ODOT contract 250314 bid tabulation

D08-LG-FY2026/2027 (LIGHTING). Let by Ohio DOT on June 12, 2025, District 8. 1 bid received; low bid $2,591,576 by Capital Electric Line Builders Inc, +0.1% against the engineer's estimate of $2,590,000.

Owner
Ohio DOT
Letting
12 JUN 2025
Pay items
86
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Capital Electric Line Builders Inc$2,591,576Low0.0%
ODOT contract 250314: bids by rank

Engineer's estimate: $2,590,000.

Bid tabulation

LinePay itemUnitQuantity1. Capital Electric Line Builders Inc
1Clearing and grubbing (201E11000)LS1$5,456.00
24" conduit, type E (611E00400)FT50$6.73
3Connection, unfused permanent (625E00480)EACH80$67.27
4Light pole, conventional, as per plan, (replacemen (625E10491)EACH40$2,065.75
5Light pole, low mast, as per plan, (replacements) (625E10495)EACH2$4,230.62
6Light pole, misc.: structure maintenance for ligh (625E10500)EACH3,856$32.22
7Erecting reusable downed light pole, as per plan (625E10505)EACH50$640.75
8Light tower, BB100 (625E11200)EACH1$36,143
9Light tower, misc.: plug (625E13500)EACH25$118.66
10Light tower, misc.: structure maintenance for lig (625E13500)EACH520$92.26
11Light tower, misc.:junction box (625E13500)EACH10$1,953.28
12Light tower, misc.:plug on tower ring (625E13500)EACH10$149.33
13Light tower, misc.:replace S-O cable (625E13500)EACH1$1,921.70
14Median light pole foundation, 8' deep (625E14300)EACH1$31,425
15Light pole foundation repair, as per plan (625E14401)EACH40$1,091.20
16Bracket arm, misc.: conventional light pole (625E18600)EACH40$1,338.50
17Bracket arm, misc.: installation of reusable brac (625E18600)EACH40$122.65
18Bracket arm, misc.: low mast light pole (625E18600)EACH5$645.19
19Ballast for tower light fixture, as per plan (625E19101)EACH50$281.33
20No. 4 AWG 2400 volt distribution cable, as per plan (625E23201)FT15,000$3.65
21No. 2 AWG 2400 volt distribution cable, as per plan (625E23301)FT1,000$4.76
22No. 10 AWG pole and bracket cable (625E23400)FT7,500$1.30
231-1/2" duct cable with two no. 4 AWG 2400 volt cables, as per plan (625E24101)FT1,000$20.21
241-1/2" duct cable with two no. 2 AWG 2400 volt cables, as per plan (625E24301)FT1,000$27.74
251-1/2" duct cable with three no. 4 AWG 2400 volt cables, as per plan (625E24321)FT1,000$27.65
26Conduit, 2", 725.04, as per plan (625E25401)FT500$14.22
27Conduit, 2", 725.05 (625E25402)FT100$6.17
28Conduit, jacked or drilled, 3" (625E25900)FT1,000$29.16
29Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH2$30.66
30Luminaire, misc.: luminaire maintenance (625E27600)EACH5,929$30.72
31Luminaire, misc.: luminaire, conventional (625E27600)EACH200$410.16
32Luminaire, misc.: luminaire, low mast (625E27600)EACH20$1,396.88
33Luminaire, misc.: luminaire, tower (625E27600)EACH15$1,427.55
34Luminaire, misc.: luminaire, underdeck or wall MO (625E27600)EACH10$709.47
35Ballast, misc.: ballast for low mast light fixtur (625E27800)EACH20$281.33
36Ballast, misc.: ballast for underdeck light fixtu (625E27800)EACH5$171.33
37Trench, 24" deep, as per plan (625E29003)FT600$9.92
38Junction box, as per plan (625E29901)EACH1$2,454.36
39Pull box, 725.08, 18" (625E30700)EACH10$1,346.40
40Ground rod (625E32000)EACH2$226.33
41Ground rod, as per plan (625E32001)EACH10$226.33
42Circuit breaker, tower lighting, as per plan (625E33101)EACH10$721.33
43Power service, as per plan (625E34001)EACH5$12,448
44Control center cabinet, complete, as per plan, 100 (625E34451)EACH5$5,381.20
45Control center maintenance item, as per plan, circ (625E34507)EACH5$748.83
46Control center maintenance item, as per plan, cont (625E34507)EACH130$128.15
47Control center maintenance item, as per plan, disc (625E34507)EACH5$1,345.30
48Control center maintenance item, as per plan, fuse (625E34507)EACH50$58.16
49Control center maintenance item, as per plan, H-O- (625E34507)EACH10$171.33
50Control center maintenance item, as per plan, ligh (625E34507)EACH10$281.33
51Control center maintenance item, as per plan, phot (625E34507)EACH5$281.33
52Reerect existing luminaire, as per plan (625E35101)EACH10$30.66
53Power cable for light tower, as per plan (625E36201)FT500$4.53
54Repairing underground break of cable in duct or conduit, as per plan (625E50001)EACH50$600.60
55Troubleshooting underground and above ground circuitry problem (625E50100)EACH1,000$245.30
56Frangible base, as per plan (625E50301)EACH200$952.16
57Repair integral luminaire lowering mechanism of tower lighting fixture, as per plan (625E50401)EACH5$10,881
58Secondary surge protector, as per plan (625E50451)EACH5$58.16
59Special - emergency response-knockdown, roadway hazard and/or live exposed wire (625E50500)EACH300$490.60
60Light tower removed, as per plan (625E75351)EACH1$6,362.40
61Light pole foundation removed (625E75500)EACH5$501.60
62Luminaire removed for storage (625E75504)EACH5$30.66
63Light tower foundation removed (625E75540)EACH1$501.60
64Disconnect circuit, as per plan (625E75801)EACH6$122.65
65Arc flash calculations and label, (by location) (625E76000)EACH10$2,750.00
66Lighting, misc.: connector kit, KTK fuse (625E98000)EACH1,500$41.66
67Lighting, misc.: fused, pull-apart connector kit (625E98000)EACH300$83.79
68Lighting, misc.: lamp for luminaire, conventional (625E98000)EACH2,448$43.86
69Lighting, misc.: lamp for luminaire, low mast (625E98000)EACH134$43.86
70Lighting, misc.: lamp for luminaire, tower (625E98000)EACH764$43.86
71Lighting, misc.: lamp for luminaire, underdeck or (625E98000)EACH341$43.86
72Lighting, misc.: lytle tunnel LED inspection and (625E98000)EACH12$4,965.40
73Lighting, misc.: photoelectric cell (625E98000)EACH50$106.43
74Lighting, misc.: removal and RE-erection of light (625E98000)EACH50$245.30
75Lighting, misc.: service to underpass lighting RE (625E98000)EACH1$1,962.40
76Lighting, misc.: removal of cable in existing duc (625E98100)FT1,500$1.23
77Lighting, misc.: marking existing lighting cable (625E98700)HR2,000$122.65
78Sign lighting misc.: removal of sign service and (631E97700)EACH3$367.95
79Sign lighting misc.: removal of sign wiring and D (631E97700)EACH3$367.95
80Sign lighting misc.: repair of weigh station "ope (631E97700)EACH10$1,345.30
81Power cable, misc.: temporary overhead cable (tri (632E69350)FT1,000$2.00
82Wood pole, as per plan (632E89301)EACH5$1,971.20
83Law enforcement officer with patrol car for assistance (614E11110)HR125$88.00
84Premium for contract performance bond and for payment bond (103E05000)LS1$16,992
85Maintaining traffic (614E11000)LS1$33,000
86Mobilization (624E10000)LS1$34,265
ODOT contract 250314: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy