ODOT contract 260085 bid tabulation
GAL-Mercerville Shared Use Path (SIDEWALK). Let by Ohio DOT on February 19, 2026, GAL. 2 bids received; low bid $910,932 by Parker Corporation, +8.6% against the engineer's estimate of $839,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 71
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Parker Corporation | $910,932 | Low | +9.0% |
| 2 | Axis Civil Construction LLC | $1,010,883 | +11% | +20% |
Engineer's estimate: $839,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parker Corporation | 2. Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $28,300 | $15,000 |
| 2 | Pavement removed (202E23000) | SY | 93 | $15.00 | $25.00 |
| 3 | Curb removed (202E32000) | FT | 18 | $10.00 | $20.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 1,412 | $25.00 | $34.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 28 | $50.00 | $35.00 |
| 6 | Catch basin removed (202E58100) | EACH | 5 | $600.00 | $1,000.00 |
| 7 | Fence removed (202E75000) | FT | 104 | $5.00 | $12.00 |
| 8 | Excavation (203E10000) | CY | 456 | $20.00 | $35.00 |
| 9 | Embankment (203E20000) | CY | 1,285 | $20.00 | $35.00 |
| 10 | Subgrade compaction (204E10000) | SY | 2,135 | $0.50 | $3.00 |
| 11 | Proof rolling (204E45000) | HR | 2 | $100.00 | $250.00 |
| 12 | Fence, misc.: wood bike railing (607E98000) | FT | 410 | $50.00 | $58.00 |
| 13 | 5" concrete walk (608E12000) | SF | 17,257 | $8.00 | $12.05 |
| 14 | 8" concrete walk (608E15000) | SF | 1,051 | $38.50 | $17.00 |
| 15 | Curb ramp (608E52000) | SF | 921 | $30.00 | $17.00 |
| 16 | Detectable warning (608E53020) | SF | 169 | $40.00 | $25.00 |
| 17 | Curb, type 6 (609E26000) | FT | 424 | $55.00 | $42.00 |
| 18 | Curb, type 6, as per plan (609E26001) | FT | 118 | $55.00 | $42.00 |
| 19 | Special - mailbox removed and reset (690E50350) | EACH | 15 | $200.00 | $411.00 |
| 20 | Special - bollard, hinged (690E50610) | EACH | 2 | $1,200.00 | $600.00 |
| 21 | Soil analysis test (659E00100) | EACH | 2 | $100.00 | $150.00 |
| 22 | Topsoil (659E00300) | CY | 100 | $40.00 | $60.00 |
| 23 | Seeding and mulching (659E10000) | SY | 2,935 | $1.00 | $1.40 |
| 24 | Repair seeding and mulching (659E14000) | SY | 250 | $0.05 | $1.40 |
| 25 | Inter-seeding (659E15000) | SY | 250 | $0.05 | $1.40 |
| 26 | Commercial fertilizer (659E20000) | TON | 0.30 | $2,500.00 | $1,250.00 |
| 27 | Lime (659E31000) | ACRE | 0.75 | $1,000.00 | $150.00 |
| 28 | Water (659E35000) | MGAL | 22 | $0.05 | $1.00 |
| 29 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,800.00 | $1,500.00 |
| 30 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,420.00 | $7,500.00 |
| 31 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $10.00 | $9,500.00 |
| 32 | Erosion control (832E30000) | EACH | 19,350 | $1.00 | $1.00 |
| 33 | Rock channel protection, type B with filter (601E32100) | CY | 32 | $130.00 | $160.00 |
| 34 | Concrete masonry (602E20000) | CY | 20 | $2,000.00 | $1,800.00 |
| 35 | 4" base pipe underdrains (605E06000) | FT | 134 | $20.00 | $22.00 |
| 36 | Aggregate drains (605E31100) | FT | 100 | $20.00 | $20.00 |
| 37 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 10 | $35.00 | $20.00 |
| 38 | 12" conduit, type C (611E04600) | FT | 24 | $80.00 | $50.00 |
| 39 | 15" conduit, type B (611E05900) | FT | 5 | $115.00 | $140.00 |
| 40 | 15" conduit, type C (611E06100) | FT | 115 | $115.00 | $90.00 |
| 41 | 18" conduit, type B (611E07400) | FT | 328 | $120.00 | $95.00 |
| 42 | 18" conduit, type C (611E07600) | FT | 235 | $120.00 | $95.00 |
| 43 | 24" conduit, type B (611E10400) | FT | 95 | $160.00 | $105.00 |
| 44 | 24" conduit, type C (611E10600) | FT | 804 | $160.00 | $105.00 |
| 45 | 30" conduit, type B (611E13400) | FT | 27 | $225.00 | $250.00 |
| 46 | 120" conduit, type A (611E34000) | FT | 53 | $755.00 | $2,400.00 |
| 47 | Catch basin, no. 3A (611E98180) | EACH | 2 | $4,000.00 | $3,800.00 |
| 48 | Catch basin, no. 6 (611E98370) | EACH | 1 | $3,500.00 | $3,500.00 |
| 49 | Catch basin, no. 2-2B (611E98470) | EACH | 3 | $3,500.00 | $2,900.00 |
| 50 | Catch basin, no. 2-3 (611E98510) | EACH | 5 | $4,000.00 | $3,500.00 |
| 51 | Manhole, no. 3 (611E99574) | EACH | 1 | $5,000.00 | $4,500.00 |
| 52 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $3,000.00 | $3,200.00 |
| 53 | Aggregate base (304E20000) | CY | 24 | $200.00 | $130.00 |
| 54 | Stabilized crushed aggregate (411E10000) | CY | 27 | $200.00 | $150.00 |
| 55 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 8 | $1,000.00 | $400.00 |
| 56 | Ground mounted support, no. 3 post (630E03100) | FT | 215 | $22.97 | $23.00 |
| 57 | Street name sign support, no. 3 post (630E08520) | FT | 14 | $22.97 | $23.00 |
| 58 | Sign post reflector (630E08600) | EACH | 3 | $81.73 | $82.00 |
| 59 | Sign, flat sheet (630E80100) | SF | 107 | $26.79 | $27.00 |
| 60 | Removal of ground mounted sign and disposal (630E84900) | EACH | 10 | $16.56 | $17.00 |
| 61 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $81.74 | $82.00 |
| 62 | Removal of ground mounted post support and disposal (630E86002) | EACH | 8 | $22.08 | $23.00 |
| 63 | Removal of ground mounted post support and reerection (630E86010) | EACH | 1 | $140.87 | $141.00 |
| 64 | Signing, misc.: solar powered rectangular rapid FL (630E97700) | EACH | 2 | $9,195.49 | $9,200.00 |
| 65 | Stop line, type 1 (642E00500) | FT | 23 | $10.00 | $10.00 |
| 66 | Crosswalk line, 12", type 1 (642E00620) | FT | 194 | $8.50 | $10.00 |
| 67 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,100 | $8,500.00 |
| 68 | Maintaining traffic (614E11000) | LS | 1 | $19,500 | $25,000 |
| 69 | Field office, type B (619E16010) | MNTH | 4 | $100.00 | $1,800.00 |
| 70 | Construction layout stakes and surveying (623E10000) | LS | 1 | $19,500 | $15,000 |
| 71 | Mobilization (624E10000) | LS | 1 | $19,500 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.