ODOT contract 250478 bid tabulation

D06-ELEC FY26 (LIGHTING). Let by Ohio DOT on October 9, 2025, District 6. 4 bids received; low bid $489,159 by Perram Electric Inc, -4.6% against the engineer's estimate of $513,000.

Owner
Ohio DOT
Letting
09 OCT 2025
Pay items
93
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Perram Electric Inc$489,159Low-5.0%
2Complete General Construction Company$583,070+19%+14%
3Capital Electric Line Builders Inc$650,535+33%+27%
4Danbert Electrical Corp$655,363+34%+28%
ODOT contract 250478: bids by rank

Engineer's estimate: $513,000.

Bid tabulation

LinePay itemUnitQuantity1. Perram Electric Inc2. Complete General Construction Company3. Capital Electric Line Builders Inc4. Danbert Electrical Corp
1Erosion control (832E30000)EACH1,000$1.00$1.00$1.00$1.00
2Connection, fused pull apart (625E00450)EACH32$170.00$115.00$102.19$157.00
3Connection, unfused pull apart (625E00460)EACH32$150.00$115.00$97.21$145.00
4Connection, unfused permanent (625E00480)EACH10$150.00$110.00$71.79$133.00
5Transformer base, type at-A (625E02500)EACH10$790.00$675.00$913.36$777.00
6Transformer base, type at-C (625E02600)EACH4$920.00$750.00$1,068.31$939.00
7Transformer base, misc.: install only, as per plan (625E02803)EACH10$280.00$175.00$315.36$165.00
8Light pole, conventional, as per plan, AT15B41.7 (625E10491)EACH10$4,030.00$3,850.00$2,820.95$4,750.00
9Light pole, conventional, as per plan, AT15BB32.5 (625E10491)EACH1$5,335.00$4,750.00$3,577.65$6,148.00
10Light pole, conventional, as per plan, AT20B41.7 (625E10491)EACH1$4,680.00$5,000.00$3,026.80$5,530.00
11Light pole, low mast, ATLM50 (625E10494)EACH2$5,060.00$4,750.00$3,783.50$5,986.00
12Light pole, low mast, LM50 (625E10494)EACH2$5,220.00$4,750.00$4,540.36$6,178.00
13Light pole (installation only), as per plan (625E10503)EACH5$700.00$575.00$756.86$580.00
14Erecting reusable downed light pole (625E10504)EACH15$560.00$400.00$785.61$440.00
15Light pole foundation repair, as per plan (625E14401)EACH1$925.00$1,500.00$1,124.15$1,838.00
16Light pole foundation (625E14500)EACH1$1,820.00$1,850.00$3,053.30$2,406.00
17Bracket arm, 15', as per plan (625E18201)EACH2$1,015.00$1,200.00$1,072.06$1,102.00
18Bracket arm, 20', as per plan (625E18401)EACH1$1,390.00$1,575.00$1,103.11$1,662.00
19Bracket arm, misc.: install only (625E18600)EACH1$420.00$475.00$378.43$440.00
20No. 4 AWG 2400 volt distribution cable, as per plan (625E23201)FT1,000$3.75$4.50$3.62$5.61
21No. 2 AWG 2400 volt distribution cable, as per plan (625E23301)FT1,000$4.15$5.00$4.08$6.93
22No. 10 AWG pole and bracket cable (625E23400)FT2,000$1.65$1.50$2.56$1.78
231-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT300$12.80$15.00$18.44$18.70
241-1/2" duct cable with three no. 2 AWG 2400 volt cables (625E24330)FT300$15.80$20.00$116.99$21.10
25Conduit, 2", 725.04 (625E25400)FT200$16.00$25.00$15.28$26.92
26Conduit, 3", 725.04 (625E25500)FT200$27.40$37.00$26.94$50.76
27Conduit, jacked or drilled, under pavement, 3" (625E25900)FT50$79.20$42.00$84.19$89.12
28Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH10$210.00$190.00$31.54$165.00
29Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH10$400.00$450.00$164.71$477.00
30Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH16$360.00$400.00$164.71$429.00
31Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH1$280.00$230.00$63.07$440.00
32Luminaire, low mast, solid state (LED), as per plan (625E26273)EACH1$280.00$350.00$63.07$330.00
33Luminaire, misc.: group luminaire replacement, con (625E27600)EACH128$468.00$375.00$164.71$429.00
34Trench (625E29000)FT200$8.00$10.00$10.21$11.00
35Pull box, 725.08, 18" (625E30700)EACH1$1,250.00$1,300.00$1,584.15$1,332.00
36Pull box, 725.08, 24" (625E30706)EACH1$1,300.00$1,475.00$1,699.15$1,452.00
37Pull box removed and replaced, as per plan (625E31507)EACH1$1,440.00$1,500.00$1,699.15$1,552.00
38Pull box removed (625E31510)EACH1$140.00$250.00$1,044.36$354.00
39Ground rod, as per plan (625E32001)EACH1$270.00$300.00$235.57$436.00
40Circuit breaker, tower lighting, as per plan (625E33101)EACH3$840.00$600.00$753.07$765.00
41Power service, as per plan (625E34001)EACH1$13,920$11,000$13,237$10,480
42Power service refurbished, as per plan (625E34011)EACH1$12,980$9,000.00$13,237$14,100
43Control center cabinet, complete, as per plan (625E34451)EACH1$6,640.00$9,200.00$7,122.87$12,250
44Repair integral luminaire lowering mechanism of tower lighting fixture, as per plan (625E50401)EACH8$5,300.00$14,350$17,377$18,255
45Secondary surge protector, as per plan (625E50451)EACH1$540.00$275.00$60.29$525.00
46Lighting contactor, as per plan (625E70001)EACH2$640.00$850.00$1,276.14$1,030.00
47Light pole removed (625E75400)EACH2$280.00$400.00$504.57$440.00
48Portion of light pole foundation removed (625E75502)EACH4$560.00$600.00$871.86$560.00
49Distribution cable removed (625E75550)FT1,000$1.40$0.75$1.26$0.88
50Lighting, misc.: fuse (KTK-10, 10 amp lighting fus (625E98000)EACH20$84.00$30.00$42.75$70.00
51Lighting, misc.: photocell (for control center or (625E98000)EACH1$240.00$300.00$55.74$310.00
52Lighting, misc.: test plug, as per plan (625E98000)EACH5$240.00$350.00$178.07$1,000.00
53Lighting, misc.: troubleshooting (includes 2 men A (625E98700)HR20$210.00$400.00$252.29$450.00
54Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH18$940.00$1,100.00$1,204.92$1,612.00
55Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086)EACH10$1,520.00$1,900.00$2,022.22$2,332.00
56Pedestrian signal head (LED), type D2, countdown (632E20730)EACH2$460.00$800.00$843.03$926.00
57Accessible pedestrian pushbutton (632E20750)EACH4$1,020.00$920.00$1,193.42$940.00
58Covering of vehicular signal head (632E25000)EACH1$20.00$40.00$68.82$183.00
59Covering of pedestrian signal head (632E25010)EACH2$20.00$35.00$68.82$122.00
60Pedestrian pushbutton (632E26000)EACH4$250.00$450.00$382.24$358.00
61Detector loop (632E26500)EACH1$1,340.00$3,900.00$3,270.37$5,502.00
62Loop detector tie in (632E27200)EACH1$220.00$110.00$183.64$164.00
63Messenger wire, 7 strand, 3/8" diameter with accessories (632E30200)FT500$10.00$14.00$24.20$15.88
64Tether wire, with accessories, as per plan (632E30601)FT500$13.50$21.00$24.20$15.36
65Signal cable, 7 conductor, no. 14 AWG, as per plan (632E40701)FT2,000$3.35$3.50$2.99$4.62
66Pedestal foundation (632E64020)EACH1$1,010.00$1,100.00$2,446.65$2,020.00
67Loop detector lead-in cable (632E65200)FT1,000$2.55$2.00$1.81$3.27
68Power cable, 1 conductor, no. 8 AWG (632E67190)FT100$2.20$2.50$2.03$3.52
69Service cable, 3 conductor, no. 6 AWG (632E69800)FT100$5.80$5.50$4.02$5.92
70Power service (632E70000)EACH1$2,820.00$2,400.00$6,911.59$2,516.00
71Conduit riser, 2" diameter (632E70400)EACH1$680.00$1,100.00$734.57$2,224.00
72Wood pole (632E89300)EACH1$1,840.00$1,325.00$2,159.15$1,660.00
73Down guy (632E89400)EACH1$580.00$1,050.00$1,584.15$2,440.00
74Pedestal, 8', transformer base (632E89900)EACH1$640.00$1,100.00$907.43$1,376.00
75Removal of miscellaneous traffic signal item: cont (632E90020)EACH1$280.00$550.00$2,018.30$1,100.00
76Removal of miscellaneous traffic signal item: stra (632E90020)EACH1$280.00$1,325.00$2,018.30$660.00
77Removal of miscellaneous traffic signal item: stra (632E90020)EACH1$700.00$1,075.00$2,133.30$1,000.00
78Removal of miscellaneous traffic signal item: vehi (632E90020)EACH1$140.00$190.00$504.57$550.00
79Removal of miscellaneous traffic signal item: over (632E90030)FT500$1.40$2.00$8.07$2.20
80Reuse of vehicular signal head (632E90200)EACH8$280.00$375.00$510.32$1,340.00
81Signalization, misc.: traffic signal cable, instal (632E90500)FT500$1.95$2.75$1.26$2.64
82Signalization, misc.: unlash and relash messenger (632E90500)FT1,000$1.70$8.00$5.05$1.76
83Signalization, misc.: wavetronix cable (632E90500)FT500$2.70$4.00$1.84$3.56
84Controller item, misc.: anchor bolt installation (633E99000)EACH1$170.00$165.00$964.57$560.00
85Law enforcement officer with patrol car for assistance (614E11110)HR60$100.00$100.00$92.00$120.00
86Maintenance of traffic, one lane closure on A two lane highway (614E13600)EACH5$860.00$1,450.00$3,698.68$1,180.00
87Maintenance of traffic, one lane closure on A four lane undivided highway (614E13700)EACH5$580.00$2,000.00$5,588.51$1,180.00
88Maintenance of traffic, one lane closure on A 4 lane or greater divided highway (614E13800)EACH5$580.00$2,000.00$6,585.58$1,180.00
89Maintenance of traffic for shoulder closure (614E13900)EACH30$140.00$650.00$328.96$464.00
90Maintaining traffic, misc.: new cabinet installati (614E18000)EACH1$2,440.00$2,800.00$4,822.87$1,760.00
91Premium for contract performance bond and for payment bond (103E05000)LS1$19,270$3,500.00$6,541.60$3,500.00
92Construction layout stakes and surveying (623E10000)LS1$500.00$4,500.00$5,034.15$3,000.00
93Mobilization, as per plan (624E15001)EACH17$2,940.00$2,500.00$1,548.94$1,320.00
ODOT contract 250478: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy