ODOT contract 260203 bid tabulation
HUR-AC&Y Trail Phase II (BIKEWAYS). Let by Ohio DOT on April 23, 2026, HUR. 3 bids received; low bid $1,583,058 by Mark Haynes Construction Inc, -11% against the engineer's estimate of $1,783,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 71
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mark Haynes Construction Inc | $1,583,058 | Low | -11% |
| 2 | Buckeye Excavating & Construction Inc | $1,911,054 | +21% | +7.0% |
| 3 | Marks Construction Inc | $2,067,615 | +31% | +16% |
Engineer's estimate: $1,783,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mark Haynes Construction Inc | 2. Buckeye Excavating & Construction Inc | 3. Marks Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $9,600.00 | $20,000 | $40,000 |
| 2 | Walk removed (202E30000) | SF | 90 | $16.00 | $2.00 | $10.00 |
| 3 | Curb and gutter removed (202E32500) | FT | 89 | $14.00 | $7.00 | $20.00 |
| 4 | Guardrail removed for reuse (202E38200) | FT | 62.50 | $4.50 | $17.00 | $10.00 |
| 5 | Special - pipe cleanout, 24" and under (202E70110) | FT | 100 | $4.50 | $10.00 | $35.00 |
| 6 | Excavation (203E10000) | CY | 3,705 | $13.75 | $30.00 | $16.00 |
| 7 | Embankment (203E20000) | CY | 2,952 | $21.75 | $32.00 | $12.00 |
| 8 | Roadway, misc.: surface compaction (203E98100) | SY | 28,571 | $0.60 | $1.00 | $2.00 |
| 9 | Roadway, misc.: trailhead kiosk (203E98600) | EACH | 1 | $3,750.00 | $23,300 | $10,000 |
| 10 | Subgrade compaction (204E10000) | SY | 25,450 | $0.60 | $1.00 | $2.00 |
| 11 | Excavation of subgrade (204E13000) | CY | 200 | $27.00 | $24.00 | $20.00 |
| 12 | Granular embankment (204E21000) | CY | 200 | $56.50 | $70.00 | $90.00 |
| 13 | Geotextile fabric (204E50000) | SY | 200 | $4.00 | $5.00 | $4.00 |
| 14 | Ditch cleanout, as per plan (209E10001) | FT | 1,000 | $16.00 | $6.00 | $12.00 |
| 15 | Linear grading, as per plan (209E60501) | MI | 6.96 | $8,280.00 | $12,700 | $10,000 |
| 16 | Guardrail rebuilt, as per plan (606E16001) | FT | 62.50 | $56.50 | $45.20 | $54.24 |
| 17 | Fence, misc.: bikeway rail (607E98000) | FT | 530 | $64.40 | $51.50 | $57.50 |
| 18 | 4" concrete walk (608E10000) | SF | 2,295 | $17.00 | $15.00 | $8.00 |
| 19 | Curb ramp, as per plan (608E52001) | SF | 4,781 | $17.00 | $16.00 | $17.00 |
| 20 | Water (616E10000) | MGAL | 27 | $3.00 | $60.00 | $50.00 |
| 21 | Special - concrete parking block (690E50500) | EACH | 8 | $170.00 | $200.00 | $300.00 |
| 22 | Soil analysis test (659E00100) | EACH | 2 | $125.00 | $150.00 | $250.00 |
| 23 | Topsoil (659E00300) | CY | 4,559 | $18.00 | $50.00 | $58.00 |
| 24 | Seeding and mulching (659E10000) | SY | 41,068 | $1.15 | $1.60 | $1.50 |
| 25 | Repair seeding and mulching (659E14000) | SY | 2,054 | $1.15 | $5.00 | $1.50 |
| 26 | Commercial fertilizer (659E20000) | TON | 5.54 | $1,062.50 | $500.00 | $1,100.00 |
| 27 | Lime (659E31000) | ACRE | 8.49 | $43.75 | $300.00 | $209.00 |
| 28 | Water (659E35000) | MGAL | 222 | $1.25 | $60.00 | $105.00 |
| 29 | Slope erosion protection (670E00500) | SY | 8,678 | $2.25 | $2.50 | $4.10 |
| 30 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,625.00 | $1,775.00 | $2,062.50 |
| 31 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $3,125.00 | $13,125 | $8,250.00 |
| 32 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $7,000.00 | $10,375 | $11,412 |
| 33 | Erosion control (832E30000) | EACH | 25,000 | $1.00 | $1.00 | $1.00 |
| 34 | Concrete masonry (602E20000) | CY | 0.94 | $1,250.00 | $5,000.00 | $3,000.00 |
| 35 | 8" conduit, type E (611E02500) | FT | 50 | $68.50 | $35.00 | $69.00 |
| 36 | 12" conduit, type A (611E04200) | FT | 100 | $71.00 | $80.00 | $75.76 |
| 37 | 12" conduit, type E (611E05100) | FT | 100 | $71.00 | $50.00 | $70.00 |
| 38 | 15" conduit, type C (611E06100) | FT | 100 | $70.00 | $55.00 | $75.76 |
| 39 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 108 | $250.00 | $377.00 | $295.90 |
| 40 | Aggregate base (304E20000) | CY | 6,100 | $74.00 | $70.00 | $88.85 |
| 41 | Tack coat (407E10000) | GAL | 77 | $3.00 | $2.00 | $2.50 |
| 42 | Prime coat (408E10000) | GAL | 254 | $8.00 | $3.00 | $3.35 |
| 43 | Stabilized crushed aggregate, as per plan (411E10001) | CY | 1,947 | $93.00 | $78.00 | $90.00 |
| 44 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 23 | $475.00 | $513.00 | $438.90 |
| 45 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 31 | $406.25 | $434.00 | $356.45 |
| 46 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 77 | $67.00 | $67.00 | $50.00 |
| 47 | Ground mounted support, no. 3 post (630E03100) | FT | 1,216.50 | $17.50 | $17.00 | $15.40 |
| 48 | Ground mounted support, no. 4 post (630E04100) | FT | 72.70 | $20.00 | $21.00 | $17.60 |
| 49 | Sign post reflector (630E08600) | EACH | 27 | $68.75 | $59.00 | $60.60 |
| 50 | Sign, flat sheet (630E80100) | SF | 712.60 | $22.50 | $18.00 | $19.79 |
| 51 | Removal of ground mounted sign and disposal (630E84900) | EACH | 95 | $54.50 | $17.00 | $27.50 |
| 52 | Removal of ground mounted sign and reerection (630E85100) | EACH | 11 | $219.50 | $65.00 | $104.50 |
| 53 | Removal of ground mounted post support and disposal (630E86002) | EACH | 61 | $73.80 | $23.00 | $33.00 |
| 54 | Signing, misc.: bicycle pedestrian sign (630E97700) | EACH | 3 | $3,333.75 | $350.00 | $2,933.70 |
| 55 | Signing, misc.: solar-powered rectangular rapid FL (630E97700) | EACH | 2 | $14,375 | $12,000 | $12,075 |
| 56 | Signing, misc.: solar-powered rectangular rapid FL (630E97700) | EACH | 2 | $21,406 | $13,000 | $17,981 |
| 57 | Stop line, type 1 (642E00500) | FT | 47 | $6.25 | $7.00 | $5.50 |
| 58 | Crosswalk line, 18", type 1, as per plan (enhanced (642E00627) | FT | 1,095 | $12.50 | $17.00 | $11.00 |
| 59 | Crosswalk line, 18", type 1, as per plan (yielded (642E00627) | FT | 229 | $12.50 | $19.00 | $11.00 |
| 60 | Chevron marking, type 1 (642E00720) | FT | 46 | $3.75 | $14.00 | $3.60 |
| 61 | Parking lot stall marking, type 1 (642E01200) | FT | 189 | $6.25 | $1.50 | $5.50 |
| 62 | Word on pavement, 96", type 1 (642E01410) | EACH | 14 | $118.75 | $100.00 | $104.50 |
| 63 | Bike lane symbol marking, type 1 (642E01602) | EACH | 14 | $118.75 | $50.00 | $104.50 |
| 64 | Handicap symbol marking, type 1 (642E01702) | EACH | 2 | $193.75 | $110.00 | $372.00 |
| 65 | Yield line, type 1 (642E20802) | FT | 48 | $7.50 | $7.00 | $51.00 |
| 66 | Stop line (644E00500) | FT | 72 | $68.75 | $9.00 | $60.50 |
| 67 | Special - bollard (690E50600) | EACH | 44 | $184.00 | $72.00 | $137.50 |
| 68 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,298 | $16,000 | $55,000 |
| 69 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $20,000 | $10,000 |
| 70 | Construction layout stakes and surveying (623E10000) | LS | 1 | $34,375 | $28,000 | $29,700 |
| 71 | Mobilization (624E10000) | LS | 1 | $25,000 | $90,000 | $82,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.