) | CY | 20 | $1,500.00 | $598.00 | $1,225.00 |
| 42 | Class QC1 concrete, abutment including footing (511E43510) | CY | 115 | $600.00 | $762.00 | $670.00 |
| 43 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 66 | $32.00 | $52.00 | $32.00 |
| 44 | Type 2 waterproofing (512E33000) | SY | 25 | $40.00 | $131.00 | $62.00 |
| 45 | Structural steel, misc.:prefabricated bridge (513E95020) | LS | 1 | $175,800 | $144,944 | $185,500 |
| 46 | Structural steel expansion joint, as per plan (516E12201) | FT | 28 | $750.00 | $1,000.00 | $300.00 |
| 47 | 1" preformed expansion joint filler (516E13600) | SF | 38 | $5.00 | $13.00 | $7.00 |
| 48 | Porous backfill with geotextile fabric (518E21200) | CY | 23 | $170.00 | $125.00 | $150.00 |
| 49 | 6" perforated corrugated plastic pipe (518E40000) | FT | 48 | $20.00 | $45.00 | $21.00 |
| 50 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 90 | $22.00 | $42.00 | $21.00 |
| 51 | Dynamic load testing (523E20000) | EACH | 1 | $4,000.00 | $8,000.00 | $5,200.00 |
| 52 | Concrete slope protection, as per plan (601E21001) | SY | 20 | $325.00 | $300.00 | $190.00 |
| 53 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 22 | $155.00 | $250.00 | $190.00 |
| 54 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,000.00 | $15,000 | $8,300.00 |
| 55 | Maintaining traffic (614E11000) | LS | 1 | $3,000.00 | $9,000.00 | $6,000.00 |
| 56 | Field office, type B (619E16010) | MNTH | 15 | $1,000.00 | $500.00 | $700.00 |
| 57 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,000 | $32,000 | $14,500 |
| 58 | Mobilization (624E10000) | LS | 1 | $20,000 | $51,248 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.