ODOT contract 260515 bid tabulation
D03-TSG FY2027 (M) (SIGNALIZATION). Let by Ohio DOT on November 12, 2026, District 3. 2 bids received; low bid $696,256 by Perram Electric Inc, +9.3% against the engineer's estimate of $637,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 42
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perram Electric Inc | $696,256 | Low | +9.0% |
| 2 | Miller Cable Company | $767,104 | +10% | +20% |
Engineer's estimate: $637,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perram Electric Inc | 2. Miller Cable Company |
|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 |
| 2 | Connection, unfused pull apart (625E00460) | EACH | 12 | $179.50 | $120.00 |
| 3 | Connection, unfused permanent (625E00480) | EACH | 3 | $199.50 | $120.00 |
| 4 | Light pole foundation, 30" X 8' deep (625E14260) | EACH | 6 | $2,594.00 | $2,900.00 |
| 5 | Bracket arm, 16' (625E18210) | EACH | 1 | $1,360.00 | $1,800.00 |
| 6 | Bracket arm, 18' (625E18300) | EACH | 1 | $2,131.00 | $2,600.00 |
| 7 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,493 | $3.87 | $5.00 |
| 8 | No. 10 AWG 600 volt distribution cable, as per plan (625E23307) | FT | 310 | $3.28 | $2.50 |
| 9 | No. 10 AWG pole and bracket cable (625E23400) | FT | 402 | $2.91 | $2.00 |
| 10 | Conduit, 2", 725.04 (625E25400) | FT | 1,423 | $25.22 | $25.00 |
| 11 | Luminaire, conventional, solid state (LED) ies-ihm (625E26252) | EACH | 2 | $429.00 | $450.00 |
| 12 | Trench (625E29000) | FT | 1,423 | $13.89 | $15.00 |
| 13 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $2,144.00 | $1,400.00 |
| 14 | Ground rod (625E32000) | EACH | 6 | $329.00 | $300.00 |
| 15 | Control center cabinet, complete, as per plan (625E34451) | EACH | 1 | $1,167.00 | $1,750.00 |
| 16 | Remove and reerect existing light pole (625E35010) | EACH | 6 | $1,294.00 | $1,850.00 |
| 17 | Underground warning marking tape (625E36010) | FT | 1,423 | $1.30 | $3.00 |
| 18 | Light pole foundation removed (625E75500) | EACH | 6 | $597.00 | $200.00 |
| 19 | Distribution cable removed (625E75550) | FT | 1,493 | $0.60 | $1.00 |
| 20 | Disconnect circuit (625E75800) | EACH | 2 | $199.00 | $125.00 |
| 21 | Vehicular signal head, optically programmed, 3-section, 12" lens, 1-way, as per plan (632E03201) | EACH | 4 | $5,232.00 | $6,600.00 |
| 22 | Vehicular signal head, misc.:removal (632E04000) | EACH | 322 | $99.50 | $50.00 |
| 23 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 279 | $989.10 | $1,300.00 |
| 24 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 28 | $859.60 | $1,000.00 |
| 25 | Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064) | EACH | 2 | $1,153.00 | $1,400.00 |
| 26 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 23 | $1,642.50 | $2,000.00 |
| 27 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 4 | $1,519.50 | $1,800.00 |
| 28 | Messenger wire, misc.: unlash and relash (632E30500) | FT | 903 | $3.97 | $5.00 |
| 29 | Signal cable, 5 conductor, no. 14 AWG, as per plan (632E40501) | FT | 2,881 | $3.46 | $3.00 |
| 30 | Power cable, 1 conductor, no. 6 AWG (632E68100) | FT | 317 | $3.07 | $22.00 |
| 31 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,197.00 | $556.00 |
| 32 | Uninterruptible power supply (UPS), battery replacement (633E67500) | EACH | 4 | $1,995.00 | $1,900.00 |
| 33 | Advance radar detection, as per plan (809E69001) | EACH | 1 | $10,445 | $15,000 |
| 34 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $10,145 | $16,000 |
| 35 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $100.00 | $75.00 |
| 36 | Special - railroad coordination (900E17000) | LS | 1 | $500.00 | $1,500.00 |
| 37 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $5,000.00 |
| 38 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,203 | $3,500.00 |
| 39 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $21,600 | $15,000 |
| 40 | Field office, type B (619E16010) | MNTH | 6 | $1,800.00 | $850.00 |
| 41 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $9,290.00 |
| 42 | Mobilization (624E10000) | LS | 1 | $34,500 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.