ODOT contract 264009 bid tabulation
MOT-/CLA BH FY26 (BRIDGE REPAIR). Let by Ohio DOT on April 23, 2026, MOT. 2 bids received; low bid $537,104 by BCC Ohio Inc, -13% against the engineer's estimate of $620,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 33
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $537,104 | Low | -13% |
| 2 | Legend Painting Inc | $964,835 | +80% | +56% |
Engineer's estimate: $620,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Legend Painting Inc |
|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 4 | $258.00 | $2,500.00 |
| 2 | Erosion control (832E30000) | EACH | 1,100 | $1.00 | $1.00 |
| 3 | Asphalt concrete surface course, 12.5 MM, type A (448), as per plan (442E20001) | CY | 1 | $1,482.00 | $4,500.00 |
| 4 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 48 | $94.50 | $150.00 |
| 5 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,509.50 | $3,920.00 |
| 6 | Detour signing (614E12420) | LS | 1 | $7,064.90 | $1,500.00 |
| 7 | Barrier reflector, type 1 (unidirectional) (614E13310) | EACH | 8 | $12.45 | $35.00 |
| 8 | Object marker, one way (614E13350) | EACH | 8 | $17.81 | $500.00 |
| 9 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.20 | $37,530 | $12,000 |
| 10 | Portable barrier, unanchored (622E41100) | FT | 320 | $50.18 | $85.00 |
| 11 | Patching concrete structure, as per plan (519E11101) | SF | 81 | $152.55 | $395.00 |
| 12 | Patching concrete structure, as per plan (519E11101) | SF | 80 | $152.55 | $395.00 |
| 13 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $3,321.00 | $15,000 |
| 14 | Bridge railing removed for reuse (202E38602) | FT | 25 | $198.45 | $189.00 |
| 15 | Epoxy coated steel reinforcement (509E10000) | LB | 50 | $40.20 | $10.00 |
| 16 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 50 | $40.20 | $10.00 |
| 17 | Class QC2 concrete, superstructure (511E34410) | CY | 2 | $3,834.00 | $3,500.00 |
| 18 | Railing, misc.: type B anchors (517E76302) | EACH | 12 | $108.83 | $1,500.00 |
| 19 | Patching concrete structure, as per plan (519E11101) | SF | 53 | $140.55 | $395.00 |
| 20 | Patching concrete structure, as per plan (519E11101) | SF | 54 | $140.55 | $425.00 |
| 21 | Patching concrete structure, as per plan (519E11101) | SF | 24 | $140.55 | $425.00 |
| 22 | Patching concrete structure, as per plan (519E11101) | SF | 177 | $140.55 | $375.00 |
| 23 | Patching concrete structure, as per plan (519E11101) | SF | 189 | $140.55 | $375.00 |
| 24 | Patching concrete structure, as per plan (519E11101) | SF | 199 | $140.55 | $295.00 |
| 25 | Field painting, misc.: zinc rich primer (514E27700) | SF | 105 | $16.89 | $75.00 |
| 26 | Patching concrete structure, as per plan (519E11101) | SF | 135 | $140.55 | $295.00 |
| 27 | Patching concrete structure, as per plan (519E11101) | SF | 356 | $140.55 | $275.00 |
| 28 | Patching concrete structure, as per plan (519E11101) | SF | 625 | $140.55 | $275.00 |
| 29 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,250.00 | $20,000 |
| 30 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,630.92 | $10,000 |
| 31 | Maintaining traffic (614E11000) | LS | 1 | $74,072 | $50,000 |
| 32 | Mobilization (624E10000) | LS | 1 | $89,401 | $70,000 |
| 100 | Patching concrete bridge deck - type B (519E12300) | SY | 23 | $779.70 | $3,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.