ODOT contract 250256 bid tabulation

MAH-SR 7-10.25 (INTERSECTION). Let by Ohio DOT on May 8, 2025, MAH. 2 bids received; low bid $527,294 by Cornerstone Electric Inc, -1.1% against the engineer's estimate of $533,000.

Owner
Ohio DOT
Letting
08 MAY 2025
Pay items
100
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Cornerstone Electric Inc$527,294Low-1.0%
2S E T Inc$688,854+31%+29%
ODOT contract 250256: bids by rank

Engineer's estimate: $533,000.

Bid tabulation

LinePay itemUnitQuantity1. Cornerstone Electric Inc2. S E T Inc
1Clearing and grubbing (201E11000)LS1$1,000.00$4,000.00
2Pavement removed (202E23000)SY409$30.00$20.00
3Walk removed (202E30000)SF286$4.00$5.00
4Curb removed (202E32000)FT210$5.50$7.00
5Curb removed, as per plan (202E32001)FT66$47.00$13.00
6Pipe removed, 24" and under (202E35100)FT6$56.00$70.00
7Catch basin removed (202E58100)EACH1$335.00$1,000.00
8Removal misc.: drive removed (202E98300)SY27$90.00$20.00
9Embankment (203E20000)CY85$58.00$35.00
104" concrete walk (608E10000)SF408$15.00$23.00
11Curb ramp (608E52000)SF201$23.00$30.00
12Curb ramp, as per plan (608E52001)SF55$38.00$31.00
13Special - as-built construction plans (690E91000)LS1$500.00$5,000.00
14Special - survey control verification (690E98400)LS1$500.00$2,000.00
15Topsoil (659E00300)CY36$160.00$80.00
16Seeding and mulching (659E10000)SY325$2.00$6.00
17Commercial fertilizer (659E20000)TON0.04$1,000.00$3,000.00
18Lime (659E31000)ACRE0.07$1,000.00$1,500.00
19Water (659E35000)MGAL2$100.00$100.00
20Erosion control (832E30000)EACH2,000$1.00$1.00
214" unclassified pipe underdrains (605E05200)FT100$30.00$20.00
224" conduit, type F (611E00406)FT10$55.00$50.00
2312" conduit, type B (611E04400)FT6$265.00$250.00
24Catch basin, no. 3A (611E98180)EACH1$3,600.00$4,000.00
25Pavement repair (253E01000)SY1$2,700.00$250.00
26Asphalt concrete base, PG64-22, (449) (301E56000)CY18$850.00$650.00
27Aggregate base (304E20000)CY12$350.00$100.00
28Non-tracking tack coat (407E20000)GAL4$3.05$10.00
29Asphalt concrete surface course, type 1, (449), as per plan (441E70101)CY6$2,500.00$4,000.00
30Curb, type 6 (609E26000)FT221$59.00$42.00
31Valve box adjusted to grade (638E10800)EACH1$500.00$1,000.00
32Ground mounted support, no. 2 post (630E02100)FT49$12.00$13.00
33Sign post reflector (630E08600)EACH4$50.00$60.00
34Sign, flat sheet (630E80100)SF15.30$28.00$30.00
35Removal of ground mounted sign and disposal (630E84900)EACH2$20.00$25.00
36Removal of ground mounted post support and disposal (630E86002)EACH1$20.00$25.00
37Channelizing line, 8" (646E10300)FT28$14.00$15.00
38Stop line (646E10400)FT122$12.00$13.00
39Crosswalk line, 24" (646E10520)FT344$12.00$13.00
40Removal of pavement marking (646E50100)FT350$15.50$16.00
41Conduit, 2", 725.04 (625E25400)FT87$15.00$20.00
42Conduit, 3", 725.04 (625E25500)FT68$20.00$40.00
43Conduit, 4", 725.04 (625E25600)FT121$35.00$50.00
44Conduit, jacked or drilled, 4", 725.04 (625E25900)FT133$75.00$85.00
45Trench (625E29000)FT166$10.00$20.00
46Trench in paved area (625E29400)FT96$75.00$120.00
47Pull box, 725.08, 18" (625E30700)EACH5$1,200.00$900.00
48Pull box, 725.08, 24" (625E30706)EACH1$1,500.00$1,350.00
49Pull box removed (625E31510)EACH3$200.00$100.00
50Ground rod (625E32000)EACH8$200.00$250.00
51Underground warning/marking tape, as per plan (625E36011)FT262$1.25$1.00
52Arc flash calculations and label (SR-7 & shields R (625E76000)EACH1$500.00$1,000.00
53Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH6$900.00$1,050.00
54Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086)EACH4$1,600.00$1,850.00
55Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH8$750.00$750.00
56Accessible pedestrian pushbutton (632E20750)EACH6$800.00$1,000.00
57Accessible pedestrian pushbutton, as per plan (632E20751)EACH2$900.00$1,100.00
58Covering of vehicular signal head (632E25000)EACH10$10.00$55.00
59Covering of pedestrian signal head (632E25010)EACH8$10.00$40.00
60Signal cable, 5 conductor, no. 14 AWG (632E40500)FT1,313$3.00$3.00
61Signal cable, 7 conductor, no. 14 AWG (632E40700)FT1,239$3.25$3.50
62Signal support foundation (632E64010)EACH3$8,000.00$8,000.00
63Pedestal foundation (632E64020)EACH3$1,000.00$1,100.00
64Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300)FT1,281$2.50$2.00
65Power cable, 2 conductor, no. 6 AWG (632E68200)FT107$6.00$7.00
66Service cable, 3 conductor, no. 6 AWG (632E69800)FT81$6.00$7.00
67Power service (632E70000)EACH1$2,500.00$4,000.00
68Signal support, type TC-12.31 design 10 pole, with mast arms TC-81.22 design 13 and design 13 (632E71372)EACH1$31,500$40,000
69Signal support, type TC-81.22, design 4 (632E72110)EACH1$10,500$12,000
70Signal support, type TC-81.22, design 14 (632E72150)EACH1$19,000$22,000
71Pedestal, 8', transformer base (632E89900)EACH3$1,000.00$800.00
72Removal of traffic signal installation (632E90100)EACH1$3,000.00$7,000.00
73Reuse of traffic control item: modem (632E90104)EACH1$100.00$450.00
74Cabinet, type TS-2, as per plan (633E65511)EACH1$16,000$21,000
75Cabinet foundation, as per plan (633E67101)EACH1$2,000.00$2,800.00
76Controller work pad, as per plan (633E67201)EACH1$1,000.00$750.00
77Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH1$5,500.00$6,000.00
78Advance radar detection, as per plan (809E69001)EACH2$8,700.00$10,000
79Stop line radar detection, as per plan (809E69101)EACH4$8,200.00$10,000
80Atc controller, as per plan (809E69123)EACH1$4,700.00$6,500.00
81Law enforcement officer with patrol car for assistance (614E11110)HR40$75.00$90.00
82Special - work zone traffic signal (614E11300)EACH1$15,000$35,000
83Water (616E10000)MGAL1$100.00$150.00
84Portions of structure removed, as per plan (202E11201)LS1$15,000$5,000.00
85Unclassified excavation, as per plan (503E21101)CY11$350.00$225.00
86Epoxy coated steel reinforcement (509E10000)LB138$15.00$20.00
87Dowel holes with nonshrink, nonmetallic grout (510E10000)EACH16$90.00$50.00
88Class QC1 concrete, culvert (511E47010)CY1$18,000$6,000.00
89Type 2 waterproofing (512E33000)SY6$168.00$65.00
90Manhole frame and cover, as per plan (611E99651)EACH1$2,000.00$2,500.00
91Manhole, misc.: manhole steps (611E99690)EACH8$125.00$300.00
92Premium for contract performance bond and for payment bond (103E05000)LS1$5,000.00$7,500.00
93Maintaining traffic (614E11000)LS1$20,500$90,000
94Field office, type B (619E16010)MNTH12$1,000.00$2,200.00
95Construction layout stakes and surveying (623E10000)LS1$5,500.00$13,000
96Mobilization (624E10000)LS1$30,000$40,000
100Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH2$2,600.00$2,500.00
101Barrier reflector, type 1, bidirectional (614E13310)EACH6$21.00$20.00
102Object marker, two way (614E13360)EACH6$30.00$60.00
103Portable barrier, unanchored (622E41100)FT250$63.00$100.00
ODOT contract 250256: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy