ODOT contract 254016 bid tabulation
PAU-SR 111-01.65 (CULVERT REPLACEMENT). Let by Ohio DOT on May 8, 2025, PAU. 3 bids received; low bid $317,786 by Sand Ridge Excavating, -17% against the engineer's estimate of $381,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sand Ridge Excavating | $317,786 | Low | -17% |
| 2 | Vernon Nagel Inc | $331,156 | +4.0% | -13% |
| 3 | Fenson Contracting LLC | $349,564 | +10% | -8.0% |
Engineer's estimate: $381,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sand Ridge Excavating | 2. Vernon Nagel Inc | 3. Fenson Contracting LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,000.00 | $1,000.00 | $5,000.00 |
| 2 | Structure removed (202E11000) | LS | 1 | $6,500.00 | $20,000 | $12,000 |
| 3 | Headwall removed (202E20010) | EACH | 2 | $3,000.00 | $850.00 | $750.00 |
| 4 | Pavement removed (202E23000) | SY | 493 | $6.00 | $16.00 | $18.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 75 | $30.00 | $14.00 | $43.75 |
| 6 | Excavation (203E10000) | CY | 382 | $8.00 | $20.00 | $45.25 |
| 7 | Embankment (203E20000) | CY | 65 | $15.00 | $20.00 | $27.25 |
| 8 | Subgrade compaction (204E10000) | SY | 550 | $4.00 | $1.00 | $4.00 |
| 9 | Monument assembly, type D (623E38550) | EACH | 4 | $916.27 | $600.00 | $1,300.00 |
| 10 | Right-of-way monument, type B (623E40520) | EACH | 3 | $306.38 | $800.00 | $1,200.00 |
| 11 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,500.00 | $1,500.00 | $3,350.00 |
| 12 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,500.00 | $1,500.00 | $3,350.00 |
| 13 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 26 | $114.51 | $125.00 | $135.00 |
| 14 | Rock channel protection, type C with filter (601E32200) | CY | 2 | $857.44 | $170.00 | $350.00 |
| 15 | Topsoil (659E00300) | CY | 121 | $15.00 | $25.00 | $61.00 |
| 16 | Seeding and mulching (659E10000) | SY | 1,086 | $5.04 | $3.00 | $5.85 |
| 17 | Repair seeding and mulching (659E14000) | SY | 54 | $2.64 | $3.00 | $3.40 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.15 | $744.00 | $850.00 | $950.00 |
| 19 | Lime (659E31000) | ACRE | 0.22 | $60.00 | $35.00 | $39.00 |
| 20 | Water (659E35000) | MGAL | 6 | $1.00 | $1.00 | $1.00 |
| 21 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 |
| 22 | Concrete masonry (602E20000) | CY | 50 | $744.07 | $1,200.00 | $1,090.00 |
| 23 | Aggregate drains (605E31100) | FT | 48 | $30.00 | $14.00 | $24.50 |
| 24 | 6" conduit, type F (611E01500) | FT | 20 | $27.80 | $12.00 | $23.25 |
| 25 | 8" conduit, type E (611E02500) | FT | 10 | $34.00 | $14.00 | $46.25 |
| 26 | 10" conduit, type F (611E03700) | FT | 23 | $38.40 | $75.00 | $42.50 |
| 27 | 12" conduit, type B (611E04400) | FT | 70 | $60.33 | $100.00 | $70.25 |
| 28 | 84" conduit, type A, 706.02, 707.35 or 707.01 W/ C (611E28000) | FT | 50 | $1,064.29 | $1,600.00 | $1,355.00 |
| 29 | Low strength mortar backfill, as per plan (613E41201) | CY | 73 | $146.12 | $120.00 | $153.00 |
| 30 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 57 | $637.50 | $425.00 | $485.00 |
| 31 | Aggregate base (304E20000) | CY | 114 | $89.05 | $75.00 | $80.00 |
| 32 | Non-tracking tack coat (407E20000) | GAL | 54 | $3.75 | $2.50 | $2.80 |
| 33 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 41 | $682.50 | $455.00 | $522.00 |
| 34 | RPM (621E00100) | EACH | 3 | $1,530.00 | $900.00 | $1,425.00 |
| 35 | Raised pavement marker removed (621E54000) | EACH | 3 | $30.00 | $30.00 | $5.00 |
| 36 | Edge line, 6", type 1 (642E00104) | MI | 0.06 | $10,500 | $20,732 | $7,850.00 |
| 37 | Center line, type 1 (642E00300) | MI | 0.03 | $21,000 | $27,747 | $15,700 |
| 38 | Pavement repair (253E02000) | CY | 20 | $552.00 | $460.00 | $615.00 |
| 39 | Non-tracking tack coat (407E20000) | GAL | 20 | $3.00 | $2.50 | $2.80 |
| 40 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 10 | $600.00 | $500.00 | $585.00 |
| 41 | Work zone center line, class II (614E21400) | MI | 0.03 | $18,000 | $27,747 | $16,800 |
| 42 | Water (616E10000) | MGAL | 1 | $1.00 | $1.00 | $165.00 |
| 43 | Compacted aggregate (617E10100) | CY | 50 | $104.54 | $100.00 | $56.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $6,000.00 | $3,625.00 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $3,500.00 | $9,000.00 |
| 46 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $3,500.00 | $4,600.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $15,000 | $14,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.