ODOT contract 260319 bid tabulation

FRA-VAR DMS & QWS-FY2026 (SIGNALIZATION). Let by Ohio DOT on June 25, 2026, FRA. 3 bids received; low bid $2,357,443 by Ruhlin Company, +16% against the engineer's estimate of $2,035,000.

Owner
Ohio DOT
Letting
25 JUN 2026
Pay items
100
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ruhlin Company$2,357,443Low+16%
2Complete General Construction Company$2,400,967+2.0%+18%
3Perram Electric Inc$3,197,800+36%+57%
ODOT contract 260319: bids by rank

Engineer's estimate: $2,035,000.

Bid tabulation

LinePay itemUnitQuantity1. Ruhlin Company2. Complete General Construction Company3. Perram Electric Inc
1Clearing and grubbing (201E11000)LS1$25,500$13,500$6,360.00
2Pavement removed (202E23000)SY24$225.00$42.00$36.05
3Anchor assembly removed, type E (202E42010)EACH2$195.00$195.00$350.00
4Anchor assembly removed, type T (202E42040)EACH1$110.00$110.00$150.00
5Fence removed (202E75000)FT24$12.50$12.50$35.00
6Excavation, as per plan (203E10001)CY619$69.00$38.91$175.00
7Embankment, as per plan (203E20001)CY426$30.00$55.88$190.00
8Subgrade compaction (204E10000)SY2,324$7.50$4.86$11.50
9Guardrail, type MGS (606E15050)FT1,362.50$22.40$22.40$22.50
10Guardrail, type MGS, long-span (606E17360)FT37.50$31.20$31.20$28.50
11Anchor assembly, MGS type E (606E26150)EACH4$2,520.00$2,520.00$2,700.00
12Anchor assembly, MGS type T (606E26550)EACH5$1,380.00$1,380.00$1,250.00
13Thrie beam bullnose terminal (MASH) (606E70010)EACH1$13,250$13,250$15,750
14Thrie beam guardrail (606E71000)FT14$165.00$165.00$70.00
15Fence, type CLT (607E23000)FT8$195.00$195.00$115.00
16Gate, type CLT (607E61200)EACH1$1,840.00$1,840.00$5,000.00
17Soil analysis test (659E00100)EACH2$200.00$500.00$620.00
18Topsoil (659E00300)CY113$230.00$60.00$280.00
19Seeding and mulching (659E10000)SY1,015$5.40$5.40$2.00
20Commercial fertilizer (659E20000)TON0.14$950.00$950.00$1,500.00
21Lime (659E31000)ACRE0.21$100.00$100.00$1,000.00
22Water (659E35000)MGAL5$1.00$1.00$50.00
23Erosion control (832E30000)EACH10,000$1.00$1.00$1.00
24Full depth pavement sawing (252E01500)FT67$6.00$7.00$10.15
25Aggregate base (304E20000)CY518$162.00$167.00$215.00
26Structural steel members, level UF (513E10000)LS1$138,700$108,000$142,300
27No. 1/0 AWG 2400 volt distribution cable (625E22900)FT2,590$11.80$12.00$13.62
28No. 6 AWG 600 volt distribution cable (625E22990)FT7,100$4.60$3.00$3.77
29No. 4 AWG 600 volt distribution cable (625E23000)FT16,880$5.20$4.00$4.46
30No. 2 AWG 600 volt distribution cable (625E23100)FT1,890$7.00$5.00$6.51
31Conduit, 2", 725.04, as per plan (625E25401)FT580$63.00$65.00$184.40
32Conduit, 3", 725.052 (625E25506)FT879$14.89$17.00$10.07
33Conduit, jacked or drilled, 725.04, 4" (625E25902)FT596$105.00$95.00$124.05
34Conduit cleaned and cables removed, as per plan (625E25911)FT1,124$1.00$1.00$1.15
35Trench, 30" deep (625E29010)FT6,484$17.00$12.00$21.63
36Pull box, 725.08, 18" (625E30700)EACH25$1,625.00$1,500.00$2,000.00
37Ground rod (625E32000)EACH20$375.00$350.00$335.00
38Structure grounding system (625E33000)EACH1$7,850.00$17,000$8,930.00
39Underground warning marking tape (625E36010)FT6,114$2.50$1.85$1.93
40Power service removed (625E75510)EACH3$1,108.00$600.00$470.00
41Arc flash calculations and label, ITS cabinet (625E76000)EACH7$1,400.00$3,600.00$2,000.00
42Arc flash calculations and label, power service (625E76000)EACH5$1,400.00$3,600.00$2,000.00
43Lighting, misc.: power service, ITS & lighting, 48 (625E98000)EACH1$10,961$33,000$38,610
44Ground mounted support, no. 3 post (630E03100)FT12.50$20.00$20.00$21.85
45Ground mounted support, no. 4 post (630E04100)FT31$25.00$25.00$43.10
46Ground mounted structural beam support, W10X22 (630E07500)FT239.80$70.00$70.00$110.55
47Ground mounted structural beam support, W10X12 (630E07600)FT31.60$50.00$50.00$131.65
48Ground mounted structural beam support, W12X30 (630E08000)FT66$85.00$85.00$105.25
49Breakaway structural beam connection (630E09000)EACH14$950.00$940.00$1,046.00
50Sign attachment assembly (630E75000)EACH14$395.00$395.00$820.00
51Sign, flat sheet (630E80100)SF43.75$20.00$20.00$32.25
52Sign, ground mounted extrusheet (630E80200)SF202$29.00$29.50$45.95
53Ground mounted structural beam support foundation (630E84500)EACH14$1,335.00$1,335.00$1,363.00
54Removal of ground mounted sign and disposal (630E84900)EACH1$25.00$25.00$210.00
55Removal of ground mounted post support and disposal (630E86002)EACH2$30.00$30.00$210.00
56Removal of ground mounted structural beam support (630E86102)EACH4$275.00$275.00$472.50
57Removal of structure mounted sign and disposal (630E86310)EACH3$550.00$550.00$420.00
58Removal of structure mounted sign and reerection, as per plan (630E86321)EACH1$133.00$1,330.00$5,250.00
59Power cable, 3 conductor, no. 6 AWG (632E68300)FT50$12.00$7.00$8.00
60Service cable, 3 conductor, no. 4 AWG (632E69900)FT140$14.50$10.00$9.30
61Conduit riser, 2" diameter (632E70400)EACH11$1,720.00$1,800.00$720.00
62Reuse of traffic control item: communications pull (632E90104)EACH9$770.00$1,000.00$445.00
63Reuse of traffic control item: electric pullbox (632E90104)EACH6$770.00$700.00$445.00
64Cabinet foundation, as per plan (633E67101)EACH7$2,256.00$3,650.00$4,815.00
65Controller work pad (633E67200)EACH7$4,340.00$5,400.00$7,736.00
66Fiber optic cable, 24 fiber (804E15010)FT10,850$5.40$2.75$4.65
67Fiber optic cable, 72 fiber (804E15030)FT1,970$6.50$3.50$5.46
68Fiber termination panel, 24 fiber (804E34022)EACH6$3,514.00$2,305.00$2,915.00
69Fiber termination panel, 72 fiber (804E34042)EACH1$3,614.00$3,885.00$7,270.00
70ITS pull box with pad and standard lid assembly, 3 (809E01900)EACH8$4,050.00$4,245.00$7,000.00
71ITS pull box with pad and hinged lid assembly, 32" wide, type 1 (809E01920)EACH8$5,033.00$5,450.00$8,300.00
72Tracer wire (809E10000)FT8,330$2.00$1.25$1.83
73Conduit, 2" diameter, HDPE (809E23900)FT5,664$9.00$9.00$7.50
74Conduit, multicell, jacked or drilled, 4", multice (809E24000)FT433$95.00$59.00$107.95
75Conduit, 4", multicell, HDPE with 4 - 1" innerducts (809E24500)FT3,728$10.50$24.00$30.50
76Conduit, multicell, misc.: conduit, 4", multicell, (809E25000)FT580$90.00$145.50$283.40
77ITS power service, ground mounted, 120/240V, 100 amp (809E51100)EACH1$7,329.00$13,300$8,070.00
78ITS power service, ground mounted, 240/480V, 100 amp (809E52100)EACH1$7,593.00$14,400$14,660
79ITS power service, pole mounted, 240/480V, 100 amp (809E56100)EACH1$4,500.00$10,500$9,255.00
80CCTV IP-camera system, fixed-view (809E60060)EACH9$6,190.00$4,700.00$4,070.00
81CCTV pole, 50' tall (809E61020)EACH1$21,900$52,000$46,650
82Dynamic message sign (DMS), front-access (809E63010)EACH5$88,700$74,500$70,265
83Ethernet cable, outdoor-rated (809E64550)FT1,180$4.00$3.00$3.60
84ITS cabinet - ground mounted (809E65000)EACH2$9,158.00$11,150$9,310.00
85ITS cabinet - DMS (809E65040)EACH5$8,840.00$12,100$10,220
86Step-down transformer, 3KVA (809E65100)EACH1$7,102.00$15,750$16,335
87Step-down transformer, 7.5KVA (809E65110)EACH3$11,065$17,900$18,535
88ITS device, misc.: ITS power service, pole mounted (809E65990)EACH1$4,915.00$11,000$8,775.00
89ITS device, misc.: maintenance of existing power S (809E65990)EACH1$7,215.00$8,600.00$10,700
90ITS device, misc.: removal of existing ITS cabinet (809E65990)EACH1$770.00$2,100.00$420.00
91Maintaining ITS during construction (809E70000)LS1$7,495.00$16,230$2,430.00
92As-built construction plans (809E70050)LS1$750.00$7,600.00$14,900
93Law enforcement officer with patrol car for assistance (614E11110)HR160$112.00$110.00$100.00
94Barrier reflector, type 2, one way (614E13312)EACH34$12.00$32.00$135.00
95Water (616E10000)MGAL50$40.00$150.00$1.00
96Premium for contract performance bond and for payment bond (103E05000)LS1$11,145$11,200$50,420
97Maintaining traffic (614E11000)LS1$42,050$98,000$213,896
98Construction layout stakes and surveying (623E10000)LS1$5,960.00$15,500$45,000
99Mobilization (624E10000)LS1$117,872$120,000$159,000
100Junction box, as per plan (625E29901)EACH6$7,180.00$5,100.00$6,880.00
ODOT contract 260319: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy