ODOT contract 260211 bid tabulation
POR-US 224-00.00 (MAJOR RECONSTRUCTION). Let by Ohio DOT on April 23, 2026, POR. 5 bids received; low bid $10,954,739 by Shelly & Sands Inc, -27% against the engineer's estimate of $14,920,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 113
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $10,954,739 | Low | -27% |
| 2 | Shelly Company | $12,113,168 | +11% | -19% |
| 3 | Ronyak Paving Inc | $12,226,500 | +12% | -18% |
| 4 | Karvo Companies Inc | $12,515,506 | +14% | -16% |
| 5 | Kokosing Construction Company Inc | $14,103,575 | +29% | -5.0% |
Engineer's estimate: $14,920,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Shelly Company | 3. Ronyak Paving Inc | 4. Karvo Companies Inc | 5. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 193,120 | $1.00 | $1.95 | $4.00 | $5.97 | $2.80 |
| 2 | Removal misc.: barrier reflector (202E98100) | EACH | 313 | $5.00 | $5.00 | $5.00 | $5.00 | $12.25 |
| 3 | Excavation (203E10000) | CY | 230 | $80.00 | $40.00 | $65.00 | $25.00 | $65.00 |
| 4 | Linear grading (209E60200) | STA | 827 | $50.00 | $70.00 | $12.00 | $30.00 | $80.00 |
| 5 | Preparing subgrade for shoulder paving (209E72000) | STA | 962 | $30.00 | $88.00 | $10.00 | $25.00 | $9.00 |
| 6 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $2,500.00 | $2,500.00 | $1,750.00 | $2,500.00 | $2,500.00 |
| 7 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $10,000 | $4,000.00 | $5,000.00 | $3,500.00 |
| 8 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 9 | Partial depth pavement repair (441) (251E01000) | SY | 300 | $100.00 | $115.00 | $85.00 | $75.00 | $105.00 |
| 10 | Pavement planing, asphalt concrete (T = 1.25") (254E01000) | SY | 9,940 | $1.00 | $3.25 | $1.50 | $1.75 | $1.30 |
| 11 | Pavement planing, asphalt concrete (T = 1.50") (254E01000) | SY | 76,252 | $1.00 | $1.30 | $1.25 | $1.85 | $1.40 |
| 12 | Full depth pavement removal and rigid replacement, type 1, class QC1 (255E11000) | SY | 15,000 | $121.00 | $160.00 | $158.00 | $130.00 | $155.00 |
| 13 | Full depth pavement removal and rigid replacement, type 2, class QC1 (255E12000) | SY | 3,000 | $170.00 | $200.00 | $195.00 | $180.00 | $192.00 |
| 14 | Full depth pavement removal and rigid replacement, type 1, class QC RS (255E19000) | SY | 300 | $350.00 | $295.00 | $405.00 | $230.00 | $400.00 |
| 15 | Full depth pavement sawing (255E20000) | FT | 82,350 | $2.65 | $2.50 | $2.00 | $3.00 | $2.51 |
| 16 | Aggregate base (304E20000) | CY | 230 | $100.00 | $60.00 | $70.00 | $25.00 | $70.00 |
| 17 | Tack coat, 702.13 (407E13900) | GAL | 15,451 | $3.00 | $4.85 | $4.00 | $2.50 | $3.40 |
| 18 | Non-tracking tack coat (407E20000) | GAL | 19,336 | $3.05 | $3.00 | $2.50 | $2.50 | $2.50 |
| 19 | Prime coat, as per plan (408E10001) | GAL | 13,256 | $3.50 | $4.85 | $3.00 | $5.50 | $4.00 |
| 20 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 10,400 | $225.00 | $190.00 | $225.00 | $215.00 | $270.00 |
| 21 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 18,776 | $163.00 | $135.00 | $175.00 | $160.00 | $218.00 |
| 22 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 5 | $1,000.00 | $595.00 | $555.00 | $500.00 | $640.00 |
| 23 | Compacted aggregate (617E10100) | CY | 1,556 | $75.00 | $95.00 | $90.00 | $85.00 | $40.00 |
| 24 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 26.90 | $695.00 | $695.00 | $695.00 | $540.00 | $695.00 |
| 25 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 12.80 | $695.00 | $695.00 | $695.00 | $540.00 | $695.00 |
| 26 | Longitudinal joint preparation (874E20000) | FT | 66,635 | $0.40 | $1.25 | $1.25 | $1.00 | $1.35 |
| 27 | RPM (621E00100) | EACH | 1,235 | $35.00 | $35.00 | $39.00 | $39.00 | $35.00 |
| 28 | Raised pavement marker removed (621E54000) | EACH | 996 | $5.00 | $8.00 | $1.00 | $1.00 | $3.00 |
| 29 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 18 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 30 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 373 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 31 | Ground mounted support, no. 2 post (630E02100) | FT | 192 | $14.25 | $14.25 | $14.25 | $14.25 | $14.25 |
| 32 | Sign, flat sheet (630E80100) | SF | 36 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 33 | Sign, flat sheet (630E80100) | SF | 14 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 34 | Removal of ground mounted sign and disposal (630E84900) | EACH | 24 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 35 | Removal of ground mounted post support and disposal (630E86002) | EACH | 24 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 36 | Edge line, 6" (646E10010) | MI | 27.02 | $3,050.00 | $3,050.00 | $3,050.00 | $3,050.00 | $3,050.00 |
| 37 | Center line (646E10200) | MI | 13.51 | $2,755.00 | $2,755.00 | $2,755.00 | $2,755.00 | $2,755.00 |
| 38 | Channelizing line, 8" (646E10300) | FT | 6,414 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 |
| 39 | Stop line (646E10400) | FT | 460 | $10.75 | $10.75 | $10.75 | $10.75 | $10.75 |
| 40 | Transverse/diagonal line (646E10600) | FT | 410 | $6.75 | $6.75 | $6.75 | $6.75 | $6.75 |
| 41 | Lane arrow (646E20300) | EACH | 82 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 |
| 42 | Advance radar detection (809E69000) | EACH | 2 | $10,350 | $10,350 | $10,350 | $10,350 | $10,350 |
| 43 | Stop line radar detection (809E69100) | EACH | 8 | $10,050 | $10,050 | $10,050 | $10,050 | $10,050 |
| 44 | Traffic compacted surface, type A or B (410E12000) | CY | 30 | $200.00 | $110.00 | $80.00 | $50.00 | $100.00 |
| 45 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 300 | $95.00 | $100.00 | $125.00 | $125.00 | $120.00 |
| 46 | Detour signing (614E12420) | LS | 1 | $62,500 | $62,500 | $65,000 | $62,500 | $96,000 |
| 47 | Work zone marking sign (614E12460) | EACH | 18 | $85.00 | $85.00 | $85.00 | $85.00 | $58.00 |
| 48 | Asphalt concrete for maintaining traffic (614E13000) | CY | 30 | $500.00 | $125.00 | $350.00 | $300.00 | $125.00 |
| 49 | Portable changeable message sign, as per plan (614E18601) | SNMT | 48 | $875.00 | $875.00 | $875.00 | $875.00 | $900.00 |
| 50 | Work zone center line, class I (614E21000) | MI | 22.68 | $995.00 | $900.00 | $995.00 | $995.00 | $995.00 |
| 51 | Work zone center line, class III, 642 paint (614E21550) | MI | 13.51 | $885.00 | $900.00 | $885.00 | $885.00 | $885.00 |
| 52 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 27.02 | $635.00 | $450.00 | $635.00 | $635.00 | $635.00 |
| 53 | Work zone channelizing line, class I, 8" (614E23000) | FT | 12,164 | $0.57 | $0.75 | $0.57 | $0.57 | $0.57 |
| 54 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 7,574 | $0.52 | $0.75 | $0.52 | $0.52 | $0.52 |
| 55 | Work zone stop line, class I (614E26000) | FT | 734 | $3.10 | $3.00 | $3.10 | $3.10 | $3.10 |
| 56 | Work zone stop line, class III, 642 paint (614E26610) | FT | 460 | $2.95 | $3.00 | $2.95 | $2.95 | $2.95 |
| 57 | Railroad flagging services (900E00100) | EACH | 81,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 58 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $2,064.00 | $2,064.00 | $3,000.00 |
| 59 | Wearing course removed (202E23500) | SY | 173 | $10.00 | $10.00 | $60.00 | $5.00 | $35.00 |
| 60 | Tack coat, 702.13 (407E13900) | GAL | 14 | $3.00 | $5.00 | $30.00 | $2.50 | $3.40 |
| 61 | Non-tracking tack coat (407E20000) | GAL | 11 | $3.05 | $3.00 | $30.00 | $2.50 | $2.50 |
| 62 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 6 | $450.00 | $335.00 | $800.00 | $325.00 | $272.00 |
| 63 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 6 | $440.00 | $940.00 | $800.00 | $300.00 | $218.00 |
| 64 | Concrete, misc.: backwall repair (511E71100) | CY | 2 | $3,000.00 | $3,000.00 | $9,387.00 | $9,387.00 | $3,000.00 |
| 65 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 99 | $45.00 | $45.00 | $42.00 | $42.00 | $45.00 |
| 66 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 509 | $15.00 | $15.00 | $9.67 | $9.67 | $15.00 |
| 67 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 74 | $45.00 | $45.00 | $23.66 | $23.66 | $45.00 |
| 68 | Removal of existing pavement marking (512E74500) | FT | 444 | $5.00 | $5.00 | $1.94 | $1.94 | $5.00 |
| 69 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 62 | $1,800.00 | $1,800.00 | $1,861.03 | $1,861.03 | $1,800.00 |
| 70 | Refurbish bearing device, as per plan (516E45305) | EACH | 10 | $1,000.00 | $1,000.00 | $2,337.00 | $2,337.00 | $1,000.00 |
| 71 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $30,000 | $30,000 | $30,120 | $30,120 | $30,000 |
| 72 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 10 | $1,200.00 | $1,200.00 | $779.70 | $779.70 | $1,200.00 |
| 73 | Patching concrete structure, as per plan (519E11101) | SF | 135 | $185.00 | $185.00 | $152.55 | $152.55 | $185.00 |
| 74 | Special - structures: spall removal with zinc rich (530E00800) | SY | 10 | $1,500.00 | $1,500.00 | $565.20 | $565.20 | $1,500.00 |
| 75 | Patching concrete structures with trowelable mortar (843E50000) | SF | 85 | $185.00 | $185.00 | $152.55 | $152.55 | $185.00 |
| 76 | Galvanic anode protection (844E20000) | EACH | 56 | $96.00 | $96.00 | $103.05 | $103.05 | $96.00 |
| 77 | Special - fill and plug existing conduit (202E70000) | FT | 90 | $1,135.00 | $1,135.00 | $677.80 | $677.80 | $1,135.00 |
| 78 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $1,290.00 | $3,000.00 |
| 79 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 2 | $500.00 | $500.00 | $42.00 | $42.00 | $500.00 |
| 80 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 748 | $15.00 | $15.00 | $9.67 | $9.67 | $15.00 |
| 81 | Removal of existing pavement marking (512E74500) | FT | 465 | $5.00 | $5.00 | $1.94 | $1.94 | $5.00 |
| 82 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 5 | $1,750.00 | $1,750.00 | $779.70 | $779.70 | $1,750.00 |
| 83 | Patching concrete structure, as per plan (519E11101) | SF | 10 | $385.00 | $385.00 | $152.55 | $152.55 | $385.00 |
| 84 | Aggregate drains, as per plan (605E31101) | FT | 44 | $50.00 | $50.00 | $22.53 | $22.53 | $50.00 |
| 85 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $2,064.00 | $2,064.00 | $3,000.00 |
| 86 | Wearing course removed (202E23500) | SY | 239 | $10.00 | $5.10 | $60.00 | $5.00 | $35.00 |
| 87 | Tack coat, 702.13 (407E13900) | GAL | 20 | $3.00 | $5.00 | $30.00 | $2.50 | $3.40 |
| 88 | Non-tracking tack coat (407E20000) | GAL | 15 | $3.05 | $3.00 | $30.00 | $2.50 | $2.50 |
| 89 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 9 | $450.00 | $275.00 | $800.00 | $325.00 | $272.00 |
| 90 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 9 | $440.00 | $660.00 | $800.00 | $300.00 | $218.00 |
| 91 | Concrete, misc.: backwall repair (511E71100) | CY | 3 | $3,000.00 | $3,000.00 | $9,387.00 | $9,387.00 | $3,000.00 |
| 92 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 151 | $45.00 | $45.00 | $42.00 | $42.00 | $45.00 |
| 93 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 831 | $15.00 | $15.00 | $9.67 | $9.67 | $15.00 |
| 94 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 126 | $45.00 | $45.00 | $23.66 | $23.66 | $45.00 |
| 95 | Removal of existing pavement marking (512E74500) | FT | 522 | $5.00 | $5.00 | $1.94 | $1.94 | $5.00 |
| 96 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 86 | $1,800.00 | $1,800.00 | $1,693.00 | $1,693.00 | $1,800.00 |
| 97 | Refurbish bearing device, as per plan (516E45305) | EACH | 12 | $2,250.00 | $1,000.00 | $2,299.50 | $2,299.51 | $1,000.00 |
| 98 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $18,500 | $18,500 | $30,120 | $30,120 | $18,500 |
| 99 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 10 | $1,200.00 | $1,200.00 | $779.70 | $779.70 | $1,200.00 |
| 100 | Patching concrete structure, as per plan (519E11101) | SF | 225 | $185.00 | $185.00 | $152.55 | $152.55 | $185.00 |
| 101 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,032.00 | $1,032.00 | $3,000.00 |
| 102 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,032.00 | $1,032.00 | $3,000.00 |
| 103 | Special - pile encasement (507E71200) | FT | 175 | $520.00 | $520.00 | $424.65 | $424.65 | $520.00 |
| 104 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 14 | $45.00 | $45.00 | $42.00 | $42.00 | $45.00 |
| 105 | Patching concrete structure, as per plan (519E11101) | SF | 125 | $185.00 | $185.00 | $152.55 | $152.55 | $185.00 |
| 106 | Aggregate drains, as per plan (605E31101) | FT | 44 | $50.00 | $50.00 | $22.53 | $22.53 | $50.00 |
| 107 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,000.00 | $1,290.00 | $1,290.00 | $3,000.00 |
| 108 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $6,620.00 | $8,000.00 | $5,000.00 | $15,000 | $10,000 |
| 109 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $50,000 | $59,710 | $100,000 | $56,500 |
| 110 | Maintaining traffic (614E11000) | LS | 1 | $186,088 | $1,182,250 | $180,000 | $300,000 | $557,704 |
| 111 | Field office, type B (619E16010) | MNTH | 12 | $4,000.00 | $4,000.00 | $1,500.00 | $4,000.00 | $3,200.00 |
| 112 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,000.00 | $20,000 | $10,390 | $15,000 | $3,000.00 |
| 113 | Mobilization (624E10000) | LS | 1 | $425,000 | $400,000 | $316,564 | $849,000 | $705,175 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.