ODOT contract 260284 bid tabulation
COL-SR 9/SR 14-14.23/03.65 (TWO LANE RESURFACING). Let by Ohio DOT on June 11, 2026, COL. 4 bids received; low bid $737,081 by Shelly & Sands Inc, -7.5% against the engineer's estimate of $797,000.
- Owner
- Ohio DOT
- Letting
- 11 JUN 2026
- Pay items
- 35
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $737,081 | Low | -8.0% |
| 2 | Karvo Companies Inc | $825,455 | +12% | +4.0% |
| 3 | Shelly Company | $844,464 | +15% | +6.0% |
| 4 | Phillips Paving LLC | $927,029 | +26% | +16% |
Engineer's estimate: $797,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Karvo Companies Inc | 3. Shelly Company | 4. Phillips Paving LLC |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 577 | $15.00 | $15.00 | $20.00 | $5.00 |
| 2 | Walk removed (202E30000) | SF | 129 | $15.00 | $25.00 | $18.50 | $10.00 |
| 3 | Curb removed (202E32000) | FT | 35 | $25.00 | $50.00 | $45.00 | $25.00 |
| 4 | Fence, misc.: temporary orange plastic constructio (607E98000) | FT | 88 | $15.00 | $5.00 | $7.00 | $10.00 |
| 5 | Curb ramp (608E52000) | SF | 129 | $50.00 | $50.00 | $90.00 | $100.00 |
| 6 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 7 | Aggregate drains (605E31100) | FT | 25 | $90.00 | $5.00 | $30.00 | $100.00 |
| 8 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 40 | $600.00 | $500.00 | $560.00 | $750.00 |
| 9 | Pavement repair (253E02000) | CY | 25 | $715.00 | $600.00 | $750.00 | $750.00 |
| 10 | Pavement planing, asphalt concrete, as per plan (2 (254E01001) | SY | 8,083 | $2.25 | $3.00 | $3.10 | $3.00 |
| 11 | Pavement planing, asphalt concrete, as per plan (3 (254E01001) | SY | 19,790 | $2.50 | $3.00 | $3.35 | $4.00 |
| 12 | Non-tracking tack coat (407E20000) | GAL | 3,885 | $3.05 | $3.00 | $2.50 | $2.00 |
| 13 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 968 | $230.00 | $250.00 | $250.00 | $250.00 |
| 14 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 1,186 | $180.00 | $200.00 | $200.00 | $200.00 |
| 15 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 20 | $900.00 | $500.00 | $1,500.00 | $750.00 |
| 16 | Lane line, 6" (644E00204) | MI | 0.45 | $2,200.00 | $2,250.00 | $2,250.00 | $2,250.00 |
| 17 | Center line (644E00300) | MI | 1.53 | $4,100.00 | $5,250.00 | $5,250.00 | $5,250.00 |
| 18 | Channelizing line, 8" (644E00400) | FT | 1,986 | $1.30 | $2.00 | $2.00 | $2.00 |
| 19 | Stop line (644E00500) | FT | 242 | $11.00 | $7.75 | $7.75 | $7.75 |
| 20 | Crosswalk line, 12", as per plan (644E00621) | FT | 744 | $9.00 | $8.00 | $8.00 | $8.00 |
| 21 | Transverse/diagonal line (644E00700) | FT | 157 | $11.00 | $7.75 | $7.75 | $7.75 |
| 22 | Lane arrow (644E01300) | EACH | 34 | $125.00 | $125.00 | $125.00 | $125.00 |
| 23 | Two way left turn arrow (644E01370) | EACH | 5 | $170.00 | $250.00 | $250.00 | $250.00 |
| 24 | Yield line (644E20800) | FT | 24 | $11.00 | $20.00 | $20.00 | $20.00 |
| 25 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 180 | $115.00 | $130.00 | $100.00 | $100.00 |
| 26 | Work zone marking sign (614E12460) | EACH | 9 | $105.00 | $75.00 | $75.00 | $75.00 |
| 27 | Work zone lane line, class II, 6", 642 paint (614E20510) | MI | 1.26 | $500.00 | $500.00 | $500.00 | $500.00 |
| 28 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.26 | $500.00 | $500.00 | $500.00 | $500.00 |
| 29 | Work zone center line, class II, 642 paint (614E21500) | MI | 4.59 | $750.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 30 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.59 | $900.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 31 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 5,958 | $0.75 | $0.65 | $0.65 | $0.65 |
| 32 | Work zone stop line, class III, 642 paint (614E26610) | FT | 726 | $3.00 | $3.50 | $3.50 | $3.50 |
| 33 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,000.00 | $15,000 | $5,000.00 | $20,000 |
| 34 | Maintaining traffic (614E11000) | LS | 1 | $53,672 | $27,000 | $75,000 | $115,000 |
| 35 | Mobilization (624E10000) | LS | 1 | $20,000 | $73,366 | $20,000 | $52,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 11, 2026. Compiled by Mirage Metrics.