ODOT contract 260372 bid tabulation

SUM-SR 532-00.80 (SIGNALIZATION). Let by Ohio DOT on August 13, 2026, SUM. 2 bids received; low bid $373,050 by Perram Electric Inc, -3.4% against the engineer's estimate of $386,000.

Owner
Ohio DOT
Letting
13 AUG 2026
Pay items
88
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Perram Electric Inc$373,050Low-3.0%
2TC Randal Construction LLC$379,722+2.0%-2.0%
ODOT contract 260372: bids by rank

Engineer's estimate: $386,000.

Bid tabulation

LinePay itemUnitQuantity1. Perram Electric Inc2. TC Randal Construction LLC
1Clearing and grubbing (201E11000)LS1$5,000.00$5,000.00
2Pavement removed (202E23000)SY25$80.00$90.00
3Walk removed (202E30000)SF100$8.00$10.00
4Pipe removed, 24" and under (202E35100)FT47$19.00$30.00
5Manhole removed (202E58000)EACH1$1,050.00$750.00
6Inlet removed (202E58200)EACH1$1,000.00$725.00
7Removal misc.: inspection well (202E98100)EACH1$900.00$300.00
8Removal misc.: conduit (202E98200)FT5$19.00$65.00
9Embankment, as per plan (203E20001)CY50$105.00$30.00
10Roadway, misc.: pre-construction video (203E98500)LS1$1,500.00$1,000.00
11Subgrade compaction (204E10000)SY31$5.00$10.00
124" concrete walk (608E10000)SF510$29.80$36.00
13Curb ramp (608E52000)SF369$20.00$50.00
14Special - as-built construction plans (690E91000)LS1$2,500.00$1,750.00
15Special - survey control verification (690E98400)LS1$1,560.00$2,000.00
16Soil analysis test (659E00100)EACH2$200.00$150.00
17Topsoil (659E00300)CY26$105.00$100.00
18Seeding and mulching (659E10000)SY230$5.00$12.50
19Commercial fertilizer (659E20000)TON0.03$1,500.00$1,000.00
20Lime (659E31000)ACRE0.05$1,000.00$100.00
21Water (659E35000)MGAL2$50.00$10.00
22Erosion control (832E30000)EACH5,000$1.00$1.00
234" conduit, type C (611E00200)FT10$30.00$100.00
2412" conduit, type B (611E04400)FT32$115.00$140.00
2515" conduit, type B (611E05900)FT5$150.00$255.00
26Conduit, misc.: type C for drainage discharge cont (611E97400)FT5$34.00$50.00
27Conduit, misc.: type E for drainage discharge cont (611E97400)FT5$30.00$50.00
28Conduit, misc.: type F for drainage discharge cont (611E97400)FT5$30.00$50.00
29Catch basin, no. 3 (611E98150)EACH1$8,000.00$3,750.00
30Manhole, no. 3 (611E99574)EACH1$12,000$3,500.00
31Inspection well (611E99720)EACH1$6,000.00$75.00
32Special - miscellaneous metal (611E99820)LB1,000$3.00$4.50
33Aggregate base (304E20000)CY6$150.00$180.00
346" non-reinforced concrete pavement, class QC MS (452E10050)SY31$139.00$185.00
35Combination curb and gutter, type 2, as per plan (609E12001)FT68$100.00$110.00
36Curb, type 6, as per plan (609E26001)FT87$90.00$80.00
37Valve box adjusted to grade (638E10800)EACH4$1,600.00$200.00
38Manhole adjusted to grade, as per plan (611E99655)EACH1$2,200.00$2,500.00
39Ground mounted support, no. 2 post (630E02100)FT13.10$20.00$20.00
40Sign hanger assembly, mast arm, as per plan (630E79101)EACH3$479.00$630.00
41Sign support assembly, pole mounted (630E79500)EACH2$255.00$160.00
42Sign, flat sheet (630E80100)SF62.40$29.00$25.00
43Removal of ground mounted sign and disposal (630E84900)EACH2$102.50$20.00
44Removal of ground mounted post support and disposal (630E86002)EACH2$102.50$25.00
45Center line (644E00300)MI0.01$28,900$30,000
46Stop line (644E00500)FT42$20.50$22.00
47Crosswalk line, 12" (644E00620)FT133$10.30$12.00
48Removal of pavement marking (644E30000)FT6$280.00$300.00
49Conduit, 2", 725.04 (625E25400)FT97$27.60$17.00
50Conduit, 3", 725.04 (625E25500)FT23$54.00$45.00
51Conduit, 4", 725.04 (625E25600)FT20$90.00$56.00
52Conduit, jacked or drilled, 725.04, 4" (625E25902)FT104$105.50$105.00
53Trench (625E29000)FT130$14.20$9.50
54Pull box, 725.08, 18" (625E30700)EACH2$1,422.50$850.00
55Pull box, 725.08, 24" (625E30706)EACH2$1,575.00$1,000.00
56Ground rod (625E32000)EACH6$330.00$185.00
57Underground warning marking tape (625E36010)FT130$1.25$2.00
58Arc flash calculations and label, traffic signal C (625E76000)EACH1$2,000.00$3,500.00
59Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH6$980.00$1,375.00
60Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH4$530.00$655.00
61Covering of vehicular signal head (632E25000)EACH6$20.00$25.00
62Covering of pedestrian signal head (632E25010)EACH4$10.00$15.00
63Pedestrian pushbutton, as per plan (632E26001)EACH4$350.00$220.00
64Signal cable, 5 conductor, no. 14 AWG (632E40500)FT623$3.60$5.00
65Signal cable, 7 conductor, no. 14 AWG (632E40700)FT139$3.95$15.00
66Signal support foundation, as per plan (632E64011)EACH2$7,332.00$4,700.00
67Pedestal foundation (632E64020)EACH3$1,822.50$500.00
68Test hole performed (632E64950)EACH1$300.00$375.00
69Loop detector lead-in cable (632E65200)FT295$2.70$7.00
70Power cable, 2 conductor, no. 4 AWG (632E69200)FT133$6.45$7.00
71Power service, as per plan (632E70001)EACH1$2,730.00$2,500.00
72Conduit riser, 2" diameter (632E70400)EACH1$1,115.00$575.00
73Signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 4 and design 4, as per plan (632E71225)EACH1$19,230$25,200
74Signal support, type TC-81.22, design 4, as per plan (632E72111)EACH1$12,732$14,000
75Pedestal, 10.7' tall, transformer base (632E89920)EACH3$2,084.00$1,500.00
76Removal of traffic signal installation, as per plan (632E90101)EACH1$2,255.00$5,500.00
77Cabinet, type TS-2, as per plan (633E65511)EACH1$17,590$17,500
78Cabinet foundation, as per plan (633E67101)EACH1$3,650.00$2,200.00
79Controller work pad, as per plan (633E67201)EACH1$915.00$300.00
80Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH1$5,978.00$5,400.00
81Atc controller, as per plan (809E69123)EACH1$4,740.00$5,000.00
82Video detection system, as per plan (816E30001)EACH1$26,470$27,000
83Law enforcement officer with patrol car for assistance (614E11110)HR50$120.00$100.00
84Premium for contract performance bond and for payment bond (103E05000)LS1$6,277.10$11,000
85Maintaining traffic (614E11000)LS1$28,000$25,000
86Field office, type B (619E16010)MNTH12$1,500.00$1,000.00
87Construction layout stakes and surveying (623E10000)LS1$4,480.00$12,500
88Mobilization (624E10000)LS1$17,500$30,000
ODOT contract 260372: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy