ODOT contract 264018 bid tabulation
MRG-SR 669-02.09 (CULVERT REPLACEMENT). Let by Ohio DOT on July 16, 2026, MRG. 4 bids received; low bid $368,465 by Alan Stone Co Inc, +1.8% against the engineer's estimate of $362,000.
- Owner
- Ohio DOT
- Letting
- 16 JUL 2026
- Pay items
- 44
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $368,465 | Low | +2.0% |
| 2 | Buds Inc | $406,919 | +10% | +12% |
| 3 | Parker Corporation | $427,810 | +16% | +18% |
| 4 | Axis Civil Construction LLC | $436,618 | +18% | +21% |
Engineer's estimate: $362,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Buds Inc | 3. Parker Corporation | 4. Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $20,000 | $10,000 | $26,500 | $10,000 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $2,000.00 | $1,000.00 | $1,000.00 | $1,900.00 |
| 3 | Pipe removed, over 24" diameter (202E35200) | FT | 71 | $100.00 | $100.00 | $125.00 | $118.00 |
| 4 | Guardrail removed (202E38000) | FT | 271 | $4.00 | $5.00 | $2.00 | $8.00 |
| 5 | Fence removed (202E75000) | FT | 222 | $4.00 | $5.00 | $2.00 | $10.00 |
| 6 | Excavation (203E10000) | CY | 193 | $40.00 | $50.00 | $20.00 | $45.00 |
| 7 | Embankment (203E20000) | CY | 172 | $80.00 | $50.00 | $20.00 | $45.00 |
| 8 | Subgrade compaction (204E10000) | SY | 278 | $10.00 | $5.00 | $0.50 | $4.00 |
| 9 | Preparing subgrade for shoulder paving (209E72000) | STA | 5 | $300.00 | $300.00 | $500.00 | $630.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 237.50 | $35.00 | $31.00 | $30.10 | $30.10 |
| 11 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $2,100.00 | $1,900.00 | $1,800.00 | $1,800.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,500.00 | $1,300.00 | $1,200.00 | $1,200.00 |
| 13 | Fence, misc.: fence 607.08 (607E98000) | FT | 280 | $30.00 | $40.00 | $29.75 | $29.75 |
| 14 | Rock channel protection, type B with filter (601E32100) | CY | 109 | $135.00 | $145.00 | $65.00 | $150.00 |
| 15 | Seeding and mulching (659E10000) | SY | 842 | $3.00 | $4.00 | $1.00 | $3.60 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.08 | $700.00 | $1,300.00 | $3,125.00 | $1,250.00 |
| 17 | Lime (659E31000) | ACRE | 0.18 | $800.00 | $0.50 | $1,390.00 | $150.00 |
| 18 | Water (659E35000) | MGAL | 3 | $1.00 | $1.00 | $0.50 | $1.00 |
| 19 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 20 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $10,000 | $6,000.00 | $1,000.00 | $12,000 |
| 21 | Unclassified excavation, including rock (503E21320) | LS | 1 | $8,000.00 | $10,000 | $35,000 | $15,000 |
| 22 | Concrete masonry (602E20000) | CY | 23.40 | $1,000.00 | $2,300.00 | $1,000.00 | $1,750.00 |
| 23 | Aggregate drains (605E31100) | FT | 54 | $30.00 | $25.00 | $10.00 | $38.00 |
| 24 | Porous backfill with geotextile fabric (518E21200) | CY | 7 | $150.00 | |||
| 25 | 72" conduit, type A, as per plan, 706.02 (611E26001) | FT | 96 | $1,222.22 | |||
| 26 | Low strength mortar backfill (type 2) (613E41300) | CY | 274 | $170.00 | |||
| 27 | Porous backfill with geotextile fabric (518E21200) | CY | 8 | $350.00 | $150.50 | $195.00 | |
| 28 | 72" conduit, type A, as per plan, 707.85 (611E26001) | FT | 96 | $700.00 | $850.00 | $875.00 | |
| 29 | Low strength mortar backfill (type 2) (613E41300) | CY | 246 | $160.00 | $200.00 | $300.00 | |
| 30 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 43 | $380.00 | $470.00 | $491.00 | $400.00 |
| 31 | Aggregate base (304E20000) | CY | 47 | $100.00 | $125.00 | $65.00 | $175.00 |
| 32 | Non-tracking tack coat (407E20000) | GAL | 168 | $4.00 | $4.50 | $4.50 | $6.00 |
| 33 | Prime coat (408E10000) | GAL | 42 | $5.00 | $60.00 | $52.00 | $12.00 |
| 34 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 85 | $380.00 | $350.00 | $356.00 | $490.00 |
| 35 | Compacted aggregate (617E10100) | CY | 8 | $300.00 | $150.00 | $65.00 | $260.00 |
| 36 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 8 | $13.00 | $14.00 | $12.00 | $12.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $90.00 | $55.00 | $75.00 | $250.00 |
| 38 | Removal of ground mounted post support and reerection (630E86010) | EACH | 2 | $60.00 | $250.00 | $50.00 | $250.00 |
| 39 | Edge line, 6", type 1 (642E00104) | MI | 0.12 | $7,000.00 | $6,500.00 | $6,250.00 | $6,250.00 |
| 40 | Center line, type 1 (642E00300) | MI | 0.06 | $12,000 | $13,000 | $12,500 | $12,500 |
| 41 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,000.00 | $5,000.00 | $24,500 | $6,000.00 |
| 42 | Maintaining traffic (614E11000) | LS | 1 | $10,000 | $5,000.00 | $23,000 | $12,000 |
| 43 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,000.00 | $4,500.00 | $23,000 | $9,000.00 |
| 44 | Mobilization (624E10000) | LS | 1 | $34,000 | $8,000.00 | $28,500 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.