ODOT contract 250244 bid tabulation
D03-TSG FY2025(B) (SIGNALIZATION). Let by Ohio DOT on May 8, 2025, District 3. 3 bids received; low bid $1,247,324 by Cornerstone Electric Inc, -11% against the engineer's estimate of $1,408,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 100
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Electric Inc | $1,247,324 | Low | -11% |
| 2 | Perram Electric Inc | $1,251,222 | 0.0% | -11% |
| 3 | Miller Cable Company | $1,326,265 | +6.0% | -6.0% |
Engineer's estimate: $1,408,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cornerstone Electric Inc | 2. Perram Electric Inc | 3. Miller Cable Company |
|---|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 1,126 | $3.50 | $8.75 | $8.75 |
| 2 | Curb removed (202E32000) | FT | 257 | $17.50 | $20.00 | $20.00 |
| 3 | Embankment (203E20000) | CY | 8 | $500.00 | $150.00 | $150.00 |
| 4 | Embankment, as per plan (203E20001) | CY | 1 | $2,200.00 | $300.00 | $300.00 |
| 5 | Aggregate base (304E20000) | CY | 3 | $800.00 | $200.00 | $200.00 |
| 6 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E10501) | CY | 3 | $4,150.00 | $895.00 | $7,000.00 |
| 7 | Concrete masonry (602E20000) | CY | 1 | $3,150.00 | $3,800.00 | $3,800.00 |
| 8 | 4" concrete walk (608E10000) | SF | 428 | $16.25 | $18.00 | $18.00 |
| 9 | Curb ramp (608E52000) | SF | 1,221 | $19.25 | $18.00 | $18.00 |
| 10 | Combination curb and gutter, type 2 (609E12000) | FT | 21 | $130.75 | $54.00 | $54.00 |
| 11 | Curb, type 6 (609E26000) | FT | 153 | $42.50 | $49.00 | $49.00 |
| 12 | Curb, type 7 (609E28000) | FT | 126 | $50.75 | $54.00 | $54.00 |
| 13 | 4" concrete traffic island (609E50000) | SY | 67 | $220.50 | $111.00 | $111.00 |
| 14 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $4,000.00 | $2,400.00 | $2,840.00 |
| 15 | Post construction survey monument verification and report (623E51000) | LS | 1 | $4,000.00 | $2,400.00 | $2,840.00 |
| 16 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 |
| 17 | 4" conduit, type E (611E00400) | FT | 320 | $5.00 | $8.45 | $4.00 |
| 18 | 12" conduit, type D (611E04900) | FT | 16 | $108.00 | $75.00 | $78.00 |
| 19 | Connection, fused pull apart (625E00450) | EACH | 22 | $150.00 | $165.00 | $110.00 |
| 20 | Connection, unfused pull apart (625E00460) | EACH | 51 | $150.00 | $155.05 | $110.00 |
| 21 | Light pole, conventional, AT8B30 (625E10490) | EACH | 1 | $3,000.00 | $2,890.00 | $3,000.00 |
| 22 | Light pole, conventional, ATON14 (post top) (625E10490) | EACH | 1 | $2,000.00 | $1,985.00 | $2,100.00 |
| 23 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 4 | $1,800.00 | $1,540.00 | $1,650.00 |
| 24 | Bracket arm, 10' (625E18000) | EACH | 2 | $1,200.00 | $1,015.00 | $625.00 |
| 25 | Bracket arm, 12' (625E18100) | EACH | 1 | $1,250.00 | $1,060.00 | $675.00 |
| 26 | Bracket arm, 15' (625E18200) | EACH | 2 | $1,500.00 | $1,155.00 | $950.00 |
| 27 | Bracket arm, 20' (625E18400) | EACH | 2 | $1,800.00 | $1,550.00 | $1,150.00 |
| 28 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 3,798 | $3.00 | $3.31 | $3.90 |
| 29 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,335 | $1.50 | $1.23 | $1.50 |
| 30 | Luminaire, conventional, solid state (LED), ies-II (625E26252) | EACH | 9 | $450.00 | $460.00 | $450.00 |
| 31 | Luminaire, post top, solid state (LED), as per plan (625E27403) | EACH | 2 | $1,650.00 | $1,340.00 | $1,050.00 |
| 32 | Glare shield (625E28000) | EACH | 1 | $100.00 | $270.00 | $125.00 |
| 33 | Light pole, decorative (625E10480) | EACH | 1 | $4,200.00 | $3,860.00 | $4,050.00 |
| 34 | Light pole, decorative (625E10480) | EACH | 1 | $3,000.00 | $2,875.00 | $3,200.00 |
| 37 | Sign support assembly, pole mounted (630E79500) | EACH | 22 | $86.00 | $18.00 | $86.00 |
| 38 | Sign, flat sheet (630E80100) | SF | 22 | $45.00 | $110.00 | $45.00 |
| 39 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $87.00 | $395.00 | $87.00 |
| 40 | Stop line, type 1 (642E00500) | FT | 34 | $10.65 | $10.65 | $10.65 |
| 41 | Crosswalk line, 12", type 1 (642E00620) | FT | 561 | $4.00 | $4.00 | $4.00 |
| 42 | Removal of pavement marking (642E30000) | FT | 668 | $4.85 | $4.85 | $4.85 |
| 43 | Conduit, 2", 725.04 (625E25400) | FT | 133 | $15.00 | $19.20 | $18.00 |
| 44 | Conduit, 3", 725.04 (625E25500) | FT | 181 | $20.00 | $34.50 | $28.00 |
| 45 | Conduit, 4", 725.04 (625E25600) | FT | 88 | $50.00 | $50.25 | $48.00 |
| 46 | Conduit, jacked or drilled, 725.04, 2" (625E25902) | FT | 264 | $50.00 | $42.25 | $37.00 |
| 47 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 166 | $60.00 | $54.20 | $48.00 |
| 48 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 321 | $75.00 | $91.45 | $70.00 |
| 49 | Trench (625E29000) | FT | 391 | $10.00 | $13.65 | $12.00 |
| 50 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,250.00 | $1,300.00 | $995.00 |
| 51 | Pull box, 725.08, 24" (625E30706) | EACH | 13 | $1,500.00 | $1,500.00 | $1,250.00 |
| 52 | Ground rod (625E32000) | EACH | 26 | $200.00 | $323.00 | $265.00 |
| 53 | Underground warning marking tape (625E36010) | FT | 391 | $1.50 | $1.75 | $3.00 |
| 54 | Special - maintain existing lighting (625E40000) | LS | 1 | $1,000.00 | $100.00 | $15,500 |
| 55 | Arc flash calculations and label , power service (625E76000) | EACH | 4 | $500.00 | $1,500.00 | $3,450.00 |
| 56 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 32 | $900.00 | $940.00 | $1,375.00 |
| 57 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 2 | $1,600.00 | $1,760.00 | $2,225.00 |
| 58 | Pedestrian signal head (LED), type D2, countdown (632E20730) | EACH | 22 | $650.00 | $580.00 | $785.00 |
| 59 | Accessible pedestrian pushbutton (632E20750) | EACH | 22 | $800.00 | $821.00 | $875.00 |
| 60 | Covering of vehicular signal head (632E25000) | EACH | 34 | $10.00 | $10.00 | $40.00 |
| 61 | Covering of pedestrian signal head (632E25010) | EACH | 22 | $10.00 | $5.00 | $30.00 |
| 62 | Messenger wire, 7 strand, 3/8" diameter with accessories (632E30200) | FT | 342 | $15.00 | $15.15 | $20.00 |
| 63 | Messenger wire, misc.: unlash and relash (632E30500) | FT | 100 | $6.00 | $9.90 | $4.25 |
| 64 | Tether wire, with accessories (632E30600) | FT | 342 | $15.00 | $18.10 | $20.00 |
| 65 | Signal cable, 2 conductor, no. 14 AWG (632E40200) | FT | 2,970 | $2.50 | $2.58 | $1.80 |
| 66 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 4,329 | $3.00 | $2.89 | $2.70 |
| 67 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,016 | $3.25 | $3.15 | $2.90 |
| 68 | Signal support foundation (632E64010) | EACH | 11 | $8,000.00 | $7,580.00 | $7,050.00 |
| 69 | Pedestal foundation (632E64020) | EACH | 20 | $1,000.00 | $1,395.00 | $950.00 |
| 70 | Test hole performed (632E64950) | EACH | 2 | $1,000.00 | $395.00 | $300.00 |
| 71 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 217 | $6.00 | $8.70 | $7.50 |
| 72 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 194 | $6.00 | $7.60 | $8.00 |
| 73 | Power service, as per plan (632E70001) | EACH | 4 | $2,500.00 | $3,960.00 | $2,850.00 |
| 74 | Conduit riser, 2" diameter (632E70400) | EACH | 4 | $750.00 | $685.00 | $625.00 |
| 75 | Combination signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 12 and design 2 (632E78240) | EACH | 1 | $19,500 | $19,730 | $19,800 |
| 76 | Combination signal support, type TC-12.31 design 1 (632E78360) | EACH | 1 | $27,000 | $25,575 | $30,700 |
| 77 | Combination signal support, type TC-12.31 design 1 (632E78364) | EACH | 2 | $27,500 | $26,135 | $30,250 |
| 78 | Combination signal support, type TC-12.31 design 1 (632E78368) | EACH | 1 | $26,800 | $26,410 | $33,700 |
| 79 | Combination signal support, type TC-81.22, design 4 (632E79110) | EACH | 1 | $11,500 | $11,545 | $11,000 |
| 80 | Combination signal support, type TC-81.22, design 13 (632E79140) | EACH | 1 | $18,000 | $17,120 | $19,200 |
| 81 | Strain pole, type TC-81.11, design 10 (632E86130) | EACH | 4 | $10,500 | $9,630.00 | $10,100 |
| 82 | Pedestal, 8', transformer base (632E89900) | EACH | 20 | $900.00 | $1,019.00 | $600.00 |
| 83 | Removal of traffic signal installation (632E90100) | EACH | 4 | $3,000.00 | $1,890.00 | $3,250.00 |
| 84 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 4 | $16,650 | $15,860 | $17,950 |
| 85 | Cabinet foundation (633E67100) | EACH | 4 | $2,000.00 | $3,340.00 | $2,600.00 |
| 86 | Controller work pad (633E67200) | EACH | 4 | $1,000.00 | $865.00 | $850.00 |
| 87 | Uninterruptible power supply (UPS), 1000 watt (633E75000) | EACH | 4 | $7,500.00 | $7,192.00 | $7,075.00 |
| 88 | Controller item, misc.: communications (633E99000) | EACH | 4 | $2,000.00 | $1,927.00 | $2,275.00 |
| 89 | Advance radar detection, as per plan (809E69001) | EACH | 16 | $8,600.00 | $8,455.00 | $9,850.00 |
| 90 | Stop line radar detection, as per plan (809E69101) | EACH | 16 | $8,400.00 | $8,420.00 | $9,550.00 |
| 91 | Atc controller, as per plan (809E69123) | EACH | 4 | $500.00 | $550.00 | $995.00 |
| 92 | Emergency vehicle preemption (809E69200) | EACH | 2 | $5,500.00 | $5,135.00 | $750.00 |
| 93 | Preempt receiving unit (809E69210) | EACH | 8 | $1,000.00 | $855.00 | $1,300.00 |
| 94 | Preempt detector cable (809E69220) | FT | 1,212 | $2.00 | $2.40 | $3.39 |
| 95 | Preempt phase selector (809E69230) | EACH | 2 | $5,000.00 | $3,500.00 | $4,925.00 |
| 96 | Preempt confirmation light (809E69240) | EACH | 8 | $600.00 | $930.00 | $585.00 |
| 97 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $70.00 | $85.00 | $75.00 |
| 98 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,000 | $16,523 | $6,200.00 |
| 99 | Maintaining traffic (614E11000) | LS | 1 | $20,000 | $17,375 | $14,000 |
| 100 | Field office, type B (619E16010) | MNTH | 16 | $800.00 | $1,200.00 | $800.00 |
| 101 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,000 | $8,100.00 | $17,000 |
| 102 | Mobilization (624E10000) | LS | 1 | $30,000 | $40,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.