ODOT contract 260314 bid tabulation
RIC-US 42-03.22 (Lexington) (CULVERT REPLACEMENT). Let by Ohio DOT on June 25, 2026, RIC. 3 bids received; low bid $214,379 by Crawford Construction Company Inc, -18% against the engineer's estimate of $260,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 37
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Crawford Construction Company Inc | $214,379 | Low | -18% |
| 2 | BCC Ohio Inc | $228,340 | +7.0% | -12% |
| 3 | R & I Construction Inc | $317,951 | +48% | +22% |
Engineer's estimate: $260,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crawford Construction Company Inc | 2. BCC Ohio Inc | 3. R & I Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,100.00 | $3,870.00 | $2,000.00 |
| 2 | Structure removed, as per plan (202E11001) | LS | 1 | $17,000 | $7,740.00 | $42,000 |
| 3 | Pavement removed (202E23000) | SY | 277 | $10.00 | $23.45 | $10.00 |
| 4 | Guardrail removed (202E38000) | FT | 200 | $11.00 | $2.52 | $1.00 |
| 5 | Excavation (203E10000) | CY | 77 | $32.00 | $12.91 | $10.00 |
| 6 | Embankment (203E20000) | CY | 200 | $33.00 | $30.60 | $20.00 |
| 7 | Subgrade compaction (204E10000) | SY | 293 | $2.35 | $2.58 | $1.00 |
| 8 | Guardrail, type 5 (606E13000) | FT | 200 | $60.00 | $40.11 | $56.50 |
| 9 | Monument assembly, type C (623E38500) | EACH | 2 | $1,600.00 | $2,610.75 | $1,000.00 |
| 10 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $749.00 | $1,890.00 | $500.00 |
| 11 | Post construction survey monument verification and report (623E51000) | LS | 1 | $749.00 | $1,890.00 | $500.00 |
| 12 | Rock channel protection, type B with filter (601E32100) | CY | 15 | $214.00 | $228.60 | $100.00 |
| 13 | Topsoil (659E00300) | CY | 54 | $77.00 | $67.80 | $50.00 |
| 14 | Seeding and mulching (659E10000) | SY | 487 | $7.00 | $3.57 | $6.00 |
| 15 | Repair seeding and mulching (659E14000) | SY | 24 | $1.00 | $3.15 | $0.50 |
| 16 | Inter-seeding (659E15000) | SY | 24 | $1.00 | $0.63 | $0.50 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.07 | $1,090.00 | $840.00 | $500.00 |
| 18 | Lime (659E31000) | ACRE | 0.10 | $545.00 | $0.30 | $10.00 |
| 19 | Water (659E35000) | MGAL | 3 | $7.00 | $0.32 | $1.00 |
| 20 | Erosion control (832E30000) | EACH | 2,500 | $1.00 | $1.00 | $1.00 |
| 21 | Concrete masonry (602E20000) | CY | 6.28 | $1,600.00 | $1,750.02 | $2,000.00 |
| 22 | Aggregate drains (605E31100) | FT | 20 | $32.00 | $38.40 | $10.00 |
| 23 | 72" conduit, type A, 706.02, 707.85, 707.02 (0.10 (611E26000) | FT | 100 | $680.00 | $778.83 | $1,290.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 53 | $430.00 | $388.50 | $375.00 |
| 25 | Aggregate base (304E20000) | CY | 47 | $177.00 | $155.47 | $100.00 |
| 26 | Non-tracking tack coat (407E20000) | GAL | 20 | $10.00 | $15.75 | $6.00 |
| 27 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 22 | $430.00 | $467.25 | $575.00 |
| 28 | 8" water main ductile iron pipe ansi class 52, push-on joints and fittings (638E01200) | FT | 50 | $160.00 | $217.80 | $402.00 |
| 29 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 4 | $14.00 | $13.13 | $13.00 |
| 30 | Edge line, 6", type 1 (642E00104) | MI | 0.03 | $43,400 | $26,250 | $25,000 |
| 31 | Center line, type 1 (642E00300) | MI | 0.02 | $51,750 | $26,250 | $25,000 |
| 32 | Detour signing (614E12420) | LS | 1 | $3,500.00 | $5,192.49 | $3,250.00 |
| 33 | Water (616E10000) | MGAL | 1 | $22.00 | $12.60 | $1.00 |
| 34 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,260.00 | $2,818.99 | $3,600.00 |
| 35 | Maintaining traffic (614E11000) | LS | 1 | $1,150.00 | $2,554.20 | $1,075.00 |
| 36 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,500.00 | $3,390.00 | $3,500.00 |
| 37 | Mobilization (624E10000) | LS | 1 | $10,100 | $19,001 | $30,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.