ODOT contract 260410 bid tabulation

MAR-SR-SR 309/SR 95/SR 203-18.79/17.19/07.75 (TWO LANE RESURFACING). Let by Ohio DOT on September 17, 2026, MAR. 2 bids received; low bid $4,236,924 by Shelly & Sands Inc, -5.4% against the engineer's estimate of $4,479,000.

Owner
Ohio DOT
Letting
17 SEP 2026
Pay items
79
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$4,236,924Low-5.0%
2Kokosing Construction Company Inc$4,462,513+5.0%0.0%
ODOT contract 260410: bids by rank

Engineer's estimate: $4,479,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc2. Kokosing Construction Company Inc
1Pavement removed, as per plan (202E23001)SY4$40.00$40.00
2Walk removed, as per plan (202E30001)SF307$8.50$8.50
3Guardrail removed, as per plan (202E38001)FT262.50$2.60$2.50
4Anchor assembly removed, type A, as per plan (202E42001)EACH4$345.00$350.00
5Embankment, as per plan (203E20001)CY152$72.50$55.00
6Linear grading (209E60200)STA11.90$95.00$55.00
7Guardrail, type MGS (606E15050)FT493.75$22.40$22.00
8Guardrail, type MGS, 25' long-span (606E17350)FT100$24.80$25.00
9Anchor assembly, MGS type B (606E26050)EACH1$2,785.00$2,600.00
10Anchor assembly, MGS type E (606E26150)EACH3$2,820.00$2,500.00
11Anchor assembly, MGS type T (606E26550)EACH3$1,395.00$1,250.00
12Bridge terminal assembly, type 4, as per plan (606E35141)EACH3$1,425.00$1,500.00
13Bridge terminal assembly, type 4, as per plan (606E35141)EACH1$1,520.00$1,550.00
14Guardrail, misc.: panel replacement (606E98000)FT100$13.60$12.00
15Curb ramp (608E52000)SF227$40.50$40.50
16Curb ramp, as per plan (608E52001)SF112$47.50$47.50
17Topsoil (659E00300)CY156$60.00$60.00
18Seeding and mulching (659E10000)SY1,476$2.95$2.60
19Commercial fertilizer (659E20000)TON0.19$720.00$800.00
20Lime (659E31000)ACRE0.30$20.00$0.30
21Water (659E35000)MGAL8$1.00$0.10
22Erosion control (832E30000)EACH1,000$1.00$1.00
23Aggregate drains (605E31100)FT1,836$17.00$8.00
24Catch basin adjusted to grade (611E98630)EACH4$1,000.00$1,350.00
25Manhole adjusted to grade (611E99654)EACH4$500.00$1,200.00
26Partial depth pavement repair (asphalt concrete base) (251E01040)SY53$215.00$40.00
27Partial depth pavement repair (asphalt concrete base) (251E01040)SY7,925$40.00$45.00
28Partial depth pavement repair (asphalt concrete base) (251E01040)SY670$85.00$60.00
29Pavement repair, as per plan (253E02001)CY3,066$235.00$230.00
30Pavement planing, asphalt concrete, 1.5" (254E01000)SY131,330$1.00$1.75
31Pavement planing, asphalt concrete, as per plan, 1 (254E01001)SY73,118$1.15$1.00
32Non-tracking tack coat (407E20000)GAL17,524$3.15$2.75
33Sawing and sealing asphalt concrete pavement joints (409E30000)FT172$28.44$28.44
34Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY6,633$200.00$225.00
35Asphalt concrete surface course, type 1, (446), as per plan (441E10101)CY14$1,000.00$260.00
36Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY51$750.00$475.00
37Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000)CY1,882$220.00$255.00
38Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100)CY10$800.00$400.00
39Compacted aggregate (617E10100)CY661$50.00$95.00
40Shoulder preparation (617E20000)SY10,003$2.50$0.25
41Water (617E25000)MGAL10$50.00$10.00
42Longitudinal joint preparation, as per plan (874E21001)MI8.23$5,000.00$2,500.00
43Valve box adjusted to grade (638E10800)EACH4$300.00$925.00
44RPM (621E00100)EACH1,526$37.50$35.90
45Raised pavement marker removed (621E54000)EACH1,526$4.00$1.00
46Barrier reflector, type 2, bidirectional (626E00110)EACH20$14.60$12.50
47Edge line, 6", type 1 (642E00104)MI17.47$960.00$860.00
48Lane line, 6", type 1 (642E00204)MI2.16$650.00$305.00
49Center line, type 1 (642E00300)MI11.06$995.00$715.00
50Channelizing line, 8", type 1 (642E00400)FT16,418$0.75$1.30
51Dotted line, 6", type 1 (642E01510)FT679$1.00$1.00
52Stop line (644E00500)FT1,024$6.95$6.15
53Crosswalk line, 12" (644E00620)FT272$3.65$5.65
54Crosswalk line, 24" (644E00630)FT750$8.50$6.05
55Transverse/diagonal line (644E00700)FT2,291$7.00$5.90
56Chevron marking (644E00720)FT22$8.00$5.90
57Railroad symbol marking (644E01000)EACH2$830.00$400.00
58School symbol marking, 72" (644E01100)EACH4$780.00$400.00
59Lane arrow (644E01300)EACH114$95.00$150.00
60Bike lane symbol marking (644E01630)EACH26$230.00$350.00
61Pavement marking, misc.:bike lane straight arrow (644E50100)EACH26$110.00$250.00
62Detector loop, as per plan (632E26501)EACH4$2,100.00$2,100.00
63Loop detector tie in (632E27200)EACH4$100.00$100.00
64Law enforcement officer with patrol car for assistance (614E11110)HR152$100.00$105.00
65Work zone marking sign, as per plan (614E12461)EACH97$85.00$105.89
66Portable changeable message sign, as per plan (614E18601)SNMT7$1,000.00$954.16
67Work zone lane line, class III, 6", 642 paint (614E20560)MI2.16$700.00$245.00
68Work zone center line, class III, 642 paint (614E21550)MI18.80$990.00$505.00
69Work zone edge line, class III, 6", 642 paint (614E22360)MI17.46$700.00$655.00
70Work zone channelizing line, class III, 8", 642 paint (614E23680)FT18,060$1.00$0.95
71Work zone dotted line, class III, 6", 642 paint (614E24612)FT679$1.00$0.90
72Work zone stop line, class III, 642 paint (614E26610)FT1,143$3.00$3.50
73Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT1,378$2.00$3.00
74Work zone arrow, class III, 642 paint (614E30650)EACH133$70.00$95.00
75Premium on railroads' protective public liability and property damage liability insurance (100E00300)LS1$3,000.00$4,000.00
76Premium for contract performance bond and for payment bond (103E05000)LS1$20,000$18,000
77Maintaining traffic (614E11000)LS1$329,300$285,000
78Construction layout stakes and surveying, as per plan (623E10001)LS1$40,000$9,435.00
79Mobilization (624E10000)LS1$175,000$225,000
ODOT contract 260410: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of September 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy