ODOT contract 260350 bid tabulation
HAS-/TUS-SR 342/SR 800-0.00/VAR (CHIP SEAL). Let by Ohio DOT on July 30, 2026, HAS. 4 bids received; low bid $679,886 by Saorsa Construction Ohio, Inc., -6.1% against the engineer's estimate of $724,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 29
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Saorsa Construction Ohio, Inc. | $679,886 | Low | -6.0% |
| 2 | Henry W Bergman Inc | $688,787 | +1.0% | -5.0% |
| 3 | Shelly Company | $735,905 | +8.0% | +2.0% |
| 4 | Melway Paving Co Inc | $738,331 | +9.0% | +2.0% |
Engineer's estimate: $724,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Saorsa Construction Ohio, Inc. | 2. Henry W Bergman Inc | 3. Shelly Company | 4. Melway Paving Co Inc |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 673 | $23.00 | $10.00 | $25.00 | $18.00 |
| 2 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 6 | $650.00 | $1,500.00 | $4,000.00 | $2,400.00 |
| 3 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 4 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 30 | $382.00 | $750.00 | $900.00 | $1,250.00 |
| 5 | Pavement repair, misc.: shoulder rebuilt (253E90100) | SY | 422 | $138.00 | $115.00 | $200.00 | $210.00 |
| 6 | Tack coat (407E10000) | GAL | 57 | $4.50 | $5.00 | $3.50 | $4.00 |
| 7 | Aggregate, single chip seal, type A, as per plan (422E11001) | SY | 98,148 | $1.65 | $0.57 | $1.62 | $1.35 |
| 8 | Emulsion, chip seal (422E25000) | GAL | 36,314 | $4.35 | $4.90 | $3.25 | $3.75 |
| 9 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 23 | $330.00 | $1,200.00 | $850.00 | $800.00 |
| 10 | Fog seal (886E11000) | GAL | 14,722 | $2.75 | $4.50 | $3.30 | $3.50 |
| 11 | RPM (621E00100) | EACH | 960 | $36.00 | $46.00 | $42.00 | $36.00 |
| 12 | Raised pavement marker removed (621E54000) | EACH | 944 | $15.00 | $22.00 | $17.00 | $15.00 |
| 13 | Edge line, 6", type 1 (642E00104) | MI | 14.22 | $850.00 | $950.00 | $850.00 | $850.00 |
| 14 | Center line, type 1 (642E00300) | MI | 7.11 | $1,065.00 | $1,200.00 | $1,065.00 | $1,065.00 |
| 15 | Channelizing line, 8", type 1 (642E00400) | FT | 67 | $2.50 | $3.00 | $2.50 | $2.50 |
| 16 | Stop line, type 1 (642E00500) | FT | 35 | $4.00 | $5.00 | $4.00 | $4.00 |
| 17 | Lane arrow, type 1 (642E01300) | EACH | 2 | $125.00 | $150.00 | $125.00 | $125.00 |
| 18 | Removal of pavement marking (642E30000) | FT | 102 | $1.00 | $1.20 | $3.00 | $1.00 |
| 19 | Removal of pavement marking (642E30020) | EACH | 2 | $38.00 | $50.00 | $100.00 | $43.00 |
| 20 | Removal of pavement marking (642E30030) | MI | 21.33 | $1,100.00 | $1,500.00 | $1,420.00 | $1,250.00 |
| 21 | Work zone marking sign (614E12460) | EACH | 40 | $95.00 | $110.00 | $95.00 | $95.00 |
| 22 | Work zone center line, class II, 642 paint (614E21500) | MI | 21.33 | $500.00 | $1,100.00 | $290.00 | $500.00 |
| 23 | Work zone center line, class III, 642 paint (614E21550) | MI | 21.33 | $935.00 | $1,100.00 | $935.00 | $935.00 |
| 24 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 201 | $1.50 | $2.00 | $1.50 | $1.50 |
| 25 | Work zone stop line, class III, 642 paint (614E26610) | FT | 105 | $3.50 | $4.00 | $3.50 | $3.50 |
| 26 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,913 | $5,000.00 | $4,350.00 | $3,500.00 |
| 27 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $38,000 | $60,000 | $64,000 |
| 28 | Field office, type B (619E16010) | MNTH | 5 | $2,000.00 | $2,000.00 | $2,000.00 | $2,500.00 |
| 29 | Mobilization (624E10000) | LS | 1 | $27,000 | $48,000 | $25,000 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.