ODOT contract 260217 bid tabulation

CUY-IR 480-16.56 Slide (SLIDE REPAIR). Let by Ohio DOT on April 23, 2026, CUY. 4 bids received; low bid $803,461 by Eclipse Co LLC, +12% against the engineer's estimate of $718,000.

Owner
Ohio DOT
Letting
23 APR 2026
Pay items
74
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Eclipse Co LLC$803,461Low+12%
2Great Lakes Construction Co$860,890+7.0%+20%
3Daniel R Schmoldt Enterprises Inc$889,498+11%+24%
4Madex Construction Co$894,393+11%+25%
ODOT contract 260217: bids by rank

Engineer's estimate: $718,000.

Bid tabulation

LinePay itemUnitQuantity1. Eclipse Co LLC2. Great Lakes Construction Co3. Daniel R Schmoldt Enterprises Inc4. Madex Construction Co
1Clearing and grubbing (201E11000)LS1$10,000$18,750$5,000.00$6,264.90
2Pavement removed (202E23000)SY41$65.00$40.00$52.00$91.18
3Pipe removed, 24" and under, as per plan (202E35101)FT262$28.88$38.00$38.00$17.49
4Guardrail removed (202E38000)FT325$2.09$2.00$3.00$5.79
5Fence removed (202E75000)FT347$4.17$4.00$12.00$6.95
6Excavation (203E10000)CY8,065$16.71$26.75$26.00$24.48
7Embankment (203E20000)CY8,916$30.82$24.00$26.00$27.29
8Granular embankment (203E35000)CY60$115.00$115.00$131.00$95.79
9Guardrail, type MGS (606E15050)FT325$28.88$27.60$52.00$31.96
10Fence, type CLT (607E23000)FT335$40.82$39.20$68.00$46.32
11Fence, misc.: temporary orange plastic constructio (607E98200)LS1$1,810.38$5,500.00$1,500.00$1,157.89
12Riprap (601E10000)SY3$338.68$1,200.00$250.00$1,042.11
13Rock channel protection, type B with filter (601E32100)CY12$205.69$225.00$250.00$347.37
14Rock channel protection, type C with filter (601E32200)CY22$181.43$225.00$250.00$243.16
15Rock channel protection, misc.: 40% type B/60% typ (601E35000)CY11$199.15$225.00$250.00$358.95
16Soil analysis test (659E00100)EACH2$25.00$25.00$500.00$89.47
17Topsoil (659E00300)CY505$44.04$40.00$40.00$57.89
18Seeding and mulching (659E10000)SY4,549$1.95$1.95$3.00$4.34
19Repair seeding and mulching (659E14000)SY228$1.95$1.95$5.00$2.32
20Inter-seeding (659E15000)SY228$0.20$0.20$5.00$2.32
21Commercial fertilizer (659E20000)TON0.64$250.00$250.00$1,200.00$2,315.80
22Lime (659E31000)ACRE0.94$25.00$25.00$700.00$578.95
23Water (659E35000)MGAL26$1.00$1.00$10.00$17.37
24Slope erosion protection mat, type B (670E00520)SY3,898$1.25$1.25$2.00$4.63
25Storm water pollution prevention plan (832E15000)LS1$3,800.00$4,000.00$3,600.00$2,894.74
26Storm water pollution prevention inspections (832E15002)LS1$2,000.00$6,500.00$6,500.00$2,778.96
27Storm water pollution prevention inspection software (832E15010)LS1$1,597.71$2,000.00$1,500.00$2,315.79
28Erosion control, as per plan (832E30001)EACH3,000$1.00$1.00$1.00$1.00
29Seeding and erosion control with turf reinforcing mat, type 1 (836E10000)SY222$4.25$4.25$5.00$11.58
30Concrete masonry (602E20000)CY1$2,892.70$3,000.00$2,200.00$2,894.74
316" shallow pipe underdrains with geotextile fabric (605E11110)FT325$28.05$23.00$45.00$30.11
326" unclassified pipe underdrains (605E13300)FT300$15.49$25.00$41.00$13.16
336" conduit, type F for underdrain outlets (611E00510)FT50$19.87$30.00$54.00$13.16
34Precast reinforced concrete outlet (611E99710)EACH3$491.00$450.00$220.00$178.95
35Full depth pavement sawing (252E01500)FT328$8.06$10.00$4.00$5.79
36Pavement planing, asphalt concrete (1.5") (254E01000)SY592$13.57$22.00$11.00$11.58
37Pavement planing, asphalt concrete (3.5") (254E01000)SY73$64.86$35.00$55.00$63.68
38Asphalt concrete base, PG64-22, (449) (301E56000)CY15$740.86$490.00$665.00$700.53
39Aggregate base (304E20000)CY15$116.62$150.00$250.00$138.95
40Tack coat (407E10000)GAL37$2.45$4.00$2.55$2.00
41Non-tracking tack coat (407E20000)GAL35$2.45$4.00$2.55$2.00
42Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY25$1,054.87$930.00$950.00$1,013.16
43Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101)CY17$1,054.87$735.00$950.00$1,013.16
44Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300)CY12$1,054.87$820.00$950.00$1,013.16
45Rumble strips, shoulder (asphalt concrete) (618E40100)FT2,112$3.43$3.43$4.00$4.63
46Longitudinal joint adhesive (875E10000)LB246$4.91$4.00$5.00$4.00
47RPM (621E00100)EACH68$58.00$58.00$64.00$69.47
48Barrier reflector, type 2, one way (626E00110)EACH6$26.68$12.50$15.00$17.37
49Edge line, 6", type 1 (642E00104)MI0.57$1,600.00$1,600.00$2,800.00$1,968.42
50Lane line, 6", type 1 (642E00204)MI0.41$1,600.00$1,600.00$1,400.00$1,968.41
51Channelizing line, 12", type 1 (642E00404)FT282$2.00$2.00$2.50$2.89
52Dotted line, 6", type 1 (642E01510)FT339$1.00$1.00$2.00$1.74
53Law enforcement officer with patrol car for assistance (614E11110)HR32$75.00$110.00$155.00$115.79
54Increased barrier delineation (614E11630)FT1,042$1.86$1.86$2.05$2.32
55Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH1$3,390.29$2,234.57$3,100.00$2,663.16
56Work zone raised pavement marker, as per plan (614E12801)EACH75$8.70$8.70$9.60$10.42
57Barrier reflector, type 1, BI-directional (614E13310)EACH22$10.67$10.67$11.74$17.37
58Object marker, one way (614E13350)EACH22$21.90$21.90$24.10$28.95
59Portable changeable message sign (614E18600)SNMT4$1,071.51$1,071.51$1,100.00$1,273.68
60Work zone lane line, class I, 6", 873 (614E20356)MI0.25$6,315.00$6,315.00$11,000$7,526.32
61Work zone edge line, class I, 6", 873 (614E22326)MI0.75$12,169$12,169$15,000$14,358
62Work zone channelizing line, class I, 12", 873 (614E23130)FT1,080$4.27$4.27$6.00$5.21
63Work zone dotted line, class I, 6", 873 (614E24122)FT360$1.11$1.11$2.50$1.45
64Water (616E10000)MGAL51$1.00$50.00$5.00$7.37
65Portable barrier, unanchored (622E41100)FT242$34.64$40.00$38.10$40.53
66Portable barrier, anchored (622E41110)FT800$39.67$40.00$44.00$46.32
67Removal of pavement marking (644E30030)MI2$1,500.00$1,500.00$550.00$1,852.63
68Premium for contract performance bond and for payment bond (103E05000)LS1$9,840.12$8,000.00$17,441$16,820
69CPM progress schedule short duration projects (108E30000)LS1$1,170.47$1,250.00$1,500.00$5,210.53
70Maintaining traffic (614E11000)LS1$42,280$39,000$31,000$21,692
72Construction layout stakes and surveying, as per plan (623E10001)LS1$6,492.07$17,500$10,000$11,579
73Preconstruction survey monument verification and report (623E50000)LS1$1,500.00$2,500.00$3,500.00$5,473.68
74Post construction survey monument verification and report (623E51000)LS1$1,500.00$2,500.00$3,500.00$3,473.68
75Mobilization (624E10000)LS1$27,418$42,500$25,000$33,791
ODOT contract 260217: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy