ODOT contract 264015 bid tabulation
WAY-SR 3-04.62/08.55/08.96/11.61 (CULVERT REPLACEMENT). Let by Ohio DOT on May 21, 2026, WAY. 3 bids received; low bid $609,692 by Eius Company, +1.4% against the engineer's estimate of $601,000.
- Owner
- Ohio DOT
- Letting
- 21 MAY 2026
- Pay items
- 82
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eius Company | $609,692 | Low | +1.0% |
| 2 | Crawford Construction Company Inc | $647,464 | +6.0% | +8.0% |
| 3 | Madex Construction Co | $949,438 | +56% | +58% |
Engineer's estimate: $601,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eius Company | 2. Crawford Construction Company Inc | 3. Madex Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,644.00 | $6,800.00 | $19,912 |
| 2 | Pavement removed (202E23000) | SY | 78 | $34.51 | $32.00 | $45.30 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 119 | $6.45 | $57.00 | $43.37 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 45 | $57.33 | $151.00 | $86.85 |
| 5 | Guardrail removed (202E38000) | FT | 162.50 | $2.52 | $42.00 | $17.37 |
| 6 | Anchor assembly removed (202E42206) | EACH | 2 | $152.25 | $460.00 | $578.95 |
| 7 | Catch basin removed (202E58100) | EACH | 1 | $774.00 | $1,500.00 | $1,736.84 |
| 8 | Special - fill and plug existing conduit (202E70000) | FT | 164 | $68.51 | $40.00 | $290.32 |
| 9 | Excavation (203E10000) | CY | 75 | $19.35 | $98.00 | $40.53 |
| 10 | Embankment (203E20000) | CY | 518 | $34.41 | $42.00 | $51.85 |
| 11 | Subgrade compaction (204E10000) | SY | 84 | $6.45 | $3.60 | $8.11 |
| 12 | Guardrail, type 5 (606E13000) | FT | 62.50 | $25.62 | $28.00 | $37.05 |
| 13 | Guardrail, type MGS (606E15050) | FT | 250 | $24.78 | $27.00 | $33.58 |
| 14 | Guardrail, type MGS, 25' long-span (606E17350) | FT | 50 | $32.76 | $36.00 | $39.37 |
| 15 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 2 | $2,856.00 | $3,400.00 | $3,473.68 |
| 16 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,449.00 | $1,600.00 | $1,736.84 |
| 17 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,100.00 | $2,140.00 | $11,526 |
| 18 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,100.00 | $2,140.00 | $9,789.47 |
| 19 | Riprap, type D (601E11000) | SY | 75 | $464.30 | $241.00 | $89.47 |
| 20 | Rock channel protection, type B with filter (601E32100) | CY | 33 | $177.90 | $171.00 | $275.68 |
| 21 | Rock channel protection, type C with filter (601E32200) | CY | 5 | $176.10 | $171.00 | $347.37 |
| 22 | Paved gutter, type 1-2 (601E37500) | FT | 262 | $88.28 | $110.00 | $127.37 |
| 23 | Soil analysis test (659E00100) | EACH | 8 | $105.00 | $25.00 | $87.47 |
| 24 | Topsoil (659E00300) | CY | 207 | $93.30 | $68.00 | $75.26 |
| 25 | Seeding and mulching (659E10000) | SY | 1,866 | $3.02 | $4.50 | $4.63 |
| 26 | Repair seeding and mulching (659E14000) | SY | 94 | $2.84 | $1.00 | $2.32 |
| 27 | Inter-seeding (659E15000) | SY | 94 | $0.11 | $1.00 | $2.32 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.25 | $9,408.00 | $1,130.00 | $2,315.80 |
| 29 | Lime (659E31000) | ACRE | 0.39 | $25.21 | $28.00 | $1,157.90 |
| 30 | Water (659E35000) | MGAL | 10.34 | $12.48 | $2.30 | $70.53 |
| 31 | Slope erosion protection mat, type B (670E00520) | SY | 612 | $3.62 | $5.00 | $4.63 |
| 32 | Erosion control (832E30000) | EACH | 4,000 | $1.00 | $1.00 | $1.00 |
| 33 | Aggregate drains (605E31100) | FT | 24 | $17.85 | $29.00 | $46.32 |
| 34 | 4" conduit, type C (611E00200) | FT | 10 | $31.80 | $134.00 | $46.32 |
| 35 | 6" conduit, type C (611E01100) | FT | 7 | $49.71 | $227.00 | $70.53 |
| 36 | 18" conduit, type C (611E07600) | FT | 135 | $119.00 | $115.00 | $173.68 |
| 37 | 24" conduit, type C (611E10600) | FT | 32 | $217.46 | $203.00 | $202.63 |
| 38 | 42" conduit, type B (611E19400) | FT | 93 | $861.54 | $463.00 | $674.13 |
| 39 | 72" conduit, type A, 707.02 (0.168) (611E26000) | FT | 14 | $1,600.93 | $1,700.00 | $2,579.89 |
| 40 | Field paving of existing pipe, as per plan (72" CM (611E96551) | FT | 65 | $264.44 | $805.00 | $463.16 |
| 41 | Conduit, misc.: 3' X 3' conduit, type A, 706.05 (611E97400) | FT | 16 | $1,417.12 | $1,320.00 | $2,905.16 |
| 42 | Catch basin, no. 4A (611E98270) | EACH | 1 | $13,068 | $9,500.00 | $11,000 |
| 43 | Manhole, no. 3 (611E99574) | EACH | 1 | $10,268 | $7,500.00 | $7,526.32 |
| 44 | Pavement planing, asphalt concrete (3.0 inch) (254E01000) | SY | 141 | $52.50 | $17.00 | $70.53 |
| 45 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 13 | $892.50 | $690.00 | $1,042.11 |
| 46 | Aggregate base (304E20000) | CY | 17 | $170.10 | $368.00 | $115.79 |
| 47 | Tack coat (407E10000) | GAL | 29 | $47.25 | $3.00 | $57.89 |
| 48 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 18 | $682.50 | $920.00 | $810.53 |
| 49 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 11 | $19.23 | $17.00 | $23.16 |
| 50 | Center line, type 1 (642E00300) | MI | 0.01 | $105,000 | $252,000 | $127,368 |
| 51 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $89.25 | $50.00 | $115.79 |
| 52 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,336.22 | $2,800.00 | $2,894.74 |
| 53 | Detour signing (614E12420) | LS | 1 | $5,073.83 | $2,100.00 | $3,473.68 |
| 54 | Barrier reflector, type 1 (one-way) (614E13310) | EACH | 15 | $11.85 | $11.50 | $17.37 |
| 55 | Object marker, one way (614E13350) | EACH | 15 | $17.10 | $40.00 | $28.95 |
| 56 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $1,060.50 | $1,035.00 | $1,736.84 |
| 57 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.19 | $19,998 | $23,000 | $16,211 |
| 58 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.16 | $9,984.00 | $14,375 | $13,895 |
| 59 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 25 | $12.08 | $29.00 | $8.11 |
| 60 | Portable barrier, unanchored (622E41100) | FT | 770 | $25.31 | $92.00 | $57.89 |
| 61 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,052.50 | $5,500.00 | $9,578.95 |
| 62 | Concrete masonry (602E20000) | CY | 5 | $1,994.70 | $1,800.00 | $3,064.11 |
| 63 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $2,064.00 | $2,300.00 | $13,895 |
| 64 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,052.50 | $5,500.00 | $23,158 |
| 65 | Unclassified excavation (503E21300) | LS | 1 | $1,783.20 | $6,800.00 | $4,631.58 |
| 66 | Epoxy coated steel reinforcement (509E10000) | LB | 996 | $2.36 | $10.00 | $5.79 |
| 67 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 2 | $1,875.00 | $3,800.00 | $4,631.58 |
| 68 | Class QC1 concrete, footing (511E46510) | CY | 6 | $1,850.00 | $1,040.00 | $1,794.74 |
| 69 | Class QC1 concrete, headwall (511E46610) | CY | 1 | $1,993.13 | $3,840.00 | $2,315.79 |
| 70 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 7 | $65.19 | $311.00 | $173.68 |
| 71 | Type 2 waterproofing (512E33000) | SY | 27 | $61.35 | $65.00 | $86.84 |
| 72 | 1" preformed expansion joint filler (516E13600) | SF | 13 | $10.14 | $18.00 | $12.74 |
| 73 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $1,026.90 | $985.00 | $1,505.26 |
| 74 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,052.50 | $5,500.00 | $9,578.95 |
| 75 | Concrete masonry (602E20000) | CY | 1 | $2,262.00 | $3,200.00 | $1,736.84 |
| 76 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $4,342.50 | $5,500.00 | $9,578.95 |
| 77 | Concrete masonry (602E20000) | CY | 1 | $2,770.50 | $2,100.00 | $2,778.95 |
| 78 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,527.08 | $7,100.00 | $22,926 |
| 79 | Maintaining traffic (614E11000) | LS | 1 | $45,720 | $4,900.00 | $135,088 |
| 80 | Field office, type A (619E16000) | MNTH | 5 | $2,992.80 | $1,200.00 | $1,236.84 |
| 81 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,440.00 | $7,900.00 | $19,368 |
| 82 | Mobilization (624E10000) | LS | 1 | $41,647 | $46,500 | $48,816 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.