ODOT contract 260331 bid tabulation
ROS-US 35-04.48 (FOUR LANE RESURFACING). Let by Ohio DOT on July 16, 2026, ROS. 2 bids received; low bid $3,893,340 by Shelly & Sands Inc, +13% against the engineer's estimate of $3,460,000.
- Owner
- Ohio DOT
- Letting
- 16 JUL 2026
- Pay items
- 67
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $3,893,340 | Low | +13% |
| 2 | Shelly Company | $3,999,453 | +3.0% | +16% |
Engineer's estimate: $3,460,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Shelly Company |
|---|---|---|---|---|---|
| 1 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 1,500 | $125.00 | $131.00 |
| 2 | Pavement planing, asphalt concrete 1.5" (254E01000) | SY | 179,102 | $2.50 | $2.45 |
| 3 | Pavement planing, asphalt concrete, as per plan 1. (254E01001) | SY | 24,785 | $2.50 | $2.90 |
| 4 | Patching planed surface (254E01600) | SY | 36,453 | $5.00 | $5.90 |
| 5 | Tack coat (407E10000) | GAL | 17,859 | $3.50 | $2.50 |
| 6 | Asphalt concrete surface course, 12.5 MM, type A (447), PWL 2025, as per plan (442E10331) | CY | 8,268 | $255.00 | $261.00 |
| 7 | RPM (621E00100) | EACH | 1,072 | $35.45 | $35.45 |
| 8 | Raised pavement marker removed (621E54000) | EACH | 1,072 | $10.00 | $14.50 |
| 9 | Stop line (644E00500) | FT | 204 | $17.80 | $17.80 |
| 10 | Dotted line, 6" (644E01510) | FT | 4,278 | $1.90 | $1.90 |
| 11 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 26.35 | $4,300.00 | $4,300.00 |
| 12 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 11.44 | $1,900.00 | $1,900.00 |
| 13 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 4,141 | $2.00 | $2.00 |
| 14 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 37.79 | $1,500.00 | $1,500.00 |
| 15 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 4,141 | $2.00 | $2.00 |
| 16 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $85.00 | $80.00 |
| 17 | Increased barrier delineation (614E11630) | FT | 320 | $1.00 | $3.60 |
| 18 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,500.00 | $2,950.00 |
| 19 | Work zone increased penalties sign (614E12484) | EACH | 24 | $100.00 | $100.00 |
| 20 | Replacement drum (614E12600) | EACH | 50 | $80.00 | $80.00 |
| 21 | Barrier reflector, type 1, one-way (614E13310) | EACH | 4 | $35.00 | $15.00 |
| 22 | Object marker, one way (614E13350) | EACH | 4 | $35.00 | $25.00 |
| 23 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 22.96 | $180.00 | $180.00 |
| 24 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 46.28 | $470.00 | $470.00 |
| 25 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 6,366 | $0.75 | $0.75 |
| 26 | Work zone stop line, class III, 642 paint (614E26610) | FT | 568 | $3.70 | $3.70 |
| 27 | Portable barrier, unanchored (622E41100) | FT | 320 | $40.00 | $40.00 |
| 28 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 18 | $750.00 | $750.00 |
| 29 | Pavement planing, portland cement CONCRETE3" (254E01010) | SY | 534 | $20.00 | $18.25 |
| 30 | Tack coat (407E10000) | GAL | 48.04 | $3.50 | $2.50 |
| 31 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 43 | $30.00 | $30.00 |
| 32 | Asphalt concrete surface course, 12.5 MM, type A (447), PWL 2025, as per plan (442E10331) | CY | 22.24 | $255.00 | $261.00 |
| 33 | Patching concrete bridge deck - type C (519E12304) | SY | 20 | $800.00 | $800.00 |
| 34 | Bridge deck waterproofing asphalt concrete (856E10000) | CY | 22.24 | $600.00 | $685.00 |
| 35 | Pavement planing, portland cement CONCRETE3" (254E01010) | SY | 534 | $20.00 | $18.25 |
| 36 | Tack coat (407E10000) | GAL | 48.04 | $3.50 | $2.50 |
| 37 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 43 | $30.00 | $30.00 |
| 38 | Asphalt concrete surface course, 12.5 MM, type A (447), PWL 2025, as per plan (442E10331) | CY | 22.24 | $255.00 | $261.00 |
| 39 | Patching concrete bridge deck - type C (519E12304) | SY | 20 | $800.00 | $800.00 |
| 40 | Bridge deck waterproofing asphalt concrete (856E10000) | CY | 22.24 | $600.00 | $685.00 |
| 41 | Pavement planing, portland cement CONCRETE3" (254E01010) | SY | 282 | $20.00 | $18.25 |
| 42 | Tack coat (407E10000) | GAL | 25.39 | $3.50 | $2.50 |
| 43 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 38 | $30.00 | $30.00 |
| 44 | Asphalt concrete surface course, 12.5 MM, type A (447), PWL 2025, as per plan (442E10331) | CY | 11.75 | $255.00 | $261.00 |
| 45 | Patching concrete bridge deck - type C (519E12304) | SY | 20 | $800.00 | $800.00 |
| 46 | Bridge deck waterproofing asphalt concrete (856E10000) | CY | 11.75 | $600.00 | $685.00 |
| 47 | Pavement planing, portland cement CONCRETE3" (254E01010) | SY | 282 | $20.00 | $18.25 |
| 48 | Tack coat (407E10000) | GAL | 25.39 | $3.50 | $2.50 |
| 49 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 38 | $30.00 | $30.00 |
| 50 | Asphalt concrete surface course, 12.5 MM, type A (447), PWL 2025, as per plan (442E10331) | CY | 11.75 | $255.00 | $261.00 |
| 51 | Patching concrete bridge deck - type C (519E12304) | SY | 20 | $800.00 | $800.00 |
| 52 | Bridge deck waterproofing asphalt concrete (856E10000) | CY | 11.75 | $600.00 | $685.00 |
| 53 | Concrete barrier removed (202E30700) | FT | 10 | $200.00 | $350.00 |
| 54 | Guardrail removed (202E38000) | FT | 37.50 | $10.00 | $15.00 |
| 55 | Anchor assembly removed, type B (202E42050) | EACH | 1 | $300.00 | $1,000.00 |
| 56 | Bridge terminal assembly removed (202E47000) | EACH | 1 | $300.00 | $1,000.00 |
| 57 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 8 | $50.00 | $160.00 |
| 58 | Guardrail, type MGS (606E15050) | FT | 37.50 | $65.00 | $65.00 |
| 59 | Anchor assembly, MGS type B (606E26050) | EACH | 1 | $2,700.00 | $2,700.00 |
| 60 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $3,000.00 | $3,000.00 |
| 61 | Concrete barrier end section, type D, as per plan (622E25001) | EACH | 1 | $15,000 | $18,000 |
| 62 | Barrier reflector, type 1, one-way (626E00102) | EACH | 1 | $50.00 | $30.00 |
| 63 | Barrier reflector, type 3, one-way (626E00112) | EACH | 2 | $50.00 | $30.00 |
| 64 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,479 | $8,000.00 |
| 65 | Maintaining traffic (614E11000) | LS | 1 | $147,000 | $140,000 |
| 66 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,600 | $20,000 |
| 67 | Mobilization (624E10000) | LS | 1 | $135,000 | $160,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.