ODOT contract 250510 bid tabulation
ERI-US 6-11.36 (PRUNING/OR TREE/BRUSH REMOVAL). Let by Ohio DOT on October 23, 2025, ERI. 3 bids received; low bid $179,185 by Edwards Land Clearing Inc, -19% against the engineer's estimate of $221,000.
- Owner
- Ohio DOT
- Letting
- 23 OCT 2025
- Pay items
- 14
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Edwards Land Clearing Inc | $179,185 | Low | -19% |
| 2 | Van Curen Services Inc | $241,255 | +35% | +9.0% |
| 3 | Crawford Construction Company Inc | $269,607 | +50% | +22% |
Engineer's estimate: $221,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Edwards Land Clearing Inc | 2. Van Curen Services Inc | 3. Crawford Construction Company Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $35,000 | $34,000 | $51,184 |
| 2 | Tree removed, 18" diameter (201E21800) | EACH | 71 | $610.00 | $690.00 | $983.00 |
| 3 | Tree removed, 30" diameter (201E23000) | EACH | 8 | $1,450.00 | $1,890.00 | $1,600.00 |
| 4 | Tree removed, 48" diameter (201E24800) | EACH | 11 | $2,600.00 | $4,200.00 | $2,900.00 |
| 5 | Stump removed, 18" diameter (201E26500) | EACH | 30 | $160.00 | $200.00 | $416.00 |
| 6 | Stump removed, 30" diameter (201E26510) | EACH | 10 | $225.00 | $300.00 | $1,043.00 |
| 7 | Stump removed, 48" diameter (201E26520) | EACH | 10 | $325.00 | $400.00 | $1,200.00 |
| 8 | Special - misc.: work involving tree cutting with (690E98400) | LS | 1 | $6,800.00 | $15,800 | $8,025.00 |
| 9 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 10 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $82.50 | $105.00 | $63.00 |
| 11 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,775.00 | $2,425.00 | $2,675.00 |
| 12 | Maintaining traffic (614E11000) | LS | 1 | $14,500 | $17,520 | $8,600.00 |
| 13 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $10,500 | $19,800 | $8,200.00 |
| 14 | Mobilization (624E10000) | LS | 1 | $8,500.00 | $19,200 | $34,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.