ODOT contract 260327 bid tabulation
CUY-IR 90-20.45 Barrier (MISCELLANEOUS). Let by Ohio DOT on July 30, 2026, CUY. 3 bids received; low bid $12,691,593 by Ruhlin Company, +32% against the engineer's estimate of $9,617,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 114
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ruhlin Company | $12,691,593 | Low | +32% |
| 2 | Karvo Companies Inc | $13,075,871 | +3.0% | +36% |
| 3 | Great Lakes Construction Co | $13,077,088 | +3.0% | +36% |
Engineer's estimate: $9,617,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ruhlin Company | 2. Karvo Companies Inc | 3. Great Lakes Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 | $500.00 | $600.00 |
| 2 | Pavement removed (202E23000) | SY | 244 | $49.00 | $55.00 | $16.00 |
| 3 | Concrete barrier removed, as per plan (202E30701) | FT | 18,540 | $28.00 | $25.00 | $33.19 |
| 4 | Guardrail removed (202E38000) | FT | 188 | $5.00 | $5.00 | $5.00 |
| 5 | Removal misc.: portions of concrete median (202E98000) | LS | 1 | $42,000 | $2,500.00 | $15,000 |
| 6 | Excavation (203E10000) | CY | 455 | $14.00 | $125.00 | $151.00 |
| 7 | Reshaping under guardrail, as per plan (209E15051) | MI | 1 | $100.00 | $100.00 | $25,000 |
| 8 | Guardrail, type MGS (606E15050) | FT | 63 | $31.00 | $31.00 | $31.00 |
| 9 | Guardrail, type MGS half post spacing (606E15150) | FT | 225 | $38.00 | $38.00 | $38.00 |
| 10 | Guardrail, type MGS quarter post spacing (606E15250) | FT | 50 | $46.00 | $46.00 | $46.00 |
| 11 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,950.00 | $2,950.00 | $2,950.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,750.00 | $1,750.00 | $1,750.00 |
| 13 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $750.00 | $750.00 | $750.00 |
| 14 | Fence removed and rebuilt (607E35000) | FT | 20 | $296.00 | $296.00 | $296.00 |
| 15 | Concrete barrier, single slope, type B1, as per plan (622E10101) | FT | 11,804 | $172.00 | $180.00 | $194.00 |
| 16 | Concrete barrier, single slope, type B1, as per plan (622E10101) | FT | 1,065 | $215.00 | $180.00 | $194.00 |
| 17 | Barrier transition (622E10200) | EACH | 7 | $9,000.00 | $12,500 | $7,800.00 |
| 18 | Barrier transition, as per plan (622E10201) | EACH | 2 | $8,500.00 | $10,000 | $6,400.00 |
| 19 | Concrete barrier, end anchorage, reinforced, type B1 (622E25006) | EACH | 186 | $4,500.00 | $4,000.00 | $4,000.00 |
| 20 | Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007) | EACH | 4 | $4,100.00 | $4,500.00 | $3,100.00 |
| 21 | Portable barrier, unanchored (622E41100) | FT | 39,770 | $20.00 | $15.00 | $20.00 |
| 22 | Barrier, misc.: concrete barrier, type B50 (622E90000) | FT | 20 | $450.00 | $750.00 | $340.00 |
| 23 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 24 | Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101) | EACH | 88 | $5,700.00 | $5,500.00 | $8,500.00 |
| 25 | Inlet reconstructed to grade, as per plan (611E99155) | EACH | 10 | $4,000.00 | $4,000.00 | $4,400.00 |
| 26 | Inlet, misc.: barrier inlet screen (611E99500) | EACH | 37 | $675.00 | $225.00 | $350.00 |
| 27 | Inlet, misc.: inlet, no.3 B50 (611E99500) | EACH | 3 | $9,000.00 | $12,500 | $12,000 |
| 28 | Special - miscellaneous metal (611E99820) | LB | 3,000 | $3.15 | $2.50 | $2.00 |
| 29 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 25,622 | $4.00 | $8.00 | $4.00 |
| 30 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 51 | $960.00 | $1,000.00 | $960.00 |
| 31 | Aggregate base (304E20000) | CY | 1,050 | $307.00 | $125.00 | $180.00 |
| 32 | Non-tracking tack coat (407E20000) | GAL | 2,199 | $3.00 | $3.00 | $3.00 |
| 33 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 32 | $1,575.00 | $1,100.00 | $1,575.00 |
| 34 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 16 | $1,450.00 | $1,000.00 | $1,450.00 |
| 35 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 559 | $560.00 | $800.00 | $560.00 |
| 36 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 9.15 | $765.00 | $765.00 | $852.00 |
| 37 | Rumble strips, shoulder (asphalt concrete), as per plan (618E40601) | MI | 7.03 | $965.00 | $965.00 | $852.00 |
| 38 | Connection, fused pull apart (625E00450) | EACH | 98 | $194.00 | $155.00 | $155.00 |
| 39 | Connection, unfused pull apart (625E00460) | EACH | 98 | $184.00 | $155.00 | $155.00 |
| 40 | Connection, unfused permanent (625E00480) | EACH | 188 | $150.00 | $155.00 | $155.00 |
| 41 | Light pole, low mast, as per plan, ALM50 (625E10495) | EACH | 51 | $3,512.00 | $5,250.00 | $5,250.00 |
| 42 | Median light pole foundation, 10' deep, as per plan (625E14307) | EACH | 51 | $8,412.00 | $8,500.00 | $13,500 |
| 43 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 53,046 | $4.36 | $5.50 | $5.50 |
| 44 | No. 10 AWG pole and bracket cable (625E23400) | FT | 5,700 | $1.80 | $2.75 | $2.75 |
| 45 | Conduit cleaned and cables removed (625E25910) | FT | 8,893 | $0.50 | $5.00 | $5.00 |
| 46 | Luminaire, low mast, solid state (LED), as per plan (625E26273) | EACH | 50 | $1,160.00 | $1,250.00 | $1,250.00 |
| 47 | Barrier junction box (625E29940) | EACH | 16 | $3,200.00 | $3,450.00 | $3,450.00 |
| 48 | Ground rod (625E32000) | EACH | 64 | $285.00 | $300.00 | $300.00 |
| 49 | Pull box cleaned (625E39520) | EACH | 14 | $215.00 | $250.00 | $250.00 |
| 50 | Special - maintain existing lighting (625E40000) | LS | 1 | $523,100 | $675,000 | $854,000 |
| 51 | Light tower removed (625E75350) | EACH | 2 | $1,900.00 | $4,800.00 | $4,800.00 |
| 52 | Light pole removed (625E75400) | EACH | 49 | $432.00 | $550.00 | $550.00 |
| 53 | Luminaire removed (625E75506) | EACH | 49 | $109.00 | $75.00 | $75.00 |
| 54 | Delineator, post ground mounted (620E00500) | EACH | 1 | $110.00 | $110.00 | $150.00 |
| 55 | Barrier reflector, type 1, one-way (626E00102) | EACH | 384 | $13.00 | $13.00 | $13.00 |
| 56 | Overhead sign support, type TC-15.116, design 1, as per plan (630E72411) | EACH | 6 | $85,300 | $85,300 | $75,125 |
| 57 | Overhead sign support, type TC-15.116, design 2, as per plan (630E72421) | EACH | 4 | $117,850 | $117,850 | $108,120 |
| 58 | Overhead sign support, type TC-15.116, design 2, as per plan (630E72421) | EACH | 1 | $125,450 | $125,450 | $109,500 |
| 59 | Sign attachment assembly (630E75000) | EACH | 148 | $725.00 | $725.00 | $550.00 |
| 60 | Sign support assembly, pole mounted (630E79500) | EACH | 6 | $245.00 | $245.00 | $165.00 |
| 61 | Sign support assembly, barrier mounted (630E79610) | EACH | 48 | $675.00 | $675.00 | $415.00 |
| 62 | Sign, flat sheet (630E80100) | SF | 35 | $18.00 | $18.00 | $14.25 |
| 63 | Sign, overhead extrusheet (630E80224) | SF | 4,023 | $20.00 | $20.00 | $21.50 |
| 64 | Mainline reference marker (630E81000) | EACH | 36 | $265.00 | $265.00 | $180.00 |
| 65 | Sign erected, flat sheet (630E81100) | SF | 3 | $25.00 | $25.00 | $39.00 |
| 66 | Sign erected, extrusheet (630E81200) | SF | 4,183 | $10.00 | $10.00 | $6.75 |
| 67 | Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010) | EACH | 10 | $23,000 | $17,550 | $17,000 |
| 68 | Concrete barrier median overhead sign support foundation, type TC-21.50, as per plan (630E84011) | EACH | 1 | $20,000 | $10,350 | $16,000 |
| 69 | Rigid overhead sign support foundation (630E84510) | EACH | 10 | $12,475 | $12,475 | $13,225 |
| 70 | Removal of ground mounted sign and reerection (630E85100) | EACH | 15 | $65.00 | $65.00 | $185.00 |
| 71 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 46 | $375.00 | $375.00 | $385.00 |
| 72 | Removal of pole mounted sign and disposal (630E87500) | EACH | 3 | $45.00 | $45.00 | $60.00 |
| 73 | Removal of overhead sign support and disposal, type TC-15.115 (630E89804) | EACH | 11 | $3,150.00 | $3,450.00 | $1,325.00 |
| 74 | Edge line, 6" (646E10010) | MI | 16.83 | $2,920.00 | $2,920.00 | $2,920.00 |
| 75 | Lane line, 6" (646E10110) | MI | 24.84 | $1,995.00 | $1,995.00 | $1,995.00 |
| 76 | Channelizing line, 12" (646E10310) | FT | 8,286 | $2.20 | $2.20 | $2.20 |
| 77 | Chevron marking (646E10620) | FT | 254 | $14.50 | $14.50 | $14.50 |
| 78 | Dotted line, 6" (646E20504) | FT | 7,002 | $2.00 | $2.00 | $2.00 |
| 79 | Dotted line, 12" (646E20510) | FT | 1,018 | $1.65 | $1.65 | $1.65 |
| 80 | ITS JUNCTION BOX, 17x24x6 INCHES (809E00530) | EACH | 27 | $2,387.00 | $1,850.00 | $1,850.00 |
| 81 | ITS pull box with pad and hinged lid assembly, 32" wide, type 1 (809E01920) | EACH | 9 | $3,028.00 | $6,000.00 | $6,000.00 |
| 82 | 32" ITS pull box with pad and hinged lid assembly, type 2 (809E02002) | EACH | 5 | $2,874.00 | $6,200.00 | $6,200.00 |
| 83 | Conduit, multicell, jacked or drilled, 2" (809E24000) | FT | 2,144 | $90.00 | $63.00 | $63.00 |
| 84 | ITS device, misc.:pull box removed (809E65990) | EACH | 5 | $230.00 | $350.00 | $350.00 |
| 85 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 300 | $100.00 | $150.00 | $100.00 |
| 86 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 12 | $1,742.91 | $2,450.00 | $2,000.00 |
| 87 | Work zone increased penalties sign (614E12484) | EACH | 16 | $255.29 | $250.00 | $150.00 |
| 88 | Work zone raised pavement marker (614E12800) | EACH | 1,797 | $17.50 | $17.50 | $8.75 |
| 89 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $2,100.00 | $200.00 | $445.47 |
| 90 | Barrier reflector, type 1, one-way (614E13310) | EACH | 785 | $11.11 | $11.00 | $8.50 |
| 91 | Barrier reflector, type 3, one-way (614E13314) | EACH | 240 | $11.11 | $11.00 | $9.00 |
| 92 | Object marker, one way (614E13350) | EACH | 1,025 | $19.98 | $20.00 | $17.50 |
| 93 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $925.37 | $1,000.00 | $750.00 |
| 94 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 49.05 | $340.00 | $340.00 | $340.00 |
| 95 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 33.52 | $850.00 | $850.00 | $850.00 |
| 96 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 11,844 | $0.95 | $0.95 | $0.95 |
| 97 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 12,167 | $0.75 | $0.75 | $0.75 |
| 98 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 300 | $26.57 | $25.00 | $25.00 |
| 99 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 96 | $647.12 | $650.00 | $550.00 |
| 100 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 96 | $1,036.94 | $1,050.00 | $635.00 |
| 101 | Portable changeable message sign, as per plan (896E00021) | SNMT | 24 | $925.37 | $1,000.00 | $1,125.00 |
| 102 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $6,360.00 | $10,500 | $8,000.00 |
| 103 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $8,500.00 | $3,500.00 | $1,500.00 |
| 104 | Unclassified excavation (503E21300) | LS | 1 | $4,800.00 | $3,500.00 | $2,000.00 |
| 105 | Epoxy coated steel reinforcement (509E10000) | LB | 161 | $10.00 | $20.00 | $2.75 |
| 106 | Class QC1 concrete, misc.: retaining wall pilaster (511E53010) | CY | 2 | $6,500.00 | $2,000.00 | $1,250.00 |
| 107 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $110,000 | $87,000 | $75,000 |
| 108 | CPM progress schedule (108E10000) | LS | 1 | $500.00 | $39,900 | $100.00 |
| 109 | Maintaining traffic (614E11000) | LS | 1 | $937,850 | $925,000 | $600,000 |
| 110 | Field office, type B, as per plan (619E16011) | MNTH | 12 | $6,500.00 | $4,000.00 | $3,550.00 |
| 111 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $70,000 | $100,000 | $35,000 |
| 112 | Mobilization (624E10000) | LS | 1 | $634,000 | $1,000,000 | $645,000 |
| 200 | Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007) | EACH | 24 | $5,900.00 | $5,000.00 | $7,500.00 |
| 201 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 509 | $565.00 | $650.00 | $565.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.