ODOT contract 268012 bid tabulation
VAN-Bonnewitz Avenue Signal (SIGNALIZATION). Let by Ohio DOT on June 25, 2026, VAN. 3 bids received; low bid $567,680 by Perram Electric Inc, -0.4% against the engineer's estimate of $570,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 91
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perram Electric Inc | $567,680 | Low | 0.0% |
| 2 | U S Utility Contractor Company | $593,531 | +5.0% | +4.0% |
| 3 | Madex Construction Co | $1,309,847 | +131% | +130% |
Engineer's estimate: $570,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perram Electric Inc | 2. U S Utility Contractor Company | 3. Madex Construction Co |
|---|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 1,343 | $6.00 | $6.30 | $15.00 |
| 2 | Curb and gutter removed (202E32500) | FT | 234 | $15.00 | $15.75 | $35.00 |
| 3 | Valve box removed (202E75610) | EACH | 1 | $500.00 | $525.00 | $1,800.00 |
| 4 | Removal misc.: removed (202E98000) | LS | 1 | $7,500.00 | $7,875.00 | $957.00 |
| 5 | Excavation (203E10000) | CY | 102 | $45.00 | $47.25 | $55.00 |
| 6 | Subgrade compaction (204E10000) | SY | 152 | $3.00 | $3.15 | $10.00 |
| 7 | Excavation of subgrade (204E13000) | CY | 51 | $40.00 | $42.00 | $57.00 |
| 8 | 4" concrete walk (608E10000) | SF | 257 | $17.50 | $18.38 | $25.00 |
| 9 | 6" concrete walk (608E13000) | SF | 488 | $19.50 | $20.48 | $29.00 |
| 10 | Curb ramp (608E52000) | SF | 803 | $17.50 | $18.38 | $49.00 |
| 11 | Curb ramp (608E52000) | SF | 81 | $19.50 | $20.48 | $53.00 |
| 12 | Curb ramp (608E52000) | SF | 34 | $21.75 | $22.84 | $59.00 |
| 13 | Seeding and mulching, class 1, as per plan (659E00501) | SY | 66 | $20.00 | $21.00 | $49.00 |
| 14 | Erosion control (832E30000) | EACH | 1,500 | $1.00 | $1.00 | $1.00 |
| 15 | 4" conduit, type B (611E00100) | FT | 50 | $15.00 | $15.75 | $100.00 |
| 16 | 6" conduit, type B (611E00900) | FT | 50 | $17.00 | $17.85 | $110.00 |
| 17 | 8" conduit, type B (611E01800) | FT | 50 | $19.00 | $19.95 | $125.00 |
| 18 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 2 | $1,440.00 | $1,244.50 | $7,500.00 |
| 19 | Aggregate base (304E20000) | CY | 29 | $120.00 | $126.00 | $180.00 |
| 20 | Non-tracking tack coat (407E20000) | GAL | 8 | $6.00 | $3.69 | $10.00 |
| 21 | Stabilized crushed aggregate (411E10000) | CY | 17 | $120.00 | $126.00 | $190.00 |
| 22 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 6 | $950.00 | $1,244.50 | $7,500.00 |
| 23 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 234 | $60.00 | $63.00 | $102.00 |
| 24 | Curb, type 10-B, as per plan (609E33201) | FT | 62 | $50.00 | $52.50 | $129.00 |
| 25 | 8" concrete traffic island (609E57000) | SY | 8 | $125.00 | $131.25 | $241.00 |
| 26 | Low strength mortar backfill (613E41200) | CY | 7 | $375.00 | $393.75 | $281.00 |
| 27 | Ground mounted support, no. 3 post (630E03100) | FT | 13 | $20.90 | $17.85 | $80.00 |
| 28 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 6 | $390.00 | $577.50 | $900.00 |
| 29 | Sign, flat sheet (630E80100) | SF | 34 | $34.20 | $29.40 | $60.51 |
| 30 | Sign, street name, as per plan (630E80511) | EACH | 4 | $347.00 | $236.25 | $449.00 |
| 31 | Removal of ground mounted sign and storage (630E85000) | EACH | 2 | $104.00 | $26.25 | $80.00 |
| 32 | Removal of ground mounted post support and storage (630E86006) | EACH | 1 | $104.00 | $26.25 | $80.00 |
| 33 | Center line (644E00300) | MI | 0.03 | $15,835 | $21,000 | $29,000 |
| 34 | Channelizing line, 12" (644E00404) | FT | 100 | $3.70 | $5.25 | $6.70 |
| 35 | Stop line (644E00500) | FT | 48 | $19.00 | $11.55 | $39.00 |
| 36 | Crosswalk line, 12" (644E00620) | FT | 356 | $9.50 | $5.25 | $29.00 |
| 37 | Removal of pavement marking (644E30000) | FT | 516 | $9.30 | $6.30 | $24.00 |
| 38 | 4" conduit, type E (611E00400) | FT | 80 | $1.25 | $13.15 | $33.00 |
| 39 | Bracket arm, 15', as per plan (625E18201) | EACH | 3 | $1,015.00 | $1,360.80 | $3,150.00 |
| 40 | Conduit, 2", 725.051 (625E25408) | FT | 168 | $11.65 | $8.86 | $49.50 |
| 41 | Conduit, 3", 725.051 (625E25504) | FT | 82 | $14.80 | $10.17 | $54.00 |
| 42 | Conduit, 4", 725.051 (625E25604) | FT | 168 | $18.45 | $11.35 | $66.00 |
| 43 | Conduit, jacked or drilled, 725.052, as per plan (625E25909) | FT | 299 | $53.90 | $49.09 | $132.00 |
| 44 | Conduit, jacked or drilled, 725.052, as per plan (625E25909) | FT | 86 | $67.05 | $50.27 | $147.00 |
| 45 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 3 | $630.00 | $700.46 | $1,800.00 |
| 46 | Trench (625E29000) | FT | 334 | $20.25 | $12.66 | $42.00 |
| 47 | Pull box, 725.08, 18" (625E30700) | EACH | 2 | $1,930.00 | $1,189.00 | $3,300.00 |
| 48 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $2,135.00 | $1,572.50 | $4,050.00 |
| 49 | Ground rod (625E32000) | EACH | 11 | $327.00 | $282.50 | $1,200.00 |
| 50 | Underground warning marking tape (625E36010) | FT | 334 | $1.25 | $2.06 | $12.00 |
| 51 | Arc flash calculations and label, signal power ser (625E76000) | EACH | 1 | $1,800.00 | $3,490.00 | $6,900.00 |
| 52 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 6 | $1,055.00 | $1,375.44 | $3,900.00 |
| 53 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 2 | $1,815.00 | $2,209.00 | $5,400.00 |
| 54 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $532.00 | $856.00 | $2,250.00 |
| 55 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 8 | $1,267.00 | $1,302.28 | $2,100.00 |
| 56 | Covering of vehicular signal head (632E25000) | EACH | 8 | $20.00 | $37.95 | $112.50 |
| 57 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $10.00 | $30.36 | $75.00 |
| 58 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 2,825 | $3.51 | $4.74 | $14.50 |
| 59 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,237 | $4.16 | $5.36 | $19.50 |
| 60 | Interconnect, misc.: spread spectrum radio unit (632E62820) | EACH | 2 | $3,995.00 | $7,221.32 | $8,750.00 |
| 61 | Signal support foundation, as per plan (632E64011) | EACH | 4 | $8,105.00 | $7,388.00 | $15,250 |
| 62 | Pedestal foundation (632E64020) | EACH | 6 | $1,620.00 | $2,053.50 | $3,600.00 |
| 63 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 1,928 | $2.70 | $3.35 | $12.00 |
| 64 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 80 | $7.55 | $7.32 | $270.00 |
| 65 | Power service, as per plan (632E70001) | EACH | 1 | $3,640.00 | $5,777.00 | $3,750.00 |
| 66 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $1,220.00 | $1,611.00 | $2,025.00 |
| 67 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 1 | $20,365 | $23,455 | $42,750 |
| 68 | Combination signal support, type TC-81.22, design 12, as per plan (632E79131) | EACH | 2 | $17,855 | $21,249 | $38,250 |
| 69 | Combination signal support, type TC-81.22, design 14, as per plan (632E79151) | EACH | 1 | $23,730 | $27,693 | $48,750 |
| 70 | Pedestal, 10.7' tall, transformer base, as per plan (632E89921) | EACH | 6 | $2,387.00 | $2,379.62 | $4,950.00 |
| 71 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $8,280.00 | $10,900 | $12,750 |
| 72 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $25,265 | $25,960 | $44,250 |
| 73 | Cabinet foundation (633E67100) | EACH | 1 | $3,670.00 | $2,382.50 | $7,200.00 |
| 74 | Controller work pad, as per plan (633E67201) | EACH | 1 | $920.00 | $1,817.50 | $3,375.00 |
| 75 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $6,620.00 | $7,428.40 | $12,900 |
| 76 | Controller item, misc.:signal timing adjustments (633E99000) | EACH | 1 | $880.00 | $1,606.50 | $3,900.00 |
| 77 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $10,770 | $11,355 | $23,250 |
| 78 | Atc controller, as per plan (809E69123) | EACH | 1 | $6,065.00 | $6,916.94 | $15,750 |
| 79 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 1 | $565.00 | $3,124.80 | $1,374.00 |
| 80 | Preempt receiving unit, as per plan (809E69211) | EACH | 4 | $945.00 | $2,220.84 | $3,600.00 |
| 81 | Preempt detector cable, as per plan (809E69221) | FT | 1,220 | $2.21 | $4.29 | $9.00 |
| 82 | Preempt phase selector, as per plan (809E69231) | EACH | 1 | $4,415.00 | $5,505.44 | $8,100.00 |
| 83 | Preempt confirmation light, as per plan (809E69241) | EACH | 4 | $605.00 | $1,282.00 | $2,400.00 |
| 84 | Law enforcement officer with patrol car for assistance, as per plan (614E11111) | HR | 16 | $120.00 | $112.10 | $125.00 |
| 85 | Water (616E10000) | MGAL | 1 | $150.00 | $17.70 | $39.00 |
| 86 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,850.00 | $1,711.00 | $5,700.00 |
| 87 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,850.00 | $1,711.00 | $6,700.00 |
| 88 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,623.38 | $10,325 | $29,150 |
| 89 | Maintaining traffic (614E11000) | LS | 1 | $47,285 | $20,830 | $29,856 |
| 90 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $6,000.00 | $4,872.00 | $19,843 |
| 91 | Mobilization (624E10000) | LS | 1 | $28,000 | $28,115 | $74,987 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.