ODOT contract 250304 bid tabulation

HOL-SR 520-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on June 12, 2025, HOL. 1 bid received; low bid $1,419,742 by Melway Paving Co Inc, +7.9% against the engineer's estimate of $1,316,000.

Owner
Ohio DOT
Letting
12 JUN 2025
Pay items
26
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Melway Paving Co Inc$1,419,742Low+8.0%
ODOT contract 250304: bids by rank

Engineer's estimate: $1,316,000.

Bid tabulation

LinePay itemUnitQuantity1. Melway Paving Co Inc
1Wearing course removed (202E23500)SY587$15.00
2Monument assembly reconstructed to grade, as per plan (623E39601)EACH5$1,400.00
3Erosion control (832E30000)EACH1,000$1.00
4Aggregate drains (605E31100)FT650$14.00
5Partial depth pavement repair (441) (251E01010)CY85$450.00
6Partial depth pavement repair (asphalt concrete base) (251E01042)CY390$435.00
7Pavement repair (253E02000)CY650$435.00
8Tack coat, 702.13 (407E13900)GAL50$3.00
9Aggregate, single chip seal, type A, as per plan (422E11001)SY159,601$1.20
10Emulsion, chip seal (422E25000)GAL59,053$3.75
11Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY29$775.00
12Fog seal (886E11000)GAL23,941$3.65
13RPM (621E00100)EACH1,636$38.00
14Raised pavement marker removed (621E54000)EACH1,636$15.00
15Edge line, 6", type 1 (642E00104)MI24.74$905.00
16Center line, type 1 (642E00300)MI12.35$1,090.00
17Stop line, type 1 (642E00500)FT28$9.55
18Removal of pavement marking (642E30030)MI37.09$1,285.00
19Work zone marking sign (614E12460)EACH33$60.50
20Work zone center line, class II, 642 paint (614E21500)MI37.11$300.00
21Work zone center line, class III, 642 paint (614E21550)MI37.11$1,110.00
22Work zone stop line, class III, 642 paint (614E26610)FT56$3.55
23Premium for contract performance bond and for payment bond (103E05000)LS1$5,000.00
24Maintaining traffic (614E11000)LS1$95,000
25Field office, type B (619E16010)MNTH6$2,200.00
26Mobilization (624E10000)LS1$42,000
ODOT contract 250304: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy