ODOT contract 260198 bid tabulation
FAI-SR 204-04.30 (INTERSECTION). Let by Ohio DOT on April 23, 2026, FAI. 4 bids received; low bid $2,144,982 by Shelly Company, -3.0% against the engineer's estimate of $2,212,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 140
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $2,144,982 | Low | -3.0% |
| 2 | Strawser Paving Co Inc | $2,161,199 | +1.0% | -2.0% |
| 3 | Complete General Construction Company | $2,261,519 | +5.0% | +2.0% |
| 4 | Axis Civil Construction LLC | $2,392,135 | +12% | +8.0% |
Engineer's estimate: $2,212,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Strawser Paving Co Inc | 3. Complete General Construction Company | 4. Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,500 | $17,500 | $31,500 | $25,000 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $375.00 | $600.00 | $400.00 | $600.00 |
| 3 | Pavement removed (202E23000) | SY | 5,875 | $7.85 | $11.00 | $12.00 | $13.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 172 | $52.00 | $26.00 | $24.00 | $15.00 |
| 5 | Guardrail removed (202E38000) | FT | 328 | $2.00 | $5.00 | $2.00 | $8.00 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $145.00 | $250.00 | $145.00 | $800.00 |
| 7 | Mailbox removed (202E53100) | EACH | 1 | $35.00 | $98.50 | $71.11 | $350.00 |
| 8 | Catch basin removed (202E58100) | EACH | 2 | $735.00 | $289.00 | $450.00 | $1,000.00 |
| 9 | Valve box removed (202E75610) | EACH | 4 | $365.00 | $400.00 | $175.00 | $400.00 |
| 10 | Removal misc.:in-ground lights (202E98100) | EACH | 2 | $100.00 | $100.00 | $400.00 | $100.00 |
| 11 | Removal misc.:light pole (202E98100) | EACH | 2 | $500.00 | $500.00 | $400.00 | $500.00 |
| 12 | Removal misc.:stone pillars with lights (202E98100) | EACH | 2 | $300.00 | $800.00 | $600.00 | $300.00 |
| 13 | Excavation (203E10000) | CY | 2,459 | $44.25 | $16.50 | $32.00 | $33.00 |
| 14 | Excavation, as per plan (203E10001) | CY | 208 | $71.50 | $50.00 | $36.00 | $33.00 |
| 15 | Excavation, as per plan (203E10001) | CY | 845 | $43.65 | $41.00 | $36.00 | $42.00 |
| 16 | Embankment (203E20000) | CY | 2,360 | $31.00 | $19.86 | $7.00 | $28.00 |
| 17 | Embankment, as per plan (203E20001) | CY | 845 | $31.65 | $14.00 | $13.00 | $46.00 |
| 18 | Subgrade compaction (204E10000) | SY | 1,674 | $1.65 | $1.00 | $4.00 | $3.00 |
| 19 | Proof rolling (204E45000) | HR | 5 | $270.00 | $196.50 | $250.00 | $1,000.00 |
| 20 | Cement (206E10500) | TON | 216 | $221.55 | $221.50 | $221.55 | $225.00 |
| 21 | Curing coat (206E11000) | SY | 8,361 | $1.29 | $1.30 | $1.29 | $1.30 |
| 22 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 8,361 | $3.41 | $3.40 | $6.50 | $3.50 |
| 23 | Guardrail, type MGS with long posts (606E15100) | FT | 250 | $28.80 | $30.00 | $28.80 | $30.00 |
| 24 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,940.00 | $2,800.00 | $2,940.00 | $2,750.00 |
| 25 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,385.00 | $1,400.00 | $1,385.00 | $1,350.00 |
| 26 | 4" concrete walk (608E10000) | SF | 537 | $13.25 | $15.75 | $10.00 | $10.28 |
| 27 | Detectable warning (608E53020) | SF | 80 | $60.00 | $18.25 | $40.00 | $28.00 |
| 28 | Right-of-way monument, type B (623E40520) | EACH | 10 | $495.00 | $150.00 | $1,150.00 | $300.00 |
| 29 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,000.00 | $2,800.00 | $2,500.00 | $800.00 |
| 30 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,000.00 | $2,800.00 | $2,500.00 | $800.00 |
| 31 | Special - mailbox removed and reset (690E50350) | EACH | 6 | $230.00 | $375.00 | $200.00 | $450.00 |
| 32 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 42 | $130.00 | $163.00 | $120.00 | $100.00 |
| 33 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 52 | $180.00 | $300.00 | $140.00 | $165.00 |
| 34 | Bioretention cell (601E45050) | CY | 208 | $113.75 | $143.50 | $250.00 | $78.00 |
| 35 | Soil analysis test (659E00100) | EACH | 2 | $135.00 | $150.00 | $85.00 | $135.00 |
| 36 | Topsoil (659E00300) | CY | 639 | $45.00 | $60.00 | $35.00 | $55.00 |
| 37 | Seeding and mulching (659E10000) | SY | 5,912 | $0.99 | $1.00 | $1.45 | $1.50 |
| 38 | Repair seeding and mulching (659E14000) | SY | 288 | $0.80 | $1.00 | $2.25 | $0.80 |
| 39 | Inter-seeding (659E15000) | SY | 288 | $0.80 | $1.00 | $2.25 | $0.80 |
| 40 | Commercial fertilizer (659E20000) | TON | 0.78 | $939.01 | $1,250.00 | $750.00 | $950.00 |
| 41 | Lime (659E31000) | ACRE | 1.19 | $157.87 | $150.00 | $10.00 | $160.00 |
| 42 | Water (659E35000) | MGAL | 16 | $1.00 | $1.00 | $1.00 | $1.00 |
| 43 | Mowing (659E40000) | MSF | 13 | $28.00 | $100.00 | $26.00 | $28.00 |
| 44 | Erosion control mat (671E14000) | SY | 156 | $1.49 | $2.50 | $3.00 | $1.50 |
| 45 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,100.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 46 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $1,860.00 | $9,500.00 | $10,000 | $9,450.00 |
| 47 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,225.00 | $14,700 | $12,200 | $12,500 |
| 48 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | Concrete masonry (602E20000) | CY | 1.90 | $3,075.00 | $3,200.00 | $2,500.00 | $3,150.00 |
| 50 | 4" unclassified pipe underdrains, as per plan (605E05201) | FT | 163 | $21.00 | $20.00 | $10.00 | $22.00 |
| 51 | 6" unclassified pipe underdrains (605E13300) | FT | 406 | $24.75 | $15.00 | $18.00 | $28.00 |
| 52 | 6" base pipe underdrains (605E14000) | FT | 2,661 | $22.00 | $15.25 | $15.00 | $28.00 |
| 53 | 4" conduit, type F (611E00406) | FT | 42 | $47.00 | $17.75 | $16.00 | $20.00 |
| 54 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 163 | $68.25 | $28.50 | $16.00 | $25.00 |
| 55 | 12" conduit, type B (611E04400) | FT | 186 | $79.00 | $124.50 | $140.00 | $90.00 |
| 56 | 12" conduit, type D (611E04900) | FT | 36 | $61.25 | $156.50 | $105.00 | $90.00 |
| 57 | 18" conduit, type B (611E07400) | FT | 11 | $156.25 | $159.50 | $210.00 | $202.00 |
| 58 | 21" conduit, type B (611E08900) | FT | 185 | $110.25 | $172.50 | $235.00 | $120.00 |
| 59 | 21" conduit, type C (611E09100) | FT | 175 | $95.25 | $186.00 | $160.00 | $120.00 |
| 60 | 24" conduit, type B (611E10400) | FT | 18 | $129.50 | $175.00 | $200.00 | $165.00 |
| 61 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 5 | $250.00 | $30.00 | $20.00 | $30.00 |
| 62 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 5 | $250.00 | $30.00 | $14.00 | $30.00 |
| 63 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 5 | $250.00 | $30.00 | $14.00 | $30.00 |
| 64 | Catch basin, no. 3 (611E98150) | EACH | 1 | $3,850.00 | $6,400.00 | $4,800.00 | $4,950.00 |
| 65 | Catch basin, no. 6, as per plan (611E98371) | EACH | 7 | $3,000.00 | $4,500.00 | $4,250.00 | $3,750.00 |
| 66 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,550.00 | $3,500.00 | $2,500.00 | $3,300.00 |
| 67 | Precast reinforced concrete outlet (611E99710) | EACH | 3 | $425.00 | $300.00 | $250.00 | $600.00 |
| 68 | Full depth pavement sawing (252E01500) | FT | 401 | $4.90 | $7.60 | $3.00 | $2.75 |
| 69 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 627 | $183.00 | $204.00 | $193.00 | $193.00 |
| 70 | Aggregate base (304E20000) | CY | 1,811 | $75.00 | $85.00 | $85.00 | $102.00 |
| 71 | Non-tracking tack coat (407E20000) | GAL | 866 | $4.10 | $5.50 | $4.10 | $4.10 |
| 72 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 234 | $265.00 | $300.00 | $270.00 | $270.00 |
| 73 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 274 | $222.00 | $254.50 | $227.00 | $227.00 |
| 74 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 46 | $255.00 | $400.00 | $255.00 | $255.00 |
| 75 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 61 | $240.00 | $300.00 | $240.00 | $240.00 |
| 76 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 120 | $80.00 | $121.50 | $95.00 | $125.00 |
| 77 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 28 | $96.00 | $168.00 | $92.00 | $168.00 |
| 78 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 856 | $104.00 | $112.50 | $110.00 | $182.00 |
| 79 | Curb, type 6 (609E26000) | FT | 1,269 | $28.00 | $29.00 | $38.00 | $49.00 |
| 80 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 2,826 | $75.00 | $58.00 | $40.00 | $68.00 |
| 81 | Concrete median (609E72000) | SY | 462 | $80.00 | $82.00 | $72.00 | $114.00 |
| 82 | 12" water main polyvinyl chloride pipe and fittings, AWWA C900, DR-14 (638E02750) | FT | 222 | $435.00 | $250.00 | $435.00 | $225.00 |
| 83 | 12" gate valve and valve box (638E08100) | EACH | 3 | $4,750.00 | $4,700.00 | $4,750.00 | $7,200.00 |
| 84 | Fire hydrant removed (638E10480) | EACH | 1 | $750.00 | $500.00 | $750.00 | $2,500.00 |
| 85 | Water work, misc.: existing water main removed (638E98600) | FT | 187 | $20.00 | $15.00 | $20.00 | $55.00 |
| 86 | Connection, fused pull apart (625E00450) | EACH | 24 | $160.00 | $160.00 | $160.00 | $160.00 |
| 87 | Connection, unfused permanent (625E00480) | EACH | 24 | $150.00 | $150.00 | $150.00 | $150.00 |
| 88 | Light pole, conventional, AT15B30 (625E10490) | EACH | 12 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 89 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 12 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 90 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 915 | $4.75 | $4.80 | $4.75 | $4.75 |
| 91 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,620 | $2.00 | $2.00 | $2.00 | $2.00 |
| 92 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 1,041 | $21.50 | $21.50 | $21.50 | $21.50 |
| 93 | Conduit, 3", 725.04 (625E25500) | FT | 285 | $40.00 | $40.00 | $40.00 | $40.00 |
| 94 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 12 | $400.00 | $400.00 | $400.00 | $400.00 |
| 95 | Trench, 24" deep (625E29002) | FT | 1,186 | $5.00 | $5.00 | $5.00 | $5.00 |
| 96 | Pull box, 725.08, 24" (625E30706) | EACH | 8 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 97 | Ground rod (625E32000) | EACH | 13 | $160.00 | $160.00 | $160.00 | $160.00 |
| 98 | Power service, as per plan (625E34001) | EACH | 1 | $15,000 | $15,000 | $15,000 | $15,000 |
| 99 | Underground warning marking tape (625E36010) | FT | 1,186 | $2.00 | $2.00 | $2.00 | $2.00 |
| 100 | Temporary lighting (625E39000) | LS | 1 | $30,000 | $30,000 | $30,000 | $30,000 |
| 101 | Arc flash calculations and label, PS-A (625E76000) | EACH | 1 | $3,050.00 | $3,100.00 | $3,050.00 | $3,050.00 |
| 102 | RPM (621E00100) | EACH | 99 | $52.00 | $47.00 | $52.00 | $47.00 |
| 103 | Raised pavement marker removed (621E54000) | EACH | 9 | $24.00 | $5.00 | $15.00 | $35.00 |
| 104 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 7 | $12.00 | $12.50 | $12.00 | $12.50 |
| 105 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 408.60 | $15.00 | $18.50 | $16.60 | $18.32 |
| 106 | One way support, no. 4 post (630E08100) | FT | 166.40 | $30.00 | $22.50 | $18.10 | $22.46 |
| 107 | Sign, flat sheet (630E80100) | SF | 278.50 | $15.00 | $28.00 | $24.40 | $21.52 |
| 108 | Removal of ground mounted sign and disposal (630E84900) | EACH | 26 | $20.00 | $25.00 | $10.00 | $17.03 |
| 109 | Removal of ground mounted sign and reerection (630E85100) | EACH | 6 | $45.00 | $150.00 | $65.00 | $63.30 |
| 110 | Removal of ground mounted sign and delivery, as per plan (630E85201) | EACH | 4 | $45.00 | $100.00 | $50.00 | $42.56 |
| 111 | Removal of ground mounted post support and disposal (630E86002) | EACH | 24 | $25.00 | $25.00 | $20.00 | $22.70 |
| 112 | Signing, misc.:solar-powered rectangular rapid fla (630E97700) | EACH | 2 | $10,000 | $10,000 | $10,000 | $9,056.54 |
| 113 | Edge line, 6" (644E00104) | MI | 0.28 | $9,980.00 | $3,900.00 | $9,980.00 | $3,900.00 |
| 114 | Center line (644E00300) | MI | 0.30 | $11,980 | $5,400.00 | $11,980 | $5,400.00 |
| 115 | Crosswalk line, 24" (644E00630) | FT | 48 | $9.00 | $9.00 | $9.00 | $9.00 |
| 116 | Transverse/diagonal line (644E00700) | FT | 210 | $9.00 | $9.00 | $9.00 | $9.00 |
| 117 | Two way left turn arrow (644E01370) | EACH | 1 | $180.00 | $120.00 | $180.00 | $120.00 |
| 118 | Dotted line, 8" (644E01514) | FT | 162 | $3.50 | $2.00 | $3.50 | $2.00 |
| 119 | Yield line (644E20800) | FT | 71 | $12.50 | $12.00 | $12.50 | $12.00 |
| 120 | Geotextile fabric (204E50000) | SY | 608 | $3.01 | $3.00 | $5.76 | $3.00 |
| 121 | Riprap for tree protection, as per plan (657E10001) | SY | 304 | $32.35 | $30.00 | $120.00 | $32.35 |
| 122 | Deciduous shrub, 12" height (rhus aromatica, B&B 5 (661E19000) | EACH | 15 | $128.66 | $120.00 | $262.50 | $130.00 |
| 123 | Evergreen tree, 2' height(pinus mugo, B&B 8" (661E50040) | EACH | 5 | $208.70 | $205.00 | $262.50 | $210.00 |
| 124 | Landscape watering (662E31000) | GAL | 135 | $1.00 | $0.20 | $2.10 | $1.00 |
| 125 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 200 | $70.00 | $55.00 | $71.00 | $71.00 |
| 126 | Pavement repair, as per plan (253E01001) | SY | 200 | $154.00 | $150.00 | $155.00 | $155.00 |
| 127 | Traffic compacted surface, type A (410E10000) | CY | 50 | $110.00 | $50.00 | $80.00 | $110.00 |
| 128 | Traffic compacted surface, type B (410E11000) | CY | 50 | $110.00 | $50.00 | $80.00 | $110.00 |
| 129 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 50 | $360.00 | $250.00 | $366.00 | $366.00 |
| 130 | Detour signing (614E12420) | LS | 1 | $11,250 | $11,400 | $6,750.00 | $15,000 |
| 131 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $995.00 | $1,000.00 | $1,750.00 | $950.00 |
| 132 | Water (616E10000) | MGAL | 21 | $1.00 | $100.00 | $85.00 | $1.00 |
| 133 | Compacted aggregate (617E10100) | CY | 40 | $155.00 | $100.00 | $158.00 | $120.00 |
| 134 | Edge line, 4", type 1 (642E00100) | MI | 11 | $650.00 | $800.00 | $825.00 | $805.00 |
| 135 | Center line, type 1 (642E00300) | MI | 10.50 | $1,070.00 | $1,000.00 | $1,175.00 | $997.00 |
| 136 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,000.00 | $12,045 | $18,000 | $18,000 |
| 137 | Maintaining traffic (614E11000) | LS | 1 | $15,200 | $25,000 | $15,000 | $40,000 |
| 138 | Field office, type C (619E16020) | MNTH | 6 | $3,975.00 | $2,000.00 | $4,000.00 | $2,500.00 |
| 139 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $15,000 | $32,400 | $65,000 | $35,000 |
| 140 | Mobilization (624E10000) | LS | 1 | $35,500 | $100,000 | $100,000 | $70,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.