ODOT contract 250064 bid tabulation
SUM-IR 480-07.45 (BRIDGE REPAIR). Let by Ohio DOT on January 30, 2025, SUM. 2 bids received; low bid $7,359,020 by Kokosing Construction Company Inc, +26% against the engineer's estimate of $5,840,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 166
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $7,359,020 | Low | +26% |
| 2 | J D Williamson Construction Co Inc | $9,999,387 | +36% | +71% |
Engineer's estimate: $5,840,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. J D Williamson Construction Co Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $70,000 | $20,000 |
| 2 | Pavement removed (202E23000) | SY | 9,043 | $7.50 | $10.00 |
| 3 | Pavement removed (202E23000) | SY | 718 | $26.00 | $24.00 |
| 4 | Guardrail removed (202E38000) | FT | 2,185 | $2.00 | $2.00 |
| 5 | Special - pipe cleanout, 24" and under (202E70110) | FT | 433 | $11.00 | $25.00 |
| 6 | Fence removed (202E75000) | FT | 382 | $8.50 | $4.00 |
| 7 | Excavation (203E10000) | CY | 1,888 | $80.00 | $28.00 |
| 8 | Embankment (203E20000) | CY | 324 | $60.00 | $25.00 |
| 9 | Subgrade compaction (204E10000) | SY | 1,779 | $3.00 | $5.00 |
| 10 | Excavation of subgrade (204E13000) | CY | 25 | $70.00 | $25.00 |
| 11 | Granular material, type B (204E30010) | CY | 25 | $120.00 | $100.00 |
| 12 | Proof rolling (204E45000) | HR | 1 | $300.00 | $335.00 |
| 13 | Geotextile fabric (204E50000) | SY | 75 | $8.00 | $2.50 |
| 14 | Linear grading, as per plan (209E60201) | STA | 22 | $730.00 | $120.00 |
| 15 | Guardrail, type MGS (606E15050) | FT | 975 | $18.50 | $19.00 |
| 16 | Guardrail, type MGS with long posts (606E15100) | FT | 700 | $21.00 | $21.00 |
| 17 | Guardrail, type MGS quarter post spacing with long posts (606E15300) | FT | 250 | $23.50 | $40.00 |
| 18 | Anchor assembly, MGS type B (606E26050) | EACH | 3 | $2,200.00 | $2,600.00 |
| 19 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 5 | $2,300.00 | $2,600.00 |
| 20 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $900.00 | $1,400.00 |
| 21 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,300.00 | $2,600.00 |
| 22 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $350.00 | $575.00 |
| 23 | Fence, type 47 (607E15000) | FT | 279 | $17.45 | $28.00 |
| 24 | Fence, type CLT (607E23000) | FT | 103 | $43.00 | $46.00 |
| 25 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $7,000.00 |
| 26 | Special - survey control verification (690E98400) | LS | 1 | $5,000.00 | $8,500.00 |
| 27 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 19 | $160.00 | $175.00 |
| 28 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 60 | $100.00 | $100.00 |
| 29 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $125.00 |
| 30 | Topsoil (659E00300) | CY | 298 | $15.00 | $60.00 |
| 31 | Seeding and mulching (659E10000) | SY | 2,688 | $1.70 | $1.80 |
| 32 | Repair seeding and mulching (659E14000) | SY | 134 | $1.70 | $1.79 |
| 33 | Inter-seeding (659E15000) | SY | 134 | $1.70 | $1.79 |
| 34 | Commercial fertilizer (659E20000) | TON | 0.37 | $1,250.00 | $881.00 |
| 35 | Lime (659E31000) | ACRE | 0.56 | $150.00 | $154.00 |
| 36 | Water (659E35000) | MGAL | 15 | $1.00 | $1.00 |
| 37 | Mowing (659E40000) | MSF | 6 | $200.00 | $5.00 |
| 38 | Erosion control (832E30000) | EACH | 82,500 | $1.00 | $1.00 |
| 39 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 50 | $35.00 | $12.00 |
| 40 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 5,277 | $16.00 | $20.00 |
| 41 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 193 | $50.00 | $25.00 |
| 42 | 6" conduit, type F (611E01500) | FT | 50 | $55.00 | $25.00 |
| 43 | Precast reinforced concrete outlet (611E99710) | EACH | 10 | $650.00 | $550.00 |
| 44 | Partial depth pavement repair (442) (251E01030) | CY | 25 | $1,900.00 | $775.00 |
| 45 | Full depth pavement sawing (252E01500) | FT | 10,246 | $2.00 | $3.00 |
| 46 | Pavement repair (253E02000) | CY | 25 | $1,900.00 | $800.00 |
| 47 | Pavement planing, asphalt concrete, 1.5" depth (254E01000) | SY | 43,258 | $1.00 | $3.00 |
| 48 | Pavement planing, asphalt concrete, 3.0" depth (254E01000) | SY | 834 | $21.00 | $20.00 |
| 49 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 459 | $410.00 | $265.00 |
| 50 | Aggregate base (304E20000) | CY | 294 | $176.00 | $120.00 |
| 51 | Tack coat, 702.13 (407E13900) | GAL | 38 | $3.00 | $20.00 |
| 52 | Non-tracking tack coat (407E20000) | GAL | 3,728 | $2.50 | $3.50 |
| 53 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 29 | $590.00 | $450.00 |
| 54 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 41 | $425.00 | $340.00 |
| 55 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 54 | $750.00 | $350.00 |
| 56 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 1,453 | $328.50 | $260.00 |
| 57 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 278 | $690.00 | $360.00 |
| 58 | Curb, type 4-C (609E24510) | FT | 36 | $75.00 | $31.00 |
| 59 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 14,199 | $0.60 | $0.51 |
| 60 | Special - pavement overlay fabric composite (690E12060) | SY | 2,846 | $28.50 | $30.00 |
| 61 | RPM (621E00100) | EACH | 68 | $118.00 | $125.00 |
| 62 | Raised pavement marker removed (621E54000) | EACH | 68 | $67.00 | $20.00 |
| 63 | Barrier reflector, type 1, (1-way) (626E00102) | EACH | 8 | $11.00 | $10.00 |
| 64 | Barrier reflector, type 2, (1-way) (626E00110) | EACH | 32 | $11.00 | $13.00 |
| 65 | Ground mounted support, no. 2 post (630E02100) | FT | 21 | $23.10 | $22.00 |
| 66 | Ground mounted support, no. 3 post (630E03100) | FT | 50 | $25.30 | $24.00 |
| 67 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 38 | $85.80 | $82.00 |
| 68 | Sign, flat sheet (630E80100) | SF | 2 | $49.50 | $47.00 |
| 69 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $16.50 | $16.00 |
| 70 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $71.50 | $68.00 |
| 71 | Removal of ground mounted post support and disposal (630E86002) | EACH | 8 | $22.00 | $21.00 |
| 72 | Removal of ground mounted structural beam support (630E86102) | EACH | 2 | $269.50 | $250.00 |
| 73 | Edge line, 4", type 1 (642E00100) | MI | 0.12 | $11,135 | $11,400 |
| 74 | Center line, type 1 (642E00300) | MI | 0.06 | $22,985 | $23,000 |
| 75 | Edge line, 6" (646E10010) | MI | 0.12 | $63,845 | $63,900 |
| 76 | Lane line, 6" (646E10110) | MI | 0.06 | $22,325 | $22,400 |
| 77 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 2.96 | $6,405.92 | $6,450.00 |
| 78 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 1.48 | $3,123.08 | $3,125.00 |
| 79 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 4.44 | $3,760.37 | $3,775.00 |
| 80 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 600 | $135.00 | $100.00 |
| 81 | Increased barrier delineation (614E11630) | FT | 320 | $0.75 | $12.00 |
| 82 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 8 | $2,500.00 | $2,500.00 |
| 83 | Detour signing (614E12420) | LS | 1 | $35,000 | $20,000 |
| 84 | Work zone increased penalties sign (614E12484) | EACH | 8 | $830.00 | $160.00 |
| 85 | Work zone raised pavement marker (614E12800) | EACH | 100 | $7.40 | $36.00 |
| 86 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 3,246 | $27.00 | $9.00 |
| 87 | Barrier reflector, type 1, (1-way) (614E13310) | EACH | 244 | $7.50 | $14.00 |
| 88 | Barrier reflector, type 2, (1-way) (614E13312) | EACH | 50 | $18.00 | $14.00 |
| 89 | Object marker, one way (614E13350) | EACH | 344 | $23.00 | $18.00 |
| 90 | Maintaining traffic, misc.:safety repairs (614E18000) | EACH | 100,000 | $1.00 | $1.00 |
| 91 | Portable changeable message sign (614E18600) | SNMT | 12 | $675.00 | $1,000.00 |
| 92 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $670.00 | $1,000.00 |
| 93 | Work zone lane line, class I, 6", 807 paint (614E20056) | MI | 1.45 | $1,400.00 | $1,425.00 |
| 94 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 8.83 | $2,700.00 | $2,725.00 |
| 95 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.12 | $8,560.33 | $8,000.00 |
| 96 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 13,042 | $2.75 | $2.80 |
| 97 | Work zone channelizing line, class I, 12", 740.06, type I (614E23410) | FT | 243 | $3.67 | $2.55 |
| 98 | Work zone gore marking, class II, 642 paint (614E28200) | FT | 1,655 | $3.00 | $3.00 |
| 99 | Roads for maintaining traffic (615E10000) | LS | 1 | $240,000 | $150,000 |
| 100 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 8,393 | $110.00 | $155.00 |
| 101 | Water (616E10000) | MGAL | 7 | $255.00 | $5.00 |
| 102 | Portable barrier, unanchored (622E41100) | FT | 4,920 | $10.00 | $18.00 |
| 103 | Portable barrier, anchored, as per plan (622E41111) | FT | 1,040 | $23.00 | $75.00 |
| 104 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 36 | $560.00 | $1,000.00 |
| 105 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $184,500 | $956,000 |
| 106 | Approach slab removed (202E22900) | SY | 228 | $110.00 | $100.00 |
| 107 | Wearing course removed (202E23500) | SY | 228 | $55.00 | $18.00 |
| 108 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $50,000 | $85,000 |
| 109 | Unclassified excavation (503E21300) | LS | 1 | $32,000 | $50,000 |
| 110 | Epoxy coated steel reinforcement (509E10000) | LB | 2,911 | $2.30 | $1.70 |
| 111 | Uncoated steel reinforcement (509E25000) | LB | 321 | $2.30 | $1.40 |
| 112 | Galvanized steel reinforcement (509E26000) | LB | 89,206 | $2.20 | $2.25 |
| 113 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 4,415 | $1.80 | $1.60 |
| 114 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 276 | $36.00 | $34.00 |
| 115 | Class QC2 concrete with QC/QA, superstructure (511E33312) | CY | 397 | $1,230.00 | $2,000.00 |
| 116 | Class QC2 concrete with QC/QA, bridge deck (parapet), as per plan (511E34451) | CY | 48 | $1,180.00 | $1,200.00 |
| 117 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 21 | $2,205.00 | $1,000.00 |
| 118 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 617 | $28.00 | $32.00 |
| 119 | Type 2 waterproofing (512E33000) | SY | 8 | $80.00 | $25.00 |
| 120 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 287 | $30.00 | $35.00 |
| 121 | 1/2" preformed expansion joint filler (516E13200) | SF | 84 | $9.00 | $5.00 |
| 122 | 1" preformed expansion joint filler (516E13600) | SF | 101 | $13.00 | $8.00 |
| 123 | Integral abutment expansion joint seal, as per plan (516E14015) | FT | 126 | $42.00 | $75.00 |
| 124 | Porous backfill with geotextile fabric (518E21200) | CY | 50 | $145.00 | $125.00 |
| 125 | 6" perforated corrugated plastic pipe (518E40000) | FT | 110 | $30.00 | $21.00 |
| 126 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 30 | $30.00 | $40.00 |
| 127 | Patching concrete structure, as per plan (519E11101) | SF | 68 | $200.00 | $150.00 |
| 128 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 241 | $530.00 | $500.00 |
| 129 | Type B installation (526E90020) | SY | 54 | $180.00 | $50.00 |
| 130 | Special - structures, misc.: coring holes in exist (530E00400) | EACH | 29 | $120.00 | $350.00 |
| 131 | Crushed aggregate slope protection, as per plan (601E20001) | SY | 34 | $70.00 | $80.00 |
| 132 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $184,500 | $956,000 |
| 133 | Approach slab removed (202E22900) | SY | 238 | $110.00 | $100.00 |
| 134 | Wearing course removed (202E23500) | SY | 238 | $55.00 | $18.00 |
| 135 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $50,000 | $85,000 |
| 136 | Unclassified excavation (503E21300) | LS | 1 | $32,000 | $50,000 |
| 137 | Epoxy coated steel reinforcement (509E10000) | LB | 2,975 | $2.30 | $1.70 |
| 138 | Uncoated steel reinforcement (509E25000) | LB | 316 | $2.30 | $1.40 |
| 139 | Chromium steel reinforcement (509E27000) | LB | 80,662 | $3.25 | $3.50 |
| 140 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 4,415 | $1.80 | $1.60 |
| 141 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 283 | $36.00 | $34.00 |
| 142 | Class QC2 concrete with QC/QA, superstructure (511E33312) | CY | 413 | $1,230.00 | $2,000.00 |
| 143 | Class QC2 concrete with QC/QA, bridge deck (parapet), as per plan (511E34451) | CY | 48 | $1,180.00 | $1,200.00 |
| 144 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 20 | $2,205.00 | $1,000.00 |
| 145 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 617 | $28.00 | $32.00 |
| 146 | Type 2 waterproofing (512E33000) | SY | 7 | $80.00 | $25.00 |
| 147 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 287 | $30.00 | $35.00 |
| 148 | 1/2" preformed expansion joint filler (516E13200) | SF | 88 | $9.00 | $5.00 |
| 149 | 1" preformed expansion joint filler (516E13600) | SF | 105 | $13.00 | $8.00 |
| 150 | Integral abutment expansion joint seal, as per plan (516E14015) | FT | 131 | $42.00 | $75.00 |
| 151 | Porous backfill with geotextile fabric (518E21200) | CY | 51 | $145.00 | $125.00 |
| 152 | 6" perforated corrugated plastic pipe (518E40000) | FT | 120 | $30.00 | $21.00 |
| 153 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 30 | $30.00 | $40.00 |
| 154 | Patching concrete structure, as per plan (519E11101) | SF | 5 | $200.00 | $150.00 |
| 155 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 251 | $530.00 | $700.00 |
| 156 | Type B installation (526E90020) | SY | 56 | $180.00 | $50.00 |
| 157 | Special - structures, misc.: coring holes in exist (530E00400) | EACH | 29 | $120.00 | $350.00 |
| 158 | Crushed aggregate slope protection, as per plan (601E20001) | SY | 34 | $70.00 | $80.00 |
| 159 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 30,000 | $1.00 | $1.00 |
| 160 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $28,650 | $85,000 |
| 161 | CPM progress schedule (108E10000) | LS | 1 | $5,000.00 | $16,000 |
| 162 | Maintaining traffic (614E11000) | LS | 1 | $400,000 | $700,000 |
| 163 | Field office, type C (619E16020) | MNTH | 20 | $3,500.00 | $2,500.00 |
| 164 | Construction layout stakes and surveying (623E10000) | LS | 1 | $50,000 | $35,000 |
| 165 | Mobilization (624E10000) | LS | 1 | $360,000 | $450,000 |
| 200 | Ground mounted structural beam support foundation (630E84500) | EACH | 2 | $1,072.50 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.