ODOT contract 260198 bid tabulation

FAI-SR 204-04.30 (INTERSECTION). Let by Ohio DOT on April 23, 2026, FAI. 4 bids received; low bid $2,144,982 by Shelly Company, -3.0% against the engineer's estimate of $2,212,000.

Owner
Ohio DOT
Letting
23 APR 2026
Pay items
140
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$2,144,982Low-3.0%
2Strawser Paving Co Inc$2,161,199+1.0%-2.0%
3Complete General Construction Company$2,261,519+5.0%+2.0%
4Axis Civil Construction LLC$2,392,135+12%+8.0%
ODOT contract 260198: bids by rank

Engineer's estimate: $2,212,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company2. Strawser Paving Co Inc3. Complete General Construction Company4. Axis Civil Construction LLC
1Clearing and grubbing (201E11000)LS1$12,500$17,500$31,500$25,000
2Headwall removed (202E20010)EACH2$375.00$600.00$400.00$600.00
3Pavement removed (202E23000)SY5,875$7.85$11.00$12.00$13.00
4Pipe removed, 24" and under (202E35100)FT172$52.00$26.00$24.00$15.00
5Guardrail removed (202E38000)FT328$2.00$5.00$2.00$8.00
6Anchor assembly removed, type E (202E42010)EACH2$145.00$250.00$145.00$800.00
7Mailbox removed (202E53100)EACH1$35.00$98.50$71.11$350.00
8Catch basin removed (202E58100)EACH2$735.00$289.00$450.00$1,000.00
9Valve box removed (202E75610)EACH4$365.00$400.00$175.00$400.00
10Removal misc.:in-ground lights (202E98100)EACH2$100.00$100.00$400.00$100.00
11Removal misc.:light pole (202E98100)EACH2$500.00$500.00$400.00$500.00
12Removal misc.:stone pillars with lights (202E98100)EACH2$300.00$800.00$600.00$300.00
13Excavation (203E10000)CY2,459$44.25$16.50$32.00$33.00
14Excavation, as per plan (203E10001)CY208$71.50$50.00$36.00$33.00
15Excavation, as per plan (203E10001)CY845$43.65$41.00$36.00$42.00
16Embankment (203E20000)CY2,360$31.00$19.86$7.00$28.00
17Embankment, as per plan (203E20001)CY845$31.65$14.00$13.00$46.00
18Subgrade compaction (204E10000)SY1,674$1.65$1.00$4.00$3.00
19Proof rolling (204E45000)HR5$270.00$196.50$250.00$1,000.00
20Cement (206E10500)TON216$221.55$221.50$221.55$225.00
21Curing coat (206E11000)SY8,361$1.29$1.30$1.29$1.30
22Cement stabilized subgrade, 12 inches deep (206E15010)SY8,361$3.41$3.40$6.50$3.50
23Guardrail, type MGS with long posts (606E15100)FT250$28.80$30.00$28.80$30.00
24Anchor assembly, MGS type E (606E26150)EACH1$2,940.00$2,800.00$2,940.00$2,750.00
25Anchor assembly, MGS type T (606E26550)EACH1$1,385.00$1,400.00$1,385.00$1,350.00
264" concrete walk (608E10000)SF537$13.25$15.75$10.00$10.28
27Detectable warning (608E53020)SF80$60.00$18.25$40.00$28.00
28Right-of-way monument, type B (623E40520)EACH10$495.00$150.00$1,150.00$300.00
29Preconstruction survey monument verification and report (623E50000)LS1$2,000.00$2,800.00$2,500.00$800.00
30Post construction survey monument verification and report (623E51000)LS1$2,000.00$2,800.00$2,500.00$800.00
31Special - mailbox removed and reset (690E50350)EACH6$230.00$375.00$200.00$450.00
32Tied concrete block mat with type 2 underlayment (601E21060)SY42$130.00$163.00$120.00$100.00
33Rock channel protection, type C with geotextile fabric (601E32204)CY52$180.00$300.00$140.00$165.00
34Bioretention cell (601E45050)CY208$113.75$143.50$250.00$78.00
35Soil analysis test (659E00100)EACH2$135.00$150.00$85.00$135.00
36Topsoil (659E00300)CY639$45.00$60.00$35.00$55.00
37Seeding and mulching (659E10000)SY5,912$0.99$1.00$1.45$1.50
38Repair seeding and mulching (659E14000)SY288$0.80$1.00$2.25$0.80
39Inter-seeding (659E15000)SY288$0.80$1.00$2.25$0.80
40Commercial fertilizer (659E20000)TON0.78$939.01$1,250.00$750.00$950.00
41Lime (659E31000)ACRE1.19$157.87$150.00$10.00$160.00
42Water (659E35000)MGAL16$1.00$1.00$1.00$1.00
43Mowing (659E40000)MSF13$28.00$100.00$26.00$28.00
44Erosion control mat (671E14000)SY156$1.49$2.50$3.00$1.50
45Storm water pollution prevention plan (832E15000)LS1$3,100.00$2,000.00$2,000.00$2,000.00
46Storm water pollution prevention inspections (832E15002)LS1$1,860.00$9,500.00$10,000$9,450.00
47Storm water pollution prevention inspection software (832E15010)LS1$8,225.00$14,700$12,200$12,500
48Erosion control (832E30000)EACH30,000$1.00$1.00$1.00$1.00
49Concrete masonry (602E20000)CY1.90$3,075.00$3,200.00$2,500.00$3,150.00
504" unclassified pipe underdrains, as per plan (605E05201)FT163$21.00$20.00$10.00$22.00
516" unclassified pipe underdrains (605E13300)FT406$24.75$15.00$18.00$28.00
526" base pipe underdrains (605E14000)FT2,661$22.00$15.25$15.00$28.00
534" conduit, type F (611E00406)FT42$47.00$17.75$16.00$20.00
546" conduit, type F for underdrain outlets (611E00510)FT163$68.25$28.50$16.00$25.00
5512" conduit, type B (611E04400)FT186$79.00$124.50$140.00$90.00
5612" conduit, type D (611E04900)FT36$61.25$156.50$105.00$90.00
5718" conduit, type B (611E07400)FT11$156.25$159.50$210.00$202.00
5821" conduit, type B (611E08900)FT185$110.25$172.50$235.00$120.00
5921" conduit, type C (611E09100)FT175$95.25$186.00$160.00$120.00
6024" conduit, type B (611E10400)FT18$129.50$175.00$200.00$165.00
61Conduit, misc.: type C for drainage discharge cont (611E97400)FT5$250.00$30.00$20.00$30.00
62Conduit, misc.: type E for drainage discharge cont (611E97400)FT5$250.00$30.00$14.00$30.00
63Conduit, misc.: type F for drainage discharge cont (611E97400)FT5$250.00$30.00$14.00$30.00
64Catch basin, no. 3 (611E98150)EACH1$3,850.00$6,400.00$4,800.00$4,950.00
65Catch basin, no. 6, as per plan (611E98371)EACH7$3,000.00$4,500.00$4,250.00$3,750.00
66Catch basin, no. 2-2B (611E98470)EACH2$2,550.00$3,500.00$2,500.00$3,300.00
67Precast reinforced concrete outlet (611E99710)EACH3$425.00$300.00$250.00$600.00
68Full depth pavement sawing (252E01500)FT401$4.90$7.60$3.00$2.75
69Asphalt concrete base, PG64-22, (449) (301E56000)CY627$183.00$204.00$193.00$193.00
70Aggregate base (304E20000)CY1,811$75.00$85.00$85.00$102.00
71Non-tracking tack coat (407E20000)GAL866$4.10$5.50$4.10$4.10
72Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY234$265.00$300.00$270.00$270.00
73Asphalt concrete intermediate course, type 2, (449) (441E70300)CY274$222.00$254.50$227.00$227.00
74Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY46$255.00$400.00$255.00$255.00
75Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700)CY61$240.00$300.00$240.00$240.00
766" non-reinforced concrete pavement, class QC 1P (452E10010)SY120$80.00$121.50$95.00$125.00
778" non-reinforced concrete pavement, class QC 1P (452E12010)SY28$96.00$168.00$92.00$168.00
789" non-reinforced concrete pavement, class QC 1P (452E13010)SY856$104.00$112.50$110.00$182.00
79Curb, type 6 (609E26000)FT1,269$28.00$29.00$38.00$49.00
80Combination curb and gutter, type 9, as per plan (609E31001)FT2,826$75.00$58.00$40.00$68.00
81Concrete median (609E72000)SY462$80.00$82.00$72.00$114.00
8212" water main polyvinyl chloride pipe and fittings, AWWA C900, DR-14 (638E02750)FT222$435.00$250.00$435.00$225.00
8312" gate valve and valve box (638E08100)EACH3$4,750.00$4,700.00$4,750.00$7,200.00
84Fire hydrant removed (638E10480)EACH1$750.00$500.00$750.00$2,500.00
85Water work, misc.: existing water main removed (638E98600)FT187$20.00$15.00$20.00$55.00
86Connection, fused pull apart (625E00450)EACH24$160.00$160.00$160.00$160.00
87Connection, unfused permanent (625E00480)EACH24$150.00$150.00$150.00$150.00
88Light pole, conventional, AT15B30 (625E10490)EACH12$3,000.00$3,000.00$3,000.00$3,000.00
89Light pole foundation, 24" X 8' deep (625E14100)EACH12$2,500.00$2,500.00$2,500.00$2,500.00
90No. 4 AWG 2400 volt distribution cable (625E23200)FT915$4.75$4.80$4.75$4.75
91No. 10 AWG pole and bracket cable (625E23400)FT1,620$2.00$2.00$2.00$2.00
921-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT1,041$21.50$21.50$21.50$21.50
93Conduit, 3", 725.04 (625E25500)FT285$40.00$40.00$40.00$40.00
94Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH12$400.00$400.00$400.00$400.00
95Trench, 24" deep (625E29002)FT1,186$5.00$5.00$5.00$5.00
96Pull box, 725.08, 24" (625E30706)EACH8$1,500.00$1,500.00$1,500.00$1,500.00
97Ground rod (625E32000)EACH13$160.00$160.00$160.00$160.00
98Power service, as per plan (625E34001)EACH1$15,000$15,000$15,000$15,000
99Underground warning marking tape (625E36010)FT1,186$2.00$2.00$2.00$2.00
100Temporary lighting (625E39000)LS1$30,000$30,000$30,000$30,000
101Arc flash calculations and label, PS-A (625E76000)EACH1$3,050.00$3,100.00$3,050.00$3,050.00
102RPM (621E00100)EACH99$52.00$47.00$52.00$47.00
103Raised pavement marker removed (621E54000)EACH9$24.00$5.00$15.00$35.00
104Barrier reflector, type 2, BI-directional (626E00110)EACH7$12.00$12.50$12.00$12.50
105Ground mounted support, no. 3 post, as per plan (630E03101)FT408.60$15.00$18.50$16.60$18.32
106One way support, no. 4 post (630E08100)FT166.40$30.00$22.50$18.10$22.46
107Sign, flat sheet (630E80100)SF278.50$15.00$28.00$24.40$21.52
108Removal of ground mounted sign and disposal (630E84900)EACH26$20.00$25.00$10.00$17.03
109Removal of ground mounted sign and reerection (630E85100)EACH6$45.00$150.00$65.00$63.30
110Removal of ground mounted sign and delivery, as per plan (630E85201)EACH4$45.00$100.00$50.00$42.56
111Removal of ground mounted post support and disposal (630E86002)EACH24$25.00$25.00$20.00$22.70
112Signing, misc.:solar-powered rectangular rapid fla (630E97700)EACH2$10,000$10,000$10,000$9,056.54
113Edge line, 6" (644E00104)MI0.28$9,980.00$3,900.00$9,980.00$3,900.00
114Center line (644E00300)MI0.30$11,980$5,400.00$11,980$5,400.00
115Crosswalk line, 24" (644E00630)FT48$9.00$9.00$9.00$9.00
116Transverse/diagonal line (644E00700)FT210$9.00$9.00$9.00$9.00
117Two way left turn arrow (644E01370)EACH1$180.00$120.00$180.00$120.00
118Dotted line, 8" (644E01514)FT162$3.50$2.00$3.50$2.00
119Yield line (644E20800)FT71$12.50$12.00$12.50$12.00
120Geotextile fabric (204E50000)SY608$3.01$3.00$5.76$3.00
121Riprap for tree protection, as per plan (657E10001)SY304$32.35$30.00$120.00$32.35
122Deciduous shrub, 12" height (rhus aromatica, B&B 5 (661E19000)EACH15$128.66$120.00$262.50$130.00
123Evergreen tree, 2' height(pinus mugo, B&B 8" (661E50040)EACH5$208.70$205.00$262.50$210.00
124Landscape watering (662E31000)GAL135$1.00$0.20$2.10$1.00
125Partial depth pavement repair (441), as per plan (251E01001)SY200$70.00$55.00$71.00$71.00
126Pavement repair, as per plan (253E01001)SY200$154.00$150.00$155.00$155.00
127Traffic compacted surface, type A (410E10000)CY50$110.00$50.00$80.00$110.00
128Traffic compacted surface, type B (410E11000)CY50$110.00$50.00$80.00$110.00
129Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY50$360.00$250.00$366.00$366.00
130Detour signing (614E12420)LS1$11,250$11,400$6,750.00$15,000
131Portable changeable message sign, as per plan (614E18601)SNMT12$995.00$1,000.00$1,750.00$950.00
132Water (616E10000)MGAL21$1.00$100.00$85.00$1.00
133Compacted aggregate (617E10100)CY40$155.00$100.00$158.00$120.00
134Edge line, 4", type 1 (642E00100)MI11$650.00$800.00$825.00$805.00
135Center line, type 1 (642E00300)MI10.50$1,070.00$1,000.00$1,175.00$997.00
136Premium for contract performance bond and for payment bond (103E05000)LS1$8,000.00$12,045$18,000$18,000
137Maintaining traffic (614E11000)LS1$15,200$25,000$15,000$40,000
138Field office, type C (619E16020)MNTH6$3,975.00$2,000.00$4,000.00$2,500.00
139Construction layout stakes and surveying, as per plan (623E10001)LS1$15,000$32,400$65,000$35,000
140Mobilization (624E10000)LS1$35,500$100,000$100,000$70,000
ODOT contract 260198: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy