ODOT contract 260148 bid tabulation
FRA-IR 270-32.92 at Easton Way (INTERCHANGE). Let by Ohio DOT on March 26, 2026, FRA. 3 bids received; low bid $5,189,580 by Complete General Construction Company, +4.5% against the engineer's estimate of $4,968,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 236
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $5,189,580 | Low | +4.0% |
| 2 | Shelly & Sands Inc | $5,505,688 | +6.0% | +11% |
| 3 | Ruhlin Company | $6,198,478 | +19% | +25% |
Engineer's estimate: $4,968,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Shelly & Sands Inc | 3. Ruhlin Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $20,000 | $44,500 | $44,000 |
| 2 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $1,880.00 | $2,200.00 | $4,000.00 |
| 3 | Headwall removed (202E20010) | EACH | 6 | $650.00 | $900.00 | $400.00 |
| 4 | Pavement removed (202E23000) | SY | 7,694 | $27.00 | $25.00 | $33.00 |
| 5 | Concrete median removed (202E30600) | SY | 5 | $60.00 | $125.00 | $108.00 |
| 6 | Concrete barrier removed (202E30700) | FT | 77 | $75.00 | $75.00 | $155.00 |
| 7 | Curb removed (202E32000) | FT | 981 | $8.00 | $7.00 | $2.50 |
| 8 | Pipe removed, 24" and under (202E35100) | FT | 57 | $80.00 | $30.00 | $36.00 |
| 9 | Guardrail removed (202E38000) | FT | 1,035 | $2.00 | $2.80 | $2.00 |
| 10 | Catch basin removed (202E58100) | EACH | 3 | $480.00 | $600.00 | $613.00 |
| 11 | Removal misc.: precast reinforced concrete outlet (202E98100) | EACH | 4 | $180.00 | $150.00 | $300.00 |
| 12 | Excavation (203E10000) | CY | 5,988 | $26.00 | $30.00 | $21.00 |
| 13 | Embankment (203E20000) | CY | 6,897 | $17.00 | $28.00 | $38.00 |
| 14 | Subgrade compaction (204E10000) | SY | 13,853 | $2.70 | $5.00 | $1.60 |
| 15 | Excavation of subgrade (204E13000) | CY | 1,469 | $35.00 | $60.00 | $54.00 |
| 16 | Granular material, type C (204E30020) | CY | 1,469 | $66.00 | $78.00 | $102.00 |
| 17 | Proof rolling (204E45000) | HR | 8 | $360.00 | $300.00 | $305.00 |
| 18 | Geotextile fabric (204E50000) | SY | 4,407 | $2.20 | $2.50 | $1.35 |
| 19 | Guardrail, type MGS (606E15050) | FT | 901 | $21.00 | $21.00 | $39.00 |
| 20 | Guardrail, type MGS with long posts (606E15100) | FT | 388 | $27.00 | $27.00 | $45.00 |
| 21 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,525.00 | $2,600.00 | $3,650.00 |
| 22 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,350.00 | $1,250.00 | $2,150.00 |
| 23 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,680.00 | $2,600.00 | $3,150.00 |
| 24 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $585.00 | $550.00 | $850.00 |
| 25 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 1 | $9,550.00 | $8,000.00 | $9,575.00 |
| 26 | Concrete barrier, single slope, type D (622E10160) | FT | 124 | $150.00 | $225.00 | $200.00 |
| 27 | Barrier transition (622E10200) | EACH | 1 | $5,400.00 | $4,800.00 | $5,800.00 |
| 28 | Concrete barrier end section, type D (622E25000) | EACH | 1 | $6,300.00 | $5,500.00 | $5,600.00 |
| 29 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $4,770.00 | $5,000.00 | $7,200.00 |
| 30 | Barrier, misc.: concrete barrier, SCD MC-9.3 (622E90000) | FT | 20 | $285.00 | $390.00 | $510.00 |
| 31 | Barrier, misc.: concrete barrier transition, SCD M (622E90200) | EACH | 1 | $15,000 | $15,000 | $16,500 |
| 32 | Special - tree barricade, as per plan (690E98400) | LS | 1 | $8,500.00 | $23,000 | $42,000 |
| 33 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $33,500 | $47,000 | $76,500 |
| 34 | Riprap, type D (601E11000) | SY | 23 | $400.00 | $450.00 | $430.00 |
| 35 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 12 | $135.00 | $155.00 | $198.00 |
| 36 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 63 | $98.00 | $80.00 | $68.00 |
| 37 | Rock channel protection, type B with filter (601E32100) | CY | 534 | $120.00 | $130.00 | $152.00 |
| 38 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $135.00 | $150.00 |
| 39 | Topsoil (659E00300) | CY | 1,605 | $30.00 | $23.00 | $60.00 |
| 40 | Seeding and mulching (659E10000) | SY | 14,460 | $0.75 | $0.65 | $0.75 |
| 41 | Repair seeding and mulching (659E14000) | SY | 723 | $0.75 | $0.80 | $0.75 |
| 42 | Inter-seeding (659E15000) | SY | 723 | $0.75 | $0.80 | $0.75 |
| 43 | Commercial fertilizer (659E20000) | TON | 3.25 | $1,250.00 | $740.00 | $1,250.00 |
| 44 | Lime (659E31000) | ACRE | 2.99 | $150.00 | $158.00 | $150.00 |
| 45 | Water (659E35000) | MGAL | 82 | $1.00 | $1.00 | $1.00 |
| 46 | Mowing (659E40000) | MSF | 33 | $50.00 | $50.00 | $50.00 |
| 47 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,000.00 | $3,500.00 | $3,000.00 |
| 48 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $12,000 | $19,000 | $16,000 |
| 49 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $13,400 | $13,386 | $13,385 |
| 50 | Erosion control (832E30000) | EACH | 49,271 | $1.00 | $1.00 | $1.00 |
| 51 | Concrete masonry (602E20000) | CY | 11.80 | $2,150.00 | $3,800.00 | $3,800.00 |
| 52 | 6" unclassified pipe underdrains (605E13300) | FT | 6,159 | $19.00 | $23.00 | $28.00 |
| 53 | 6" base pipe underdrains (605E14000) | FT | 5,164 | $13.00 | $18.00 | $24.50 |
| 54 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 436 | $22.00 | $28.00 | $56.00 |
| 55 | 12" conduit, type B (611E04400) | FT | 71 | $145.00 | $140.00 | $200.00 |
| 56 | 12" conduit, type C (611E04600) | FT | 81 | $120.00 | $160.00 | $100.00 |
| 57 | 15" conduit, type B (611E05900) | FT | 115 | $145.00 | $170.00 | $135.00 |
| 58 | 15" conduit, type F (611E06700) | FT | 55 | $155.00 | $130.00 | $160.00 |
| 59 | 24" conduit, type A (611E10200) | FT | 8 | $430.00 | $525.00 | $395.00 |
| 60 | 42" conduit, type B (611E19400) | FT | 8 | $590.00 | $815.00 | $625.00 |
| 61 | 48" conduit, type C (611E21100) | FT | 8 | $680.00 | $900.00 | $790.00 |
| 62 | Catch basin, no. 3 (611E98150) | EACH | 1 | $5,700.00 | $5,800.00 | $7,010.00 |
| 63 | Catch basin, no. 3A (611E98180) | EACH | 3 | $4,150.00 | $4,700.00 | $6,580.00 |
| 64 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $1,780.00 | $1,650.00 | $2,270.00 |
| 65 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 1 | $3,030.00 | $3,500.00 | $2,940.00 |
| 66 | Inlet, no. 2-A-6 (611E98840) | EACH | 1 | $6,100.00 | $6,700.00 | $6,650.00 |
| 67 | Manhole frame and cover (611E99650) | EACH | 1 | $500.00 | $425.00 | $1,201.31 |
| 68 | Manhole adjusted to grade (611E99654) | EACH | 7 | $1,260.00 | $1,350.00 | $2,000.00 |
| 69 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $5,900.00 | $8,000.00 | $6,450.00 |
| 70 | Precast reinforced concrete outlet (611E99710) | EACH | 7 | $375.00 | $415.00 | $475.00 |
| 71 | Ditch erosion protection (670E00700) | SY | 346 | $2.50 | $1.50 | $2.50 |
| 72 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 23,483 | $6.35 | $4.00 | $6.35 |
| 73 | Pavement planing, asphalt concrete, 3.25" (254E01000) | SY | 1,516 | $14.25 | $5.00 | $14.25 |
| 74 | Diamond grinding portland cement concrete pavement (257E10000) | SY | 3,075 | $9.20 | $17.00 | $5.95 |
| 75 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 2,099 | $208.00 | $180.00 | $208.00 |
| 76 | Aggregate base (304E20000) | CY | 2,824 | $86.00 | $88.00 | $127.00 |
| 77 | Non-tracking tack coat (407E20000) | GAL | 3,170 | $4.20 | $3.50 | $4.20 |
| 78 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 1,408 | $321.00 | $265.00 | $321.00 |
| 79 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 499 | $291.00 | $240.00 | $291.00 |
| 80 | 12" non-reinforced concrete pavement, class QC 1P (452E15010) | SY | 4,553 | $118.00 | $142.00 | $119.00 |
| 81 | Treating of concrete bridge deck with SRS (512E10400) | SY | 3,075 | $11.00 | $10.50 | $10.50 |
| 82 | Curb, type 4-C (609E24510) | FT | 88 | $52.00 | $65.00 | $75.00 |
| 83 | Curb, type 6 (609E26000) | FT | 738 | $26.00 | $30.00 | $40.00 |
| 84 | Curb, type 6, as per plan (609E26001) | FT | 175 | $36.00 | $38.00 | $73.00 |
| 85 | Concrete median (609E72000) | SY | 4 | $280.00 | $270.00 | $400.00 |
| 86 | Connection, fused pull apart (625E00450) | EACH | 6 | $120.00 | $120.00 | $194.33 |
| 87 | Connection, unfused permanent (625E00480) | EACH | 2 | $115.00 | $115.00 | $194.33 |
| 88 | Light pole, misc.:relocate existing light pole (625E10500) | EACH | 1 | $850.00 | $850.00 | $361.25 |
| 89 | Light pole foundation, 24" X 8' deep, as per plan (625E14101) | EACH | 1 | $3,000.00 | $3,000.00 | $2,052.37 |
| 90 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 820 | $3.00 | $3.00 | $3.46 |
| 91 | 1-1/2" duct cable with two no. 2 AWG 2400 volt cables (625E24300) | FT | 373 | $16.00 | $16.00 | $20.25 |
| 92 | Conduit, 3", 725.04 (625E25500) | FT | 389 | $35.00 | $30.00 | $38.54 |
| 93 | Trench (625E29000) | FT | 752 | $9.00 | $9.00 | $8.72 |
| 94 | Pull box, 725.06, size 4 (625E30510) | EACH | 2 | $1,000.00 | $1,000.00 | $1,363.37 |
| 95 | Pull box removed, as per plan (625E31511) | EACH | 1 | $240.00 | $240.00 | $560.32 |
| 96 | Ground rod (625E32000) | EACH | 1 | $325.00 | $325.00 | $235.30 |
| 97 | Underground warning marking tape (625E36010) | FT | 752 | $1.00 | $1.00 | $2.44 |
| 98 | Special - maintain existing lighting (625E40000) | LS | 1 | $18,000 | $15,000 | $3,115.60 |
| 99 | Light pole foundation removed (625E75500) | EACH | 1 | $500.00 | $500.00 | $406.29 |
| 100 | Light tower foundation removed (625E75540) | EACH | 1 | $1,100.00 | $1,100.00 | $812.57 |
| 101 | Distribution cable removed, as per plan (625E75551) | FT | 390 | $0.60 | $0.60 | $0.53 |
| 102 | RPM (621E00100) | EACH | 323 | $42.00 | $50.00 | $42.85 |
| 103 | Raised pavement marker removed, as per plan (621E54001) | EACH | 207 | $20.00 | $10.00 | $15.00 |
| 104 | Ground rod (625E32000) | EACH | 4 | $325.00 | $450.00 | $105.62 |
| 105 | Barrier reflector, type 1, 1 way (626E00102) | EACH | 6 | $11.00 | $12.50 | $13.00 |
| 106 | Barrier reflector, type 2, 1 way (626E00110) | EACH | 22 | $13.50 | $12.50 | $13.00 |
| 107 | Ground mounted support, no. 3 post (630E03100) | FT | 98 | $19.00 | $15.00 | $15.00 |
| 108 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 84 | $35.00 | $25.00 | $25.00 |
| 109 | Ground mounted support, pipe (630E08210) | FT | 17.90 | $30.00 | $25.00 | $25.00 |
| 110 | Triangular slip base connection (630E09050) | EACH | 1 | $495.00 | $400.00 | $400.00 |
| 111 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 1 | $63,200 | $62,000 | $62,000 |
| 112 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 1 | $94,750 | $92,000 | $92,000 |
| 113 | Sign support assembly, pole mounted (630E79500) | EACH | 3 | $240.00 | $150.00 | $150.00 |
| 114 | Sign, flat sheet (630E80100) | SF | 81.25 | $20.00 | $25.00 | $25.00 |
| 115 | Sign, flat sheet, as per plan (630E80101) | SF | 42 | $35.00 | $65.00 | $65.00 |
| 116 | Sign, ground mounted extrusheet (630E80200) | SF | 28 | $24.00 | $32.00 | $32.00 |
| 117 | Sign, overhead extrusheet (630E80224) | SF | 564 | $25.00 | $28.00 | $28.00 |
| 118 | Concrete barrier median overhead sign support foundation, type TC-21.40 (630E84000) | EACH | 1 | $19,094 | $10,500 | $10,500 |
| 119 | Rigid overhead sign support foundation (630E84510) | EACH | 3 | $10,525 | $10,500 | $10,500 |
| 120 | Ground mounted pipe support foundation (630E84600) | EACH | 1 | $725.00 | $750.00 | $750.00 |
| 121 | Removal of ground mounted sign and disposal (630E84900) | EACH | 9 | $15.00 | $20.00 | $20.00 |
| 122 | Removal of ground mounted post support and disposal (630E86002) | EACH | 11 | $20.00 | $20.00 | $20.00 |
| 123 | Removal of ground mounted pipe support and disposal (630E86272) | EACH | 1 | $115.00 | $400.00 | $400.00 |
| 124 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 4 | $275.00 | $400.00 | $400.00 |
| 125 | Removal of pole mounted sign and disposal (630E87500) | EACH | 1 | $35.00 | $20.00 | $20.00 |
| 126 | Removal of overhead sign support and disposal, type TC-15.115 (630E89804) | EACH | 1 | $2,950.00 | $2,500.00 | $2,500.00 |
| 127 | Edge line, 6" (644E00104) | MI | 0.63 | $3,500.00 | $3,500.00 | $3,500.00 |
| 128 | Lane line, 6" (644E00204) | MI | 0.84 | $1,600.00 | $1,600.00 | $1,600.00 |
| 129 | Center line (644E00300) | MI | 0.17 | $5,000.00 | $5,000.00 | $5,000.00 |
| 130 | Channelizing line, 12" (644E00404) | FT | 2,985 | $2.00 | $2.00 | $2.00 |
| 131 | Stop line (644E00500) | FT | 114 | $7.00 | $7.00 | $7.00 |
| 132 | Transverse/diagonal line (644E00700) | FT | 180 | $7.00 | $7.00 | $7.00 |
| 133 | Chevron marking (644E00720) | FT | 32 | $7.00 | $7.00 | $7.00 |
| 134 | Lane arrow (644E01300) | EACH | 26 | $115.00 | $115.00 | $115.00 |
| 135 | Dotted line, 6" (644E01510) | FT | 1,712 | $1.30 | $1.30 | $1.30 |
| 136 | Removal of pavement marking (644E30020) | EACH | 4 | $50.00 | $50.00 | $50.00 |
| 137 | Stop line, type A1 (645E00500) | FT | 24 | $10.00 | $10.00 | $10.00 |
| 138 | Removal of pavement markings (645E30000) | FT | 2,056 | $0.50 | $0.50 | $0.50 |
| 139 | Removal of pavement markings (645E30010) | EACH | 6 | $40.00 | $40.00 | $40.00 |
| 140 | Pavement marking, misc.center line, solid, double, (645E90000) | MI | 0.06 | $48,000 | $48,000 | $48,000 |
| 141 | Pavement marking, misc.edge line, white, grooved, (645E90000) | MI | 0.13 | $24,000 | $24,000 | $24,000 |
| 142 | Pavement marking, misc.lane line, grooved, with CO (645E90000) | MI | 0.13 | $9,500.00 | $9,500.00 | $9,500.00 |
| 143 | Pavement marking, misc.channelizing line, grooved, (645E98000) | FT | 450 | $10.00 | $10.00 | $10.00 |
| 144 | Stop line (646E10400) | FT | 36 | $10.00 | $10.00 | $10.00 |
| 145 | Pavement marking, misc.:lane arrow, type B90, with (647E50100) | EACH | 8 | $240.00 | $240.00 | $240.00 |
| 146 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 0.80 | $4,500.00 | $4,500.00 | $4,500.00 |
| 147 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 0.47 | $1,850.00 | $1,850.00 | $1,850.00 |
| 148 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 1,341 | $2.50 | $2.50 | $2.50 |
| 149 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 809 | $1.00 | $1.00 | $1.00 |
| 150 | Wet reflective spray thermoplastic pavement marking, edge line, 6" (807E13010) | MI | 0.90 | $2,900.00 | $2,900.00 | $2,900.00 |
| 151 | Wet reflective spray thermoplastic pavement marking, lane line, 6" (807E13110) | MI | 0.90 | $1,450.00 | $1,450.00 | $1,450.00 |
| 152 | Wet reflective spray thermoplastic pavement marking, channelizing line, 12" (807E13310) | FT | 1,486 | $1.65 | $1.65 | $1.65 |
| 153 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 1.81 | $1,300.00 | $1,300.00 | $1,300.00 |
| 154 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 1,345 | $0.40 | $0.40 | $0.40 |
| 155 | Grooving for 6" recessed pavement marking, (concrete) (850E20010) | MI | 1.25 | $2,500.00 | $2,500.00 | $2,500.00 |
| 156 | Grooving for 12" recessed pavement marking, (concrete) (850E20130) | FT | 1,486 | $1.00 | $1.00 | $1.00 |
| 157 | No. 4 AWG 600 volt distribution cable, as per plan (625E23001) | FT | 1,981 | $4.00 | $4.00 | $4.24 |
| 158 | Conduit, 1-1/2", 725.051 (625E25304) | FT | 169 | $9.00 | $9.00 | $5.42 |
| 159 | Conduit, 2", 725.051 (625E25408) | FT | 358 | $9.00 | $9.00 | $6.16 |
| 160 | Conduit, 3", 725.051 (625E25504) | FT | 18 | $11.50 | $11.50 | $10.43 |
| 161 | Conduit, concrete encased 2" (625E25802) | FT | 786 | $29.00 | $25.00 | $26.39 |
| 162 | Conduit, concrete encased 3" (625E25802) | FT | 338 | $30.00 | $30.00 | $30.98 |
| 163 | Conduit, misc.:1.5", bored, (epec-80-HDPE) (625E25920) | FT | 139 | $18.00 | $18.00 | $44.11 |
| 164 | Conduit, misc.:3", bored, (epec-80-HDPE) (625E25920) | FT | 278 | $20.00 | $20.00 | $47.50 |
| 165 | Trench (625E29000) | FT | 1,035 | $9.00 | $9.00 | $8.72 |
| 166 | Pull box removed, as per plan (625E31511) | EACH | 7 | $240.00 | $240.00 | $933.86 |
| 167 | Pull box, misc.: 725.06, (12"X18") (625E31600) | EACH | 6 | $825.00 | $825.00 | $773.70 |
| 168 | Pull box, misc.:725.08, 27" (625E31600) | EACH | 2 | $2,550.00 | $2,550.00 | $2,596.97 |
| 169 | Pull box, misc.:725.08, 32" (625E31600) | EACH | 2 | $2,950.00 | $2,950.00 | $3,679.67 |
| 170 | Ground rod (625E32000) | EACH | 5 | $325.00 | $325.00 | $281.69 |
| 171 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 1 | $685.00 | $650.00 | $524.46 |
| 172 | Sign, flat sheet, as per plan (630E80101) | SF | 9 | $36.00 | $45.00 | $58.33 |
| 173 | Signing, misc.:traffic signal signs (630E97700) | EACH | 1 | $500.00 | $7,500.00 | $1,166.67 |
| 174 | Vehicular signal head, optically programmed, 3-section, 12" lens, 1-way, as per plan (632E03201) | EACH | 4 | $5,900.00 | $5,000.00 | $8,117.33 |
| 175 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 2 | $1,200.00 | $1,200.00 | $1,831.38 |
| 176 | Covering of vehicular signal head (632E25000) | EACH | 6 | $40.00 | $40.00 | $78.19 |
| 177 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 831 | $3.25 | $3.25 | $4.12 |
| 178 | Signal support foundation (632E64010) | EACH | 1 | $11,250 | $11,250 | $5,758.78 |
| 179 | Pedestal foundation (632E64020) | EACH | 1 | $1,600.00 | $1,600.00 | $1,048.00 |
| 180 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 39 | $7.50 | $7.50 | $6.93 |
| 181 | Power cable, misc.:2 conductor, 1 / 0 AWG (632E69350) | FT | 1,047 | $11.00 | $11.00 | $13.96 |
| 182 | Power cable, misc.:3 conductor, 1 / 0 AWG (632E69350) | FT | 54 | $16.00 | $16.00 | $24.34 |
| 183 | Power cable, misc.:remove existing power cables (632E69350) | FT | 3,000 | $0.60 | $0.60 | $0.74 |
| 184 | Power service, as per plan (632E70001) | EACH | 2 | $850.00 | $850.00 | $763.70 |
| 185 | Signal support, misc.:signal support, (4120), desi (632E80700) | EACH | 1 | $33,000 | $30,000 | $31,834 |
| 186 | Pedestal, misc.:21' transformer base (632E90010) | EACH | 1 | $4,500.00 | $4,500.00 | $5,067.19 |
| 187 | Signalization, misc.:dilemma zone radar detection (632E90400) | EACH | 1 | $19,000 | $19,000 | $24,312 |
| 188 | Signalization, misc.:power meter cabinet (type I O (632E90400) | EACH | 1 | $6,600.00 | $6,600.00 | $5,929.04 |
| 189 | Signalization, misc.:stop line radar detection sys (632E90400) | EACH | 1 | $9,350.00 | $9,350.00 | $12,233 |
| 190 | Signalization, misc.:vehicular signal head, reloca (632E90400) | EACH | 2 | $295.00 | $295.00 | $364.97 |
| 191 | Cabinet foundation (633E67100) | EACH | 1 | $3,500.00 | $3,500.00 | $1,853.50 |
| 192 | Controller work pad (633E67200) | EACH | 1 | $1,325.00 | $1,325.00 | $686.88 |
| 193 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $9,740.00 | $9,740.00 | $12,415 |
| 194 | Controller item, misc.:controller modification (633E99000) | EACH | 1 | $1,000.00 | $1,000.00 | $757.15 |
| 195 | Controller item, misc.:controller unit TS2/A2, W/P (633E99000) | EACH | 1 | $28,000 | $28,000 | $34,238 |
| 196 | Controller item, misc.:fiber optic ethernet transc (633E99000) | EACH | 2 | $1,650.00 | $1,650.00 | $2,397.39 |
| 197 | Controller item, misc.:layer 2 ethernet switch (633E99000) | EACH | 1 | $3,300.00 | $3,300.00 | $5,828.52 |
| 198 | Fiber optic cable, misc.:fiber optic cable fusion (804E98100) | EACH | 24 | $27.00 | $27.00 | $27.00 |
| 199 | Fiber optic cable, misc.:reuse of existing fiber O (804E98100) | EACH | 1 | $1,250.00 | $1,250.00 | $1,250.00 |
| 200 | Fiber optic cable, misc.:termination panel, 24 fib (804E98100) | EACH | 1 | $2,500.00 | $2,505.65 | $2,927.46 |
| 201 | Maintaining ITS during construction (809E70000) | LS | 1 | $3,275.00 | $3,275.00 | $5,000.00 |
| 202 | Impact attenuator, type 2 (unidirectional), 65 MPH (606E60022) | EACH | 1 | $9,875.00 | $14,926 | $43,750 |
| 203 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 250 | $125.00 | $104.00 | $120.00 |
| 204 | Increased barrier delineation (614E11630) | FT | 1,600 | $1.75 | $0.75 | $1.92 |
| 205 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 7 | $2,380.00 | $2,100.00 | $2,073.83 |
| 206 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 530 | $40.00 | $42.00 | $26.68 |
| 207 | Barrier reflector, type 1, one way (614E13310) | EACH | 170 | $6.50 | $10.00 | $9.38 |
| 208 | Object marker, one way (614E13350) | EACH | 170 | $18.75 | $16.00 | $20.52 |
| 209 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $650.00 | $1,093.03 |
| 210 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 1.31 | $1,050.00 | $610.00 | $1,050.00 |
| 211 | Work zone lane line, class I, 6", 740.06, type I (614E20210) | MI | 0.14 | $6,805.00 | $6,685.00 | $6,804.43 |
| 212 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.81 | $995.00 | $525.00 | $995.00 |
| 213 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.04 | $1,221.00 | $2,300.00 | $1,221.00 |
| 214 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.16 | $1,170.00 | $1,530.00 | $1,170.00 |
| 215 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 3.96 | $910.00 | $1,335.00 | $910.00 |
| 216 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.45 | $12,817 | $12,150 | $12,817 |
| 217 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 2.01 | $900.00 | $990.00 | $900.00 |
| 218 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 5,085 | $0.50 | $0.80 | $0.50 |
| 219 | Work zone channelizing line, class I, 8", 740.06, type I (614E23400) | FT | 2,110 | $2.90 | $2.60 | $2.91 |
| 220 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 4,638 | $0.50 | $0.65 | $0.50 |
| 221 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 1,077 | $0.30 | $0.45 | $0.30 |
| 222 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 1,712 | $0.30 | $0.40 | $0.30 |
| 223 | Work zone stop line, class III, 642 paint (614E26610) | FT | 24 | $8.00 | $2.90 | $8.00 |
| 224 | Work zone arrow, class I (614E30000) | EACH | 2 | $100.00 | $135.00 | $100.00 |
| 225 | Roads for maintaining traffic (615E10000) | LS | 1 | $40,000 | $61,000 | $45,000 |
| 226 | Pavement for maintaining traffic, class A (615E20000) | SY | 870 | $70.00 | $75.00 | $115.00 |
| 227 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 124 | $165.00 | $63.00 | $139.00 |
| 228 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 185 | $290.00 | $125.00 | $290.00 |
| 229 | Water (616E10000) | MGAL | 12 | $98.00 | $90.00 | $36.00 |
| 230 | Dual portable barrier transition/termination (622E41060) | EACH | 1 | $4,300.00 | $14,926 | $4,457.13 |
| 231 | Portable barrier, unanchored (622E41100) | FT | 7,660 | $21.00 | $23.00 | $24.31 |
| 232 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $32,371 | $70,000 |
| 233 | Maintaining traffic (614E11000) | LS | 1 | $178,700 | $247,500 | $235,300 |
| 234 | Field office, type B (619E16010) | MNTH | 12 | $2,500.00 | $4,050.00 | $3,800.00 |
| 235 | Construction layout stakes and surveying (623E10000) | LS | 1 | $60,000 | $67,500 | $60,000 |
| 236 | Mobilization (624E10000) | LS | 1 | $259,000 | $265,000 | $309,900 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.