MAH-SR 7-10.25 (INTERSECTION). Let by Ohio DOT on May 8, 2025, MAH. 2 bids received; low bid $527,294 by Cornerstone Electric Inc, -1.1% against the engineer's estimate of $533,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 100
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Electric Inc | $527,294 | Low | -1.0% |
| 2 | S E T Inc | $688,854 | +31% | +29% |
Engineer's estimate: $533,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cornerstone Electric Inc | 2. S E T Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,000.00 | $4,000.00 |
| 2 | Pavement removed (202E23000) | SY | 409 | $30.00 | $20.00 |
| 3 | Walk removed (202E30000) | SF | 286 | $4.00 | $5.00 |
| 4 | Curb removed (202E32000) | FT | 210 | $5.50 | $7.00 |
| 5 | Curb removed, as per plan (202E32001) | FT | 66 | $47.00 | $13.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 6 | $56.00 | $70.00 |
| 7 | Catch basin removed (202E58100) | EACH | 1 | $335.00 | $1,000.00 |
| 8 | Removal misc.: drive removed (202E98300) | SY | 27 | $90.00 | $20.00 |
| 9 | Embankment (203E20000) | CY | 85 | $58.00 | $35.00 |
| 10 | 4" concrete walk (608E10000) | SF | 408 | $15.00 | $23.00 |
| 11 | Curb ramp (608E52000) | SF | 201 | $23.00 | $30.00 |
| 12 | Curb ramp, as per plan (608E52001) | SF | 55 | $38.00 | $31.00 |
| 13 | Special - as-built construction plans (690E91000) | LS | 1 | $500.00 | $5,000.00 |
| 14 | Special - survey control verification (690E98400) | LS | 1 | $500.00 | $2,000.00 |
| 15 | Topsoil (659E00300) | CY | 36 | $160.00 | $80.00 |
| 16 | Seeding and mulching (659E10000) | SY | 325 | $2.00 | $6.00 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.04 | $1,000.00 | $3,000.00 |
| 18 | Lime (659E31000) | ACRE | 0.07 | $1,000.00 | $1,500.00 |
| 19 | Water (659E35000) | MGAL | 2 | $100.00 | $100.00 |
| 20 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 |
| 21 | 4" unclassified pipe underdrains (605E05200) | FT | 100 | $30.00 | $20.00 |
| 22 | 4" conduit, type F (611E00406) | FT | 10 | $55.00 | $50.00 |
| 23 | 12" conduit, type B (611E04400) | FT | 6 | $265.00 | $250.00 |
| 24 | Catch basin, no. 3A (611E98180) | EACH | 1 | $3,600.00 | $4,000.00 |
| 25 | Pavement repair (253E01000) | SY | 1 | $2,700.00 | $250.00 |
| 26 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 18 | $850.00 | $650.00 |
| 27 | Aggregate base (304E20000) | CY | 12 | $350.00 | $100.00 |
| 28 | Non-tracking tack coat (407E20000) | GAL | 4 | $3.05 | $10.00 |
| 29 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 6 | $2,500.00 | $4,000.00 |
| 30 | Curb, type 6 (609E26000) | FT | 221 | $59.00 | $42.00 |
| 31 | Valve box adjusted to grade (638E10800) | EACH | 1 | $500.00 | $1,000.00 |
| 32 | Ground mounted support, no. 2 post (630E02100) | FT | 49 | $12.00 | $13.00 |
| 33 | Sign post reflector (630E08600) | EACH | 4 | $50.00 | $60.00 |
| 34 | Sign, flat sheet (630E80100) | SF | 15.30 | $28.00 | $30.00 |
| 35 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $20.00 | $25.00 |
| 36 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $20.00 | $25.00 |
| 37 | Channelizing line, 8" (646E10300) | FT | 28 | $14.00 | $15.00 |
| 38 | Stop line (646E10400) | FT | 122 | $12.00 | $13.00 |
| 39 | Crosswalk line, 24" (646E10520) | FT | 344 | $12.00 | $13.00 |
| 40 | Removal of pavement marking (646E50100) | FT | 350 | $15.50 | $16.00 |
| 41 | Conduit, 2", 725.04 (625E25400) | FT | 87 | $15.00 | $20.00 |
| 42 | Conduit, 3", 725.04 (625E25500) | FT | 68 | $20.00 | $40.00 |
| 43 | Conduit, 4", 725.04 (625E25600) | FT | 121 | $35.00 | $50.00 |
| 44 | Conduit, jacked or drilled, 4", 725.04 (625E25900) | FT | 133 | $75.00 | $85.00 |
| 45 | Trench (625E29000) | FT | 166 | $10.00 | $20.00 |
| 46 | Trench in paved area (625E29400) | FT | 96 | $75.00 | $120.00 |
| 47 | Pull box, 725.08, 18" (625E30700) | EACH | 5 | $1,200.00 | $900.00 |
| 48 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,500.00 | $1,350.00 |
| 49 | Pull box removed (625E31510) | EACH | 3 | $200.00 | $100.00 |
| 50 | Ground rod (625E32000) | EACH | 8 | $200.00 | $250.00 |
| 51 | Underground warning/marking tape, as per plan (625E36011) | FT | 262 | $1.25 | $1.00 |
| 52 | Arc flash calculations and label (SR-7 & shields R (625E76000) | EACH | 1 | $500.00 | $1,000.00 |
| 53 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 6 | $900.00 | $1,050.00 |
| 54 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 4 | $1,600.00 | $1,850.00 |
| 55 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $750.00 | $750.00 |
| 56 | Accessible pedestrian pushbutton (632E20750) | EACH | 6 | $800.00 | $1,000.00 |
| 57 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 2 | $900.00 | $1,100.00 |
| 58 | Covering of vehicular signal head (632E25000) | EACH | 10 | $10.00 | $55.00 |
| 59 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $10.00 | $40.00 |
| 60 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,313 | $3.00 | $3.00 |
| 61 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 1,239 | $3.25 | $3.50 |
| 62 | Signal support foundation (632E64010) | EACH | 3 | $8,000.00 | $8,000.00 |
| 63 | Pedestal foundation (632E64020) | EACH | 3 | $1,000.00 | $1,100.00 |
| 64 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 1,281 | $2.50 | $2.00 |
| 65 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 107 | $6.00 | $7.00 |
| 66 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 81 | $6.00 | $7.00 |
| 67 | Power service (632E70000) | EACH | 1 | $2,500.00 | $4,000.00 |
| 68 | Signal support, type TC-12.31 design 10 pole, with mast arms TC-81.22 design 13 and design 13 (632E71372) | EACH | 1 | $31,500 | $40,000 |
| 69 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $10,500 | $12,000 |
| 70 | Signal support, type TC-81.22, design 14 (632E72150) | EACH | 1 | $19,000 | $22,000 |
| 71 | Pedestal, 8', transformer base (632E89900) | EACH | 3 | $1,000.00 | $800.00 |
| 72 | Removal of traffic signal installation (632E90100) | EACH | 1 | $3,000.00 | $7,000.00 |
| 73 | Reuse of traffic control item: modem (632E90104) | EACH | 1 | $100.00 | $450.00 |
| 74 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $16,000 | $21,000 |
| 75 | Cabinet foundation, as per plan (633E67101) | EACH | 1 | $2,000.00 | $2,800.00 |
| 76 | Controller work pad, as per plan (633E67201) | EACH | 1 | $1,000.00 | $750.00 |
| 77 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $5,500.00 | $6,000.00 |
| 78 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $8,700.00 | $10,000 |
| 79 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,200.00 | $10,000 |
| 80 | Atc controller, as per plan (809E69123) | EACH | 1 | $4,700.00 | $6,500.00 |
| 81 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $75.00 | $90.00 |
| 82 | Special - work zone traffic signal (614E11300) | EACH | 1 | $15,000 | $35,000 |
| 83 | Water (616E10000) | MGAL | 1 | $100.00 | $150.00 |
| 84 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $15,000 | $5,000.00 |
| 85 | Unclassified excavation, as per plan (503E21101) | CY | 11 | $350.00 | $225.00 |
| 86 | Epoxy coated steel reinforcement (509E10000) | LB | 138 | $15.00 | $20.00 |
| 87 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 16 | $90.00 | $50.00 |
| 88 | Class QC1 concrete, culvert (511E47010) | CY | 1 | $18,000 | $6,000.00 |
| 89 | Type 2 waterproofing (512E33000) | SY | 6 | $168.00 | $65.00 |
| 90 | Manhole frame and cover, as per plan (611E99651) | EACH | 1 | $2,000.00 | $2,500.00 |
| 91 | Manhole, misc.: manhole steps (611E99690) | EACH | 8 | $125.00 | $300.00 |
| 92 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $7,500.00 |
| 93 | Maintaining traffic (614E11000) | LS | 1 | $20,500 | $90,000 |
| 94 | Field office, type B (619E16010) | MNTH | 12 | $1,000.00 | $2,200.00 |
| 95 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,500.00 | $13,000 |
| 96 | Mobilization (624E10000) | LS | 1 | $30,000 | $40,000 |
| 100 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,600.00 | $2,500.00 |
| 101 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 6 | $21.00 | $20.00 |
| 102 | Object marker, two way (614E13360) | EACH | 6 | $30.00 | $60.00 |
| 103 | Portable barrier, unanchored (622E41100) | FT | 250 | $63.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.