ODOT contract 260327 bid tabulation

CUY-IR 90-20.45 Barrier (MISCELLANEOUS). Let by Ohio DOT on July 30, 2026, CUY. 3 bids received; low bid $12,691,593 by Ruhlin Company, +32% against the engineer's estimate of $9,617,000.

Owner
Ohio DOT
Letting
30 JUL 2026
Pay items
114
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ruhlin Company$12,691,593Low+32%
2Karvo Companies Inc$13,075,871+3.0%+36%
3Great Lakes Construction Co$13,077,088+3.0%+36%
ODOT contract 260327: bids by rank

Engineer's estimate: $9,617,000.

Bid tabulation

LinePay itemUnitQuantity1. Ruhlin Company2. Karvo Companies Inc3. Great Lakes Construction Co
1Clearing and grubbing (201E11000)LS1$10,000$500.00$600.00
2Pavement removed (202E23000)SY244$49.00$55.00$16.00
3Concrete barrier removed, as per plan (202E30701)FT18,540$28.00$25.00$33.19
4Guardrail removed (202E38000)FT188$5.00$5.00$5.00
5Removal misc.: portions of concrete median (202E98000)LS1$42,000$2,500.00$15,000
6Excavation (203E10000)CY455$14.00$125.00$151.00
7Reshaping under guardrail, as per plan (209E15051)MI1$100.00$100.00$25,000
8Guardrail, type MGS (606E15050)FT63$31.00$31.00$31.00
9Guardrail, type MGS half post spacing (606E15150)FT225$38.00$38.00$38.00
10Guardrail, type MGS quarter post spacing (606E15250)FT50$46.00$46.00$46.00
11Anchor assembly, MGS type E (606E26150)EACH1$2,950.00$2,950.00$2,950.00
12Anchor assembly, MGS type T (606E26550)EACH5$1,750.00$1,750.00$1,750.00
13MGS bridge terminal assembly, type 2 (606E35102)EACH1$750.00$750.00$750.00
14Fence removed and rebuilt (607E35000)FT20$296.00$296.00$296.00
15Concrete barrier, single slope, type B1, as per plan (622E10101)FT11,804$172.00$180.00$194.00
16Concrete barrier, single slope, type B1, as per plan (622E10101)FT1,065$215.00$180.00$194.00
17Barrier transition (622E10200)EACH7$9,000.00$12,500$7,800.00
18Barrier transition, as per plan (622E10201)EACH2$8,500.00$10,000$6,400.00
19Concrete barrier, end anchorage, reinforced, type B1 (622E25006)EACH186$4,500.00$4,000.00$4,000.00
20Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007)EACH4$4,100.00$4,500.00$3,100.00
21Portable barrier, unanchored (622E41100)FT39,770$20.00$15.00$20.00
22Barrier, misc.: concrete barrier, type B50 (622E90000)FT20$450.00$750.00$340.00
23Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
24Inlet, no. 3 for single slope barrier, type B1, as per plan (611E99101)EACH88$5,700.00$5,500.00$8,500.00
25Inlet reconstructed to grade, as per plan (611E99155)EACH10$4,000.00$4,000.00$4,400.00
26Inlet, misc.: barrier inlet screen (611E99500)EACH37$675.00$225.00$350.00
27Inlet, misc.: inlet, no.3 B50 (611E99500)EACH3$9,000.00$12,500$12,000
28Special - miscellaneous metal (611E99820)LB3,000$3.15$2.50$2.00
29Pavement planing, asphalt concrete, 1.5" (254E01000)SY25,622$4.00$8.00$4.00
30Asphalt concrete base, PG64-22, (449) (301E56000)CY51$960.00$1,000.00$960.00
31Aggregate base (304E20000)CY1,050$307.00$125.00$180.00
32Non-tracking tack coat (407E20000)GAL2,199$3.00$3.00$3.00
33Asphalt concrete intermediate course, type 2, (449) (441E70300)CY32$1,575.00$1,100.00$1,575.00
34Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801)CY16$1,450.00$1,000.00$1,450.00
35Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101)CY559$560.00$800.00$560.00
36Rumble strips, shoulder (asphalt concrete) (618E40600)MI9.15$765.00$765.00$852.00
37Rumble strips, shoulder (asphalt concrete), as per plan (618E40601)MI7.03$965.00$965.00$852.00
38Connection, fused pull apart (625E00450)EACH98$194.00$155.00$155.00
39Connection, unfused pull apart (625E00460)EACH98$184.00$155.00$155.00
40Connection, unfused permanent (625E00480)EACH188$150.00$155.00$155.00
41Light pole, low mast, as per plan, ALM50 (625E10495)EACH51$3,512.00$5,250.00$5,250.00
42Median light pole foundation, 10' deep, as per plan (625E14307)EACH51$8,412.00$8,500.00$13,500
43No. 4 AWG 2400 volt distribution cable (625E23200)FT53,046$4.36$5.50$5.50
44No. 10 AWG pole and bracket cable (625E23400)FT5,700$1.80$2.75$2.75
45Conduit cleaned and cables removed (625E25910)FT8,893$0.50$5.00$5.00
46Luminaire, low mast, solid state (LED), as per plan (625E26273)EACH50$1,160.00$1,250.00$1,250.00
47Barrier junction box (625E29940)EACH16$3,200.00$3,450.00$3,450.00
48Ground rod (625E32000)EACH64$285.00$300.00$300.00
49Pull box cleaned (625E39520)EACH14$215.00$250.00$250.00
50Special - maintain existing lighting (625E40000)LS1$523,100$675,000$854,000
51Light tower removed (625E75350)EACH2$1,900.00$4,800.00$4,800.00
52Light pole removed (625E75400)EACH49$432.00$550.00$550.00
53Luminaire removed (625E75506)EACH49$109.00$75.00$75.00
54Delineator, post ground mounted (620E00500)EACH1$110.00$110.00$150.00
55Barrier reflector, type 1, one-way (626E00102)EACH384$13.00$13.00$13.00
56Overhead sign support, type TC-15.116, design 1, as per plan (630E72411)EACH6$85,300$85,300$75,125
57Overhead sign support, type TC-15.116, design 2, as per plan (630E72421)EACH4$117,850$117,850$108,120
58Overhead sign support, type TC-15.116, design 2, as per plan (630E72421)EACH1$125,450$125,450$109,500
59Sign attachment assembly (630E75000)EACH148$725.00$725.00$550.00
60Sign support assembly, pole mounted (630E79500)EACH6$245.00$245.00$165.00
61Sign support assembly, barrier mounted (630E79610)EACH48$675.00$675.00$415.00
62Sign, flat sheet (630E80100)SF35$18.00$18.00$14.25
63Sign, overhead extrusheet (630E80224)SF4,023$20.00$20.00$21.50
64Mainline reference marker (630E81000)EACH36$265.00$265.00$180.00
65Sign erected, flat sheet (630E81100)SF3$25.00$25.00$39.00
66Sign erected, extrusheet (630E81200)SF4,183$10.00$10.00$6.75
67Concrete barrier median overhead sign support foundation, type TC-21.50 (630E84010)EACH10$23,000$17,550$17,000
68Concrete barrier median overhead sign support foundation, type TC-21.50, as per plan (630E84011)EACH1$20,000$10,350$16,000
69Rigid overhead sign support foundation (630E84510)EACH10$12,475$12,475$13,225
70Removal of ground mounted sign and reerection (630E85100)EACH15$65.00$65.00$185.00
71Removal of overhead mounted sign and disposal (630E87400)EACH46$375.00$375.00$385.00
72Removal of pole mounted sign and disposal (630E87500)EACH3$45.00$45.00$60.00
73Removal of overhead sign support and disposal, type TC-15.115 (630E89804)EACH11$3,150.00$3,450.00$1,325.00
74Edge line, 6" (646E10010)MI16.83$2,920.00$2,920.00$2,920.00
75Lane line, 6" (646E10110)MI24.84$1,995.00$1,995.00$1,995.00
76Channelizing line, 12" (646E10310)FT8,286$2.20$2.20$2.20
77Chevron marking (646E10620)FT254$14.50$14.50$14.50
78Dotted line, 6" (646E20504)FT7,002$2.00$2.00$2.00
79Dotted line, 12" (646E20510)FT1,018$1.65$1.65$1.65
80ITS JUNCTION BOX, 17x24x6 INCHES (809E00530)EACH27$2,387.00$1,850.00$1,850.00
81ITS pull box with pad and hinged lid assembly, 32" wide, type 1 (809E01920)EACH9$3,028.00$6,000.00$6,000.00
8232" ITS pull box with pad and hinged lid assembly, type 2 (809E02002)EACH5$2,874.00$6,200.00$6,200.00
83Conduit, multicell, jacked or drilled, 2" (809E24000)FT2,144$90.00$63.00$63.00
84ITS device, misc.:pull box removed (809E65990)EACH5$230.00$350.00$350.00
85Law enforcement officer with patrol car for assistance (614E11110)HR300$100.00$150.00$100.00
86Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH12$1,742.91$2,450.00$2,000.00
87Work zone increased penalties sign (614E12484)EACH16$255.29$250.00$150.00
88Work zone raised pavement marker (614E12800)EACH1,797$17.50$17.50$8.75
89Asphalt concrete for maintaining traffic (614E13000)CY25$2,100.00$200.00$445.47
90Barrier reflector, type 1, one-way (614E13310)EACH785$11.11$11.00$8.50
91Barrier reflector, type 3, one-way (614E13314)EACH240$11.11$11.00$9.00
92Object marker, one way (614E13350)EACH1,025$19.98$20.00$17.50
93Portable changeable message sign, as per plan (614E18601)SNMT12$925.37$1,000.00$750.00
94Work zone lane line, class I, 6", 642 paint (614E20110)MI49.05$340.00$340.00$340.00
95Work zone edge line, class I, 6", 642 paint (614E22110)MI33.52$850.00$850.00$850.00
96Work zone channelizing line, class I, 12", 642 paint (614E23210)FT11,844$0.95$0.95$0.95
97Work zone dotted line, class I, 6", 642 paint (614E24202)FT12,167$0.75$0.75$0.75
98Signing, misc.: additional signs, ground mounted, (630E97800)SF300$26.57$25.00$25.00
99Digital speed limit (DSL) sign assembly (808E18700)SNMT96$647.12$650.00$550.00
100Portable non-intrusive traffic sensor, class I (896E00010)SNMT96$1,036.94$1,050.00$635.00
101Portable changeable message sign, as per plan (896E00021)SNMT24$925.37$1,000.00$1,125.00
102Portions of structure removed, as per plan (202E11201)LS1$6,360.00$10,500$8,000.00
103Cofferdams and excavation bracing, as per plan (503E11101)LS1$8,500.00$3,500.00$1,500.00
104Unclassified excavation (503E21300)LS1$4,800.00$3,500.00$2,000.00
105Epoxy coated steel reinforcement (509E10000)LB161$10.00$20.00$2.75
106Class QC1 concrete, misc.: retaining wall pilaster (511E53010)CY2$6,500.00$2,000.00$1,250.00
107Premium for contract performance bond and for payment bond (103E05000)LS1$110,000$87,000$75,000
108CPM progress schedule (108E10000)LS1$500.00$39,900$100.00
109Maintaining traffic (614E11000)LS1$937,850$925,000$600,000
110Field office, type B, as per plan (619E16011)MNTH12$6,500.00$4,000.00$3,550.00
111Construction layout stakes and surveying, as per plan (623E10001)LS1$70,000$100,000$35,000
112Mobilization (624E10000)LS1$634,000$1,000,000$645,000
200Concrete barrier, end anchorage, reinforced, type B1, as per plan (622E25007)EACH24$5,900.00$5,000.00$7,500.00
201Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101)CY509$565.00$650.00$565.00
ODOT contract 260327: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy