ODOT contract 264023 bid tabulation
BEL-SR 148-20.10 (SLIDE REPAIR). Let by Ohio DOT on September 17, 2026, BEL. 2 bids received; low bid $943,435 by J & J Bridge Company Inc, -6.2% against the engineer's estimate of $1,006,000.
- Owner
- Ohio DOT
- Letting
- 17 SEP 2026
- Pay items
- 62
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | J & J Bridge Company Inc | $943,435 | Low | -6.0% |
| 2 | Alan Stone Co Inc | $1,021,773 | +8.0% | +2.0% |
Engineer's estimate: $1,006,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J & J Bridge Company Inc | 2. Alan Stone Co Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100.00 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 2,977 | $5.00 | $15.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 38 | $20.00 | $10.00 |
| 4 | Guardrail removed (202E38000) | FT | 501 | $1.00 | $3.00 |
| 5 | Excavation (203E10000) | CY | 1,616 | $20.00 | $30.00 |
| 6 | Embankment (203E20000) | CY | 233 | $20.00 | $15.00 |
| 7 | Subgrade compaction (204E10000) | SY | 3,580 | $5.00 | $2.00 |
| 8 | Excavation of subgrade (204E13000) | CY | 739 | $12.00 | $30.00 |
| 9 | Granular material, type B (204E30010) | CY | 984 | $95.00 | $110.00 |
| 10 | Proof rolling (204E45000) | HR | 2 | $300.00 | $1,100.00 |
| 11 | Geotextile fabric (204E50000) | SY | 2,920 | $4.00 | $1.50 |
| 12 | Guardrail, type MGS (606E15050) | FT | 450 | $24.50 | $30.00 |
| 13 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,600.00 | $3,000.00 |
| 14 | Monument assembly, type C (623E38500) | EACH | 6 | $1,500.00 | $1,500.00 |
| 15 | Right-of-way monument, type B (623E40520) | EACH | 9 | $600.00 | $260.00 |
| 16 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $350.00 |
| 17 | Topsoil (659E00300) | CY | 717 | $10.00 | $25.00 |
| 18 | Seeding and mulching (659E10000) | SY | 6,061 | $0.92 | $1.00 |
| 19 | Repair seeding and mulching (659E14000) | SY | 303 | $0.50 | $0.90 |
| 20 | Inter-seeding (659E15000) | SY | 303 | $0.50 | $0.90 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.85 | $952.00 | $1,100.00 |
| 22 | Lime (659E31000) | ACRE | 1.25 | $155.00 | $180.00 |
| 23 | Water (659E35000) | MGAL | 35 | $1.00 | $1.00 |
| 24 | Ditch erosion protection (670E00700) | SY | 401 | $1.66 | $2.00 |
| 25 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,900.00 | $3,300.00 |
| 26 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $2,000.00 | $12,000 |
| 27 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,000.00 | $15,000 |
| 28 | Erosion control (832E30000) | EACH | 35,000 | $1.00 | $1.00 |
| 29 | Concrete masonry (602E20000) | CY | 0.60 | $3,000.00 | $3,200.00 |
| 30 | Aggregate drains (605E31100) | FT | 390 | $20.00 | $20.00 |
| 31 | 15" conduit, type A (611E05700) | FT | 60 | $102.65 | $240.00 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 390 | $260.00 | $270.00 |
| 33 | Aggregate base (304E20000) | CY | 488 | $130.00 | $120.00 |
| 34 | Tack coat (407E10000) | GAL | 327 | $3.75 | $5.00 |
| 35 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 95 | $450.00 | $370.00 |
| 36 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 133 | $380.00 | $310.00 |
| 37 | RPM (621E00100) | EACH | 22 | $150.00 | $170.00 |
| 38 | Raised pavement marker removed (621E54000) | EACH | 22 | $10.00 | $24.00 |
| 39 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 12 | $12.50 | $15.00 |
| 40 | Edge line, 6" (646E10010) | MI | 0.64 | $8,790.00 | $10,000 |
| 41 | Center line (646E10200) | MI | 0.51 | $13,500 | $16,000 |
| 42 | Law enforcement officer for assistance (614E11130) | HR | 70 | $95.00 | $120.00 |
| 43 | Increased barrier delineation (614E11630) | FT | 610 | $1.15 | $1.50 |
| 44 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $2,300.00 | $2,700.00 |
| 45 | Work zone lighting system (614E12740) | EACH | 2 | $2,000.00 | $2,200.00 |
| 46 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $200.00 | $420.00 |
| 47 | Barrier reflector, type 2, (BI-directional) (614E13312) | EACH | 69 | $28.00 | $15.00 |
| 48 | Object marker, two way (614E13360) | EACH | 69 | $30.00 | $35.00 |
| 49 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.51 | $1,550.00 | $1,800.00 |
| 50 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.18 | $14,750 | $17,000 |
| 51 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.64 | $1,225.00 | $1,400.00 |
| 52 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.29 | $10,375 | $12,000 |
| 53 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 24 | $14.00 | $15.00 |
| 54 | Roads for maintaining traffic (615E10000) | LS | 1 | $10,000 | $45,000 |
| 55 | Pavement for maintaining traffic, class A (615E20000) | SY | 1,134 | $50.00 | $90.00 |
| 56 | Water (616E10000) | MGAL | 5 | $1.00 | $120.00 |
| 57 | Portable barrier, unanchored (622E41100) | FT | 2,740 | $35.00 | $15.00 |
| 58 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $12,000 |
| 59 | Maintaining traffic (614E11000) | LS | 1 | $62,300 | $43,000 |
| 60 | Field office, type B (619E16010) | MNTH | 7 | $800.00 | $1,700.00 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $22,000 |
| 62 | Mobilization (624E10000) | LS | 1 | $50,000 | $26,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 17, 2026. Compiled by Mirage Metrics.