ODOT contract 260084 bid tabulation
D12-BH FY2026 Overlay (BRIDGE REPAIR). Let by Ohio DOT on February 19, 2026, District 12. 4 bids received; low bid $1,842,325 by Ohio Concrete Maintenance LLC, -15% against the engineer's estimate of $2,156,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 98
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ohio Concrete Maintenance LLC | $1,842,325 | Low | -15% |
| 2 | Great Lakes Construction Co | $2,356,812 | +28% | +9.0% |
| 3 | Catts Construction Inc | $2,392,996 | +30% | +11% |
| 4 | Perk Company Inc | $2,473,000 | +34% | +15% |
Engineer's estimate: $2,156,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohio Concrete Maintenance LLC | 2. Great Lakes Construction Co | 3. Catts Construction Inc | 4. Perk Company Inc |
|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 136 | $90.00 | $76.00 | $45.00 | $50.00 |
| 2 | Guardrail removed (202E38000) | FT | 100 | $4.00 | $2.50 | $3.00 | $6.00 |
| 3 | Subgrade compaction (204E10000) | SY | 435 | $5.00 | $6.00 | $2.00 | $5.00 |
| 4 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $3,200.00 | $2,885.00 | $3,447.00 | $2,850.00 |
| 5 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 6 | Pavement planing, asphalt concrete (1 1/2" depth) (254E01000) | SY | 107 | $22.00 | $20.00 | $24.00 | $85.00 |
| 7 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 89 | $390.00 | $350.00 | $418.00 | $532.00 |
| 8 | Aggregate base (304E20000) | CY | 73 | $130.00 | $150.00 | $136.00 | $125.00 |
| 9 | Non-tracking tack coat (407E20000) | GAL | 72 | $2.25 | $2.00 | $2.40 | $6.00 |
| 10 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 13 | $655.00 | $600.00 | $717.00 | $850.00 |
| 11 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 5 | $1,100.00 | $1,000.00 | $1,195.00 | $1,550.00 |
| 12 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 18 | $450.00 | $400.00 | $478.00 | $1,325.00 |
| 13 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 0.07 | $72,000 | $15,000 | $77,660 | $100,000 |
| 14 | Barrier reflector, type 3, bidirectional (626E00112) | EACH | 6 | $20.00 | $15.00 | $18.00 | $13.00 |
| 15 | Edge line, 6" (646E10010) | MI | 1.03 | $17,500 | $14,160 | $16,918 | $14,160 |
| 16 | Center line (646E10200) | MI | 0.36 | $19,500 | $18,915 | $22,600 | $18,915 |
| 17 | Removal of existing pavement marking (512E74500) | FT | 3,096 | $6.50 | $1.65 | $2.00 | $1.75 |
| 18 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 480 | $120.00 | $100.00 | $90.00 | $125.00 |
| 19 | Special - work zone traffic signal (614E11300) | EACH | 14 | $5,000.00 | $6,700.00 | $11,469 | $4,000.00 |
| 20 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 12 | $2,600.00 | $1,750.54 | $2,771.00 | $1,751.00 |
| 21 | Detour signing (614E12420) | LS | 1 | $20,000 | $9,750.83 | $11,650 | $9,750.00 |
| 22 | Asphalt concrete for maintaining traffic (614E13000) | CY | 28 | $450.00 | $400.00 | $100.00 | $900.00 |
| 23 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 35 | $20.00 | $10.00 | $14.00 | $12.00 |
| 24 | Object marker, two way (614E13360) | EACH | 35 | $30.00 | $17.71 | $21.00 | $18.00 |
| 25 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $1,200.00 | $1,153.79 | $1,378.00 | $1,100.00 |
| 26 | Work zone center line, class I (614E21000) | MI | 0.74 | $8,250.00 | $4,175.00 | $4,988.00 | $4,175.00 |
| 27 | Work zone edge line, class I, 4" (614E22000) | MI | 0.91 | $6,000.00 | $2,875.00 | $3,434.00 | $2,875.00 |
| 28 | Work zone stop line, class I (614E26000) | FT | 136 | $5.50 | $5.00 | $6.00 | $5.00 |
| 29 | Portable barrier, unanchored (622E41100) | FT | 1,232 | $25.00 | $37.00 | $20.00 | $35.00 |
| 30 | Portable barrier, anchored (622E41110) | FT | 240 | $30.00 | $75.00 | $30.00 | $50.00 |
| 31 | Lighting, misc.: signal support mounted (625E98000) | EACH | 6 | $5,000.00 | $500.00 | $1,027.00 | $3,000.00 |
| 32 | Concrete slope protection removed, as per plan (202E32801) | SY | 138 | $145.00 | $80.00 | $27.00 | $85.00 |
| 33 | Concrete repair by epoxy injection (512E10600) | FT | 50 | $80.00 | $40.00 | $198.00 | $165.00 |
| 34 | Replacement of deteriorated end crossframes (513E21500) | LB | 230 | $59.00 | $90.00 | $58.00 | $38.00 |
| 35 | Field painting structural steel, intermediate coat (514E00060) | SF | 34 | $80.00 | $310.00 | $60.00 | $50.00 |
| 36 | Field painting structural steel, finish coat (514E00066) | SF | 34 | $80.00 | $45.00 | $60.00 | $50.00 |
| 37 | Reset bearing, as per plan (516E46701) | EACH | 5 | $1,000.00 | $1,250.00 | $1,622.00 | $10,813 |
| 38 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $11,000 | $12,000 | $11,971 | $14,000 |
| 39 | Patching concrete structure (519E11100) | SF | 26 | $150.00 | $200.00 | $245.00 | $288.00 |
| 40 | Special - patching concrete structure, misc.: para (519E11600) | SF | 180 | $100.00 | $105.00 | $245.00 | $200.00 |
| 41 | Special - patching concrete structure, misc.: safe (519E11720) | FT | 151 | $70.00 | $105.00 | $125.50 | $175.00 |
| 42 | Special - structures: timber subdeck (530E00600) | SF | 7,293 | $14.00 | $15.00 | $9.00 | $7.00 |
| 43 | Concrete slope protection, as per plan (601E21001) | SY | 144 | $198.00 | $205.00 | $143.00 | $186.00 |
| 44 | Micro silica modified concrete overlay using hydrodemolition (848E10000) | SY | 1,421 | $63.00 | $80.00 | $71.00 | $80.00 |
| 45 | Surface preparation using hydrodemolition (848E20000) | SY | 1,421 | $80.00 | $90.00 | $80.00 | $120.00 |
| 46 | Micro silica modified concrete overlay (variable thickness), material only (848E30000) | CY | 10 | $350.00 | $350.00 | $369.00 | $300.00 |
| 47 | Hand chipping (848E50000) | SY | 180 | $130.00 | $265.00 | $180.00 | $125.00 |
| 48 | Test slab (848E50100) | LS | 1 | $500.00 | $2,000.00 | $2,353.00 | $100.00 |
| 49 | Full-depth repair (848E50200) | CY | 4 | $500.00 | $2,750.00 | $2,946.00 | $3,000.00 |
| 50 | Existing concrete overlay removed, as per plan (848E50321) | SY | 1,421 | $9.00 | $18.00 | $14.75 | $20.00 |
| 51 | Wearing course removed, as per plan (202E23501) | SY | 280 | $30.00 | $25.00 | $59.50 | $57.00 |
| 52 | Bridge railing removed, as per plan (202E38501) | FT | 58 | $9.00 | $8.00 | $10.00 | $50.00 |
| 53 | Tack coat (407E10000) | GAL | 31 | $2.25 | $2.00 | $2.40 | $6.00 |
| 54 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 21 | $900.00 | $800.00 | $955.00 | $860.00 |
| 55 | Type 3 waterproofing (512E33010) | SY | 133 | $35.00 | $57.00 | $65.00 | $100.00 |
| 56 | Railing (deep beam rail with 3 steel tubular backups and steel posts), as per plan (517E72511) | FT | 61 | $155.00 | $142.00 | $169.60 | $167.00 |
| 57 | Special - steel drip strip (518E22300) | FT | 64 | $26.00 | $97.00 | $46.00 | $44.75 |
| 58 | Portions of structure removed, as per plan (202E11301) | CY | 23 | $2,800.00 | $7,500.00 | $5,400.00 | $3,100.00 |
| 59 | Epoxy coated steel reinforcement (509E10000) | LB | 1,301 | $2.00 | $4.75 | $5.00 | $5.00 |
| 60 | Class QC2 concrete with QC/QA, superstructure (511E34412) | CY | 28 | $2,000.00 | $1,850.00 | $2,851.00 | $2,843.00 |
| 61 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 166 | $40.00 | $45.00 | $57.00 | $66.50 |
| 62 | Surface preparation of existing structural steel (514E00050) | SF | 590 | $45.00 | $40.00 | $77.65 | $65.00 |
| 63 | Field painting of existing structural steel, prime coat (514E00056) | SF | 590 | $6.00 | $5.00 | $53.75 | $45.00 |
| 64 | Field painting structural steel, intermediate coat (514E00060) | SF | 590 | $6.00 | $5.00 | $18.00 | $15.00 |
| 65 | Field painting structural steel, finish coat (514E00066) | SF | 590 | $6.00 | $5.00 | $12.00 | $15.00 |
| 66 | Railing (three steel tube bridge railing) (517E70100) | FT | 192 | $500.00 | $465.00 | $555.55 | $482.00 |
| 67 | Special - steel drip strip (518E22300) | FT | 212 | $26.00 | $65.00 | $61.00 | $30.00 |
| 68 | Patching concrete structure (519E11100) | SF | 4 | $200.00 | $500.00 | $597.00 | $500.00 |
| 69 | Micro silica modified concrete overlay using hydrodemolition (848E10000) | SY | 356 | $150.00 | $235.00 | $133.00 | $173.00 |
| 70 | Surface preparation using hydrodemolition (848E20000) | SY | 356 | $102.00 | $130.00 | $103.00 | $170.50 |
| 71 | Micro silica modified concrete overlay (variable thickness), material only (848E30000) | CY | 5 | $400.00 | $400.00 | $368.00 | $300.00 |
| 72 | Hand chipping (848E50000) | SY | 65 | $130.00 | $265.00 | $179.00 | $150.00 |
| 73 | Test slab (848E50100) | LS | 1 | $500.00 | $2,000.00 | $2,353.00 | $100.00 |
| 74 | Existing concrete overlay removed, as per plan (848E50321) | SY | 356 | $45.00 | $58.00 | $49.00 | $25.00 |
| 75 | Wearing course removed, as per plan (202E23501) | SY | 325 | $30.00 | $20.00 | $49.00 | $60.00 |
| 76 | Bridge railing removed, as per plan (202E38501) | FT | 106 | $9.00 | $8.00 | $9.00 | $50.00 |
| 77 | Tack coat (407E10000) | GAL | 36 | $2.25 | $2.00 | $2.00 | $6.00 |
| 78 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 33 | $675.00 | $600.00 | $715.00 | $1,160.00 |
| 79 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $150.00 | $500.00 | $597.00 | $1,428.00 |
| 80 | Concrete repair by epoxy injection (512E10600) | FT | 68 | $80.00 | $40.00 | $197.00 | $165.00 |
| 81 | Type 3 waterproofing (512E33010) | SY | 205 | $35.00 | $65.00 | $65.00 | $76.00 |
| 82 | Structural expansion joint including elastomeric compression seal, as per plan (516E10501) | FT | 72 | $650.00 | $1,500.00 | $1,590.00 | $1,933.00 |
| 83 | Railing (deep beam rail with 3 steel tubular backups and steel posts), as per plan (517E72511) | FT | 106 | $156.00 | $141.00 | $168.00 | $163.00 |
| 84 | Special - steel drip strip (518E22300) | FT | 114 | $26.00 | $70.00 | $50.00 | $62.00 |
| 85 | Patching concrete structure (519E11100) | SF | 236 | $125.00 | $125.00 | $244.00 | $205.00 |
| 86 | Special - patching concrete structure: repair corr (519E11600) | SF | 25 | $125.00 | $125.00 | $364.00 | $305.00 |
| 87 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $9,500.00 | $17,500 | $12,896 | $11,668 |
| 88 | Concrete repair by epoxy injection (512E10600) | FT | 84 | $100.00 | $40.00 | $197.00 | $165.00 |
| 89 | Structural steel, misc.: expansion joint cover pla (513E90000) | LB | 603 | $23.00 | $22.00 | $24.00 | $60.00 |
| 90 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 213 | $40.00 | $35.00 | $57.00 | $66.50 |
| 91 | Concrete repair by epoxy injection (512E10600) | FT | 25 | $100.00 | $40.00 | $197.00 | $165.00 |
| 92 | Special - composite fiber wrap system (519E00100) | SF | 912 | $35.00 | $35.00 | $66.00 | $56.00 |
| 93 | Patching concrete structure, as per plan (519E11101) | SF | 508 | $120.00 | $125.00 | $244.00 | $205.00 |
| 94 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $26,500 | $35,500 | $24,430 | $21,000 |
| 95 | Maintaining traffic (614E11000) | LS | 1 | $75,000 | $268,000 | $145,000 | $190,000 |
| 96 | Field office, type B, as per plan (619E16011) | MNTH | 7 | $1,500.00 | $4,200.00 | $1,433.00 | $2,352.00 |
| 97 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $5,000.00 | $2,389.00 | $20,000 |
| 98 | Mobilization (624E10000) | LS | 1 | $115,000 | $117,500 | $142,728 | $92,089 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.