ODOT contract 250468 bid tabulation
MAR-SR 37-08.44 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on October 9, 2025, MAR. 4 bids received; low bid $2,572,669 by Miller Bros Const Inc, -20% against the engineer's estimate of $3,230,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 109
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Bros Const Inc | $2,572,669 | Low | -20% |
| 2 | Rietschlin Construction Inc | $2,989,969 | +16% | -7.0% |
| 3 | Complete General Construction Company | $3,029,139 | +18% | -6.0% |
| 4 | Shelly & Sands Inc | $3,128,605 | +22% | -3.0% |
Engineer's estimate: $3,230,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Bros Const Inc | 2. Rietschlin Construction Inc | 3. Complete General Construction Company | 4. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,400 | $7,000.00 | $10,000 | $3,500.00 |
| 2 | Pavement removed (202E23000) | SY | 932 | $31.68 | $22.00 | $20.00 | $18.60 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 1,029 | $22.73 | $15.00 | $30.00 | $8.00 |
| 4 | Guardrail removed (202E38000) | FT | 271 | $3.00 | $6.00 | $3.00 | $3.50 |
| 5 | Catch basin removed (202E58100) | EACH | 5 | $428.35 | $600.00 | $640.00 | $150.00 |
| 6 | Fence removed (202E75000) | FT | 27 | $10.00 | $61.00 | $5.00 | $8.00 |
| 7 | Excavation (203E10000) | CY | 1,018 | $50.79 | $30.00 | $34.00 | $32.00 |
| 8 | Embankment (203E20000) | CY | 62 | $7.85 | $30.00 | $39.00 | $22.00 |
| 9 | Subgrade compaction (204E10000) | SY | 1,234 | $4.42 | $2.50 | $4.50 | $4.50 |
| 10 | Excavation of subgrade (204E13000) | CY | 124 | $33.47 | $30.00 | $48.00 | $43.00 |
| 11 | Granular material, type B (204E30010) | CY | 124 | $53.72 | $77.00 | $80.00 | $85.00 |
| 12 | Proof rolling (204E45000) | HR | 1 | $318.38 | $625.00 | $140.00 | $222.00 |
| 13 | Geotextile fabric (204E50000) | SY | 298 | $2.54 | $3.50 | $3.00 | $3.00 |
| 14 | Guardrail, type MGS (606E15050) | FT | 75 | $19.00 | $23.25 | $21.20 | $21.00 |
| 15 | Guardrail, type MGS with long posts (606E15100) | FT | 87.50 | $22.00 | $24.25 | $24.40 | $22.00 |
| 16 | Anchor assembly, MGS type E(MASH 2016) (606E26150) | EACH | 2 | $2,450.00 | $2,725.00 | $2,475.00 | $2,500.00 |
| 17 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,350.00 | $1,308.00 | $1,365.00 | $1,200.00 |
| 18 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,350.00 | $2,725.00 | $2,380.00 | $2,500.00 |
| 19 | Fence, type 47 (607E15000) | FT | 27 | $25.00 | $50.00 | $65.00 | $45.00 |
| 20 | Special - mailbox support (690E50000) | EACH | 2 | $200.00 | $218.00 | $220.00 | $150.00 |
| 21 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $3,000.00 | $6,540.00 | $5,400.00 | $6,600.00 |
| 22 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 15 | $125.26 | $182.00 | $110.00 | $130.00 |
| 23 | Rock channel protection, type C with filter (601E32200) | CY | 369 | $67.25 | $125.00 | $120.00 | $105.00 |
| 24 | Soil analysis test (659E00100) | EACH | 1 | $75.00 | $163.50 | $150.00 | $150.00 |
| 25 | Topsoil (659E00300) | CY | 84 | $44.42 | $50.00 | $43.00 | $65.00 |
| 26 | Seeding and mulching (659E10000) | SY | 722 | $4.00 | $4.50 | $4.50 | $4.50 |
| 27 | Repair seeding and mulching (659E14000) | SY | 38 | $12.00 | $4.50 | $4.50 | $4.50 |
| 28 | Inter-seeding (659E15000) | SY | 38 | $6.00 | $4.50 | $4.50 | $4.50 |
| 29 | Commercial fertilizer (659E20000) | TON | 0.17 | $800.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 30 | Lime (659E31000) | ACRE | 0.16 | $10.00 | $200.00 | $150.00 | $150.00 |
| 31 | Water (659E35000) | MGAL | 7 | $10.00 | $22.00 | $1.00 | $1.00 |
| 32 | Mowing (659E40000) | MSF | 1.69 | $1.00 | $650.00 | $1,000.00 | $1,000.00 |
| 33 | Slope erosion protection (670E00500) | SY | 552 | $3.10 | $5.00 | $2.50 | $2.50 |
| 34 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,455.00 | $1,744.00 | $2,500.00 | $2,500.00 |
| 35 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $4,280.00 | $5,450.00 | $16,600 | $16,600 |
| 36 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $3,819.82 | $4,360.00 | $3,900.00 | $4,100.00 |
| 37 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 38 | Concrete masonry (602E20000) | CY | 2 | $1,472.58 | $1,800.00 | $1,200.00 | $2,250.00 |
| 39 | 6" unclassified pipe underdrains (605E13300) | FT | 72 | $19.96 | $31.00 | $23.00 | $30.00 |
| 40 | 6" base pipe underdrains (605E14000) | FT | 612 | $18.00 | $17.00 | $25.00 | $20.00 |
| 41 | 4" conduit, type E (611E00400) | FT | 100 | $16.87 | $19.00 | $28.00 | $19.00 |
| 42 | 4" conduit, type F (611E00406) | FT | 100 | $26.94 | $19.00 | $42.00 | $13.00 |
| 43 | 6" conduit, type F (611E01500) | FT | 63 | $39.31 | $33.00 | $45.00 | $34.00 |
| 44 | 12" conduit, type C (611E04600) | FT | 290 | $71.89 | $55.00 | $90.00 | $92.00 |
| 45 | 15" conduit, type C (611E06100) | FT | 495 | $81.27 | $65.00 | $75.00 | $105.00 |
| 46 | 18" conduit, type C (611E07600) | FT | 258 | $98.95 | $70.00 | $100.00 | $115.00 |
| 47 | Catch basin, no. 2-2B (611E98470) | EACH | 6 | $1,827.40 | $2,250.00 | $2,600.00 | $3,700.00 |
| 48 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $594.97 | $510.00 | $380.00 | $500.00 |
| 49 | Drainage structure, misc.:check valve for 15" cond (611E99900) | EACH | 1 | $9,255.05 | $5,000.00 | $5,000.00 | $5,000.00 |
| 50 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 190 | $255.00 | $281.00 | $255.00 | $270.00 |
| 51 | Aggregate base (304E20000) | CY | 174 | $104.89 | $110.00 | $133.00 | $85.00 |
| 52 | Non-tracking tack coat (407E20000) | GAL | 94 | $4.50 | $5.00 | $4.50 | $3.50 |
| 53 | Stabilized crushed aggregate (411E10000) | CY | 103 | $89.51 | $116.00 | $132.00 | $90.00 |
| 54 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 72 | $360.00 | $393.00 | $360.00 | $415.00 |
| 55 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 4 | $650.00 | $708.50 | $650.00 | $415.00 |
| 56 | RPM (621E00100) | EACH | 5 | $900.00 | $763.00 | $700.00 | $700.00 |
| 57 | Raised pavement marker removed (621E54000) | EACH | 6 | $32.21 | $50.00 | $35.00 | $7.00 |
| 58 | Ground mounted support, no. 3 post (630E03100) | FT | 54 | $16.50 | $20.00 | $29.00 | $18.00 |
| 59 | Sign post reflector (630E08600) | EACH | 5 | $65.00 | $54.50 | $45.00 | $50.00 |
| 60 | Sign, flat sheet (630E80100) | SF | 23 | $18.00 | $28.00 | $33.00 | $25.00 |
| 61 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $30.00 | $28.00 | $10.00 | $20.00 |
| 62 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $35.00 | $28.00 | $15.00 | $25.00 |
| 63 | Removal of ground mounted wooden box beam support (630E86292) | EACH | 1 | $85.00 | $272.50 | $325.00 | $25.00 |
| 64 | Edge line, 6", type 1 (642E00104) | MI | 0.14 | $1,650.00 | $900.00 | $790.00 | $4,500.00 |
| 65 | Center line, type 1 (642E00300) | MI | 2.07 | $1,650.00 | $1,300.00 | $1,100.00 | $1,500.00 |
| 66 | Edge line, 6" (646E10010) | MI | 0.10 | $22,800 | $41,420 | $38,000 | $30,000 |
| 67 | Center line (646E10200) | MI | 0.05 | $35,900 | $41,420 | $38,000 | $60,000 |
| 68 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $99.27 | $98.00 | $95.00 | $110.00 |
| 69 | Detour signing (614E12420) | LS | 1 | $9,695.00 | $13,000 | $9,700.00 | $4,900.00 |
| 70 | Asphalt concrete for maintaining traffic (614E13000) | CY | 4 | $850.00 | $708.50 | $340.00 | $700.00 |
| 71 | Water (616E10000) | MGAL | 2 | $75.07 | $22.00 | $150.00 | $155.00 |
| 72 | Structure removed, over 20 foot span (202E11002) | LS | 1 | $103,750 | $110,000 | $225,000 | $120,000 |
| 73 | Wearing course removed (202E23500) | SY | 665 | $5.46 | $4.00 | $13.00 | $9.00 |
| 74 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $106,081 | $275,000 | $75,000 | $46,000 |
| 75 | Unclassified excavation (503E21300) | LS | 1 | $22,226 | $55,000 | $30,000 | $35,000 |
| 76 | Pile driving equipment mobilization (505E11100) | LS | 1 | $9,659.08 | $16,100 | $21,000 | $22,000 |
| 77 | Steel piles HP10X42, furnished (507E00100) | FT | 560 | $34.42 | $33.00 | $55.00 | $28.94 |
| 78 | Steel piles HP10X42, driven (507E00150) | FT | 480 | $25.10 | $40.00 | $15.00 | $42.00 |
| 79 | Galvanized steel reinforcement (509E26000) | LB | 85,970 | $1.83 | $2.00 | $2.14 | $2.20 |
| 80 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 230 | $977.21 | $1,050.00 | $1,300.00 | $1,400.00 |
| 81 | Class QC1 concrete with QC/QA, pier above footings (511E40512) | CY | 115 | $555.84 | $700.00 | $1,100.00 | $1,650.00 |
| 82 | Class QC1 concrete with QC/QA, abutment including footing (511E43512) | CY | 68 | $703.03 | $775.00 | $1,100.00 | $1,250.00 |
| 83 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 31 | $750.71 | $680.00 | $800.00 | $1,150.00 |
| 84 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 373 | $11.68 | $16.00 | $14.50 | $14.50 |
| 85 | Type 2 waterproofing (512E33000) | SY | 11 | $56.88 | $45.00 | $50.00 | $65.00 |
| 86 | Structural steel members, level 2, as per plan (513E10241) | LB | 284,200 | $2.21 | $2.79 | $2.60 | $2.75 |
| 87 | Welded stud shear connectors (513E20000) | EACH | 2,640 | $4.60 | $6.00 | $5.40 | $5.40 |
| 88 | Armorless preformed joint seal (516E10010) | FT | 69 | $41.30 | $138.00 | $125.00 | $125.00 |
| 89 | 1/2" preformed expansion joint filler (516E13200) | SF | 63 | $4.92 | $16.00 | $12.00 | $4.50 |
| 90 | 1" preformed expansion joint filler (516E13600) | SF | 63 | $6.45 | $17.00 | $13.00 | $5.50 |
| 91 | 2" preformed expansion joint filler (516E13900) | SF | 44 | $11.12 | $20.00 | $14.00 | $8.00 |
| 92 | Integral abutment expansion joint seal (516E14014) | FT | 97 | $28.83 | $40.00 | $49.00 | $49.00 |
| 93 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 10 | $1,799.67 | $1,800.00 | $1,100.00 | $1,440.00 |
| 94 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 10 | $1,598.88 | $1,500.00 | $1,200.00 | $1,320.00 |
| 95 | Railing (three steel tube bridge railing) (517E70100) | FT | 414 | $444.75 | $493.00 | $473.00 | $448.00 |
| 96 | Porous backfill with geotextile fabric (518E21200) | CY | 64 | $99.93 | $96.00 | $120.00 | $140.00 |
| 97 | Special - steel drip strip (518E22300) | FT | 462.64 | $15.48 | $16.50 | $16.25 | $16.25 |
| 98 | 6" perforated corrugated plastic pipe (518E40000) | FT | 108 | $11.60 | $17.00 | $12.00 | $5.00 |
| 99 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 38 | $27.20 | $26.00 | $22.00 | $5.00 |
| 100 | Drilled shafts, 30" diameter into bedrock, as per plan (524E94605) | FT | 188 | $606.71 | $550.00 | $360.00 | $530.00 |
| 101 | Drilled shafts, 36" diameter, above bedrock (524E94702) | FT | 109 | $275.00 | $305.00 | $590.00 | $617.00 |
| 102 | Drilled shafts, misc.: thermal integrity profiler (524E95100) | EACH | 2 | $3,500.00 | $3,815.00 | $4,000.00 | $3,500.00 |
| 103 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 143 | $394.46 | $430.00 | $450.00 | $500.00 |
| 104 | Type C installation (526E90030) | FT | 69 | $236.75 | $185.00 | $400.00 | $275.00 |
| 105 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,448 | $28,000 | $19,000 | $17,300 |
| 106 | Maintaining traffic (614E11000) | LS | 1 | $5,964.64 | $5,000.00 | $10,000 | $4,500.00 |
| 107 | Field office, type B (619E16010) | MNTH | 6 | $3,028.65 | $1,600.00 | $3,500.00 | $4,700.00 |
| 108 | Construction layout stakes and surveying (623E10000) | LS | 1 | $25,500 | $14,000 | $12,000 | $33,000 |
| 109 | Mobilization (624E10000) | LS | 1 | $128,633 | $100,000 | $100,000 | $156,850 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.