ODOT contract 260250 bid tabulation
TUS-Port Washington Sidewalks (SIDEWALK). Let by Ohio DOT on May 7, 2026, TUS. 3 bids received; low bid $921,933 by Ruhlin Company, +7.3% against the engineer's estimate of $859,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 49
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ruhlin Company | $921,933 | Low | +7.0% |
| 2 | Shelly Company | $996,820 | +8.0% | +16% |
| 3 | Shelly & Sands Inc | $1,085,305 | +18% | +26% |
Engineer's estimate: $859,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ruhlin Company | 2. Shelly Company | 3. Shelly & Sands Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $22,500 | $50,000 | $24,340 |
| 2 | Pavement removed (202E23000) | SY | 1,235 | $28.00 | $33.00 | $21.00 |
| 3 | Walk removed (202E30000) | SF | 30,809 | $2.40 | $5.50 | $2.20 |
| 4 | Walk removed, as per plan (202E30001) | SF | 212 | $3.00 | $5.00 | $20.50 |
| 5 | Curb removed (202E32000) | FT | 7 | $25.00 | $29.00 | $63.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 40 | $55.00 | $20.00 | $28.00 |
| 7 | Catch basin removed (202E58100) | EACH | 1 | $1,000.00 | $870.00 | $558.00 |
| 8 | Inlet removed, as per plan (202E58201) | EACH | 8 | $230.00 | $700.00 | $222.50 |
| 9 | Removal misc.: rock (202E98100) | EACH | 3 | $68.00 | $500.00 | $279.00 |
| 12 | Subgrade compaction (204E10000) | SY | 1,311 | $7.00 | $2.80 | $10.00 |
| 13 | 4" concrete walk (608E10000) | SF | 36,673 | $9.10 | $5.50 | $8.40 |
| 14 | 4" concrete walk, as per plan (608E10001) | SF | 167 | $13.50 | $6.40 | $41.50 |
| 15 | Curb ramp (608E52000) | SF | 4,110 | $13.00 | $17.50 | $41.50 |
| 16 | Detectable warning (608E53020) | SF | 8 | $100.00 | $30.00 | $55.00 |
| 17 | Special - mailbox removed and reset (690E50350) | EACH | 4 | $250.00 | $200.00 | $400.00 |
| 18 | Topsoil (659E00300) | CY | 353 | $88.00 | $88.00 | $166.50 |
| 19 | Seeding and mulching, class 1 (659E00500) | SY | 3,180 | $1.50 | $1.50 | $2.00 |
| 20 | Repair seeding and mulching (659E14000) | SY | 159 | $4.00 | $4.00 | $2.25 |
| 21 | Inter-seeding (659E15000) | SY | 159 | $0.60 | $1.00 | $2.25 |
| 22 | Commercial fertilizer (659E20000) | TON | 0.43 | $1,500.00 | $1,500.00 | $964.00 |
| 23 | Lime (659E31000) | ACRE | 0.66 | $135.00 | $1.00 | $171.00 |
| 24 | Water (659E35000) | MGAL | 18 | $5.00 | $1.00 | $1.00 |
| 25 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 |
| 26 | 12" conduit, type B (611E04400) | FT | 44 | $105.00 | $180.00 | $125.00 |
| 27 | 12" conduit, type C (611E04600) | FT | 30 | $138.00 | $175.00 | $104.00 |
| 28 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $3,250.00 | $2,800.00 | $2,900.00 |
| 29 | Manhole adjusted to grade (611E99654) | EACH | 1 | $850.00 | $950.00 | $1,150.00 |
| 30 | Manhole, misc.:, handformed shallow manhole (611E99690) | EACH | 1 | $6,000.00 | $3,000.00 | $3,700.00 |
| 31 | Pavement repair, as per plan (253E01001) | SY | 25 | $445.00 | $280.00 | $300.00 |
| 32 | Aggregate base (304E20000) | CY | 24 | $180.00 | $160.00 | $165.00 |
| 33 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 917 | $81.00 | $75.00 | $100.00 |
| 34 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 393 | $90.00 | $120.00 | $122.00 |
| 35 | Ground rod (625E32000) | EACH | 4 | $350.00 | $165.00 | $324.50 |
| 36 | Ground mounted support, no. 2 post (630E02100) | FT | 51 | $15.00 | $15.00 | $16.25 |
| 37 | Street name sign support, no. 2 post (630E08510) | FT | 13 | $20.00 | $20.00 | $21.75 |
| 38 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $75.00 | $75.00 | $81.00 |
| 39 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $35.00 | $35.00 | $38.00 |
| 40 | Signing, misc.:solar powered rectangular rapid fla (630E97700) | EACH | 4 | $8,500.00 | $8,000.00 | $9,570.00 |
| 41 | Pedestal foundation (632E64020) | EACH | 4 | $1,200.00 | $1,000.00 | $1,620.00 |
| 42 | Removal of pavement marking, as per plan (642E30001) | FT | 740 | $4.00 | $4.00 | $4.25 |
| 43 | Crosswalk line, 12" (644E00620) | FT | 1,744 | $6.00 | $6.00 | $6.50 |
| 44 | Yield line (644E20800) | FT | 49 | $20.00 | $20.00 | $21.75 |
| 45 | Water (616E10000) | MGAL | 5 | $10.00 | $50.00 | $115.00 |
| 46 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,500.00 | $5,000.00 | $5,850.00 |
| 47 | Maintaining traffic (614E11000) | LS | 1 | $56,000 | $125,000 | $55,707 |
| 48 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $90.00 | $100.00 | $119.00 |
| 49 | Field office, type A (619E16000) | MNTH | 3 | $2,700.00 | $3,500.00 | $4,815.00 |
| 50 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,250 | $10,000 | $8,430.00 |
| 51 | Mobilization (624E10000) | LS | 1 | $46,000 | $40,000 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.