ODOT contract 260310 bid tabulation

CUY-SR 10-01.97 (FOUR LANE RESURFACING). Let by Ohio DOT on June 25, 2026, CUY. 4 bids received; low bid $4,357,635 by Ronyak Paving Inc, -3.2% against the engineer's estimate of $4,501,000.

Owner
Ohio DOT
Letting
25 JUN 2026
Pay items
132
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ronyak Paving Inc$4,357,635Low-3.0%
2Perk Company Inc$4,595,464+5.0%+2.0%
3Karvo Companies Inc$4,975,297+14%+11%
4Shelly Company$5,061,501+16%+12%
ODOT contract 260310: bids by rank

Engineer's estimate: $4,501,000.

Bid tabulation

LinePay itemUnitQuantity1. Ronyak Paving Inc2. Perk Company Inc3. Karvo Companies Inc4. Shelly Company
1Pavement removed (202E23000)SY1,480$20.00$22.00$30.00$20.00
2Walk removed, as per plan (202E30001)SF8,412$2.00$2.50$8.00$2.00
3Curb removed, as per plan (202E32001)FT3,950$12.00$5.00$30.00$12.00
4Pipe removed, 24" and under (202E35100)FT12$30.00$45.00$25.00$30.00
5Excavation (203E10000)CY207$50.00$35.00$100.00$50.00
6Subgrade compaction (204E10000)SY1,240$1.00$2.00$1.00$1.00
7Excavation of subgrade (204E13000)CY25$75.00$45.00$15.00$75.00
8Granular embankment, as per plan (204E21001)CY12$50.00$150.00$35.00$50.00
9Granular material, type B (204E30010)CY25$50.00$150.00$75.00$50.00
10Geotextile fabric (204E50000)SY50$3.00$3.50$2.00$3.00
11Geogrid (204E51000)SY50$2.00$6.00$2.00$2.00
124" concrete walk, as per plan (608E10001)SF4,159$12.00$16.50$15.00$12.00
136" concrete walk, as per plan (608E13001)SF415$13.00$25.00$20.00$13.00
14Curb ramp, as per plan (608E52001)SF3,790$25.00$28.50$25.00$25.00
15Walkway, misc.: colored & stamped concrete walk (608E98000)SF150$50.00$60.00$25.00$50.00
16Walkway, misc.: paver replacement (608E98000)SF150$25.00$60.00$50.00$25.00
17Monument assembly adjusted to grade, as per plan (623E39501)EACH17$700.00$1,300.00$1,250.00$700.00
18Monument, misc.:cuy county centerline monument box (623E40900)EACH5$1,550.00$1,300.00$1,650.00$1,000.00
19Monument, misc.:cuy county monument box (623E40900)EACH5$1,550.00$1,300.00$1,650.00$1,000.00
20Monument, misc.:monument referencing (623E40900)EACH17$400.00$125.00$250.00$400.00
21Topsoil furnished and placed (653E10000)CY90$90.00$75.00$100.00$90.00
22Erosion control, as per plan (832E30001)EACH5,000$1.00$1.00$1.00$1.00
236" base pipe underdrains with geotextile fabric (605E14020)FT500$17.00$6.00$20.00$17.00
246" conduit, type F for underdrain outlets (611E00510)FT100$20.00$6.00$5.00$20.00
2512" conduit, type B, as per plan (611E04401)FT235$250.00$385.65$150.00$185.00
2612" conduit, type B, as per plan (611E04401)FT71$285.00$424.60$175.00$195.00
2715" conduit, type B, as per plan (611E05901)FT12$500.00$447.10$250.00$250.00
28Catch basin, no. 3A (611E98180)EACH4$5,500.00$8,200.50$7,500.00$5,500.00
29Catch basin adjusted to grade, as per plan (611E98631)EACH18$1,050.00$1,650.00$1,775.00$1,050.00
30Catch basin reconstructed to grade, as per plan (611E98635)EACH18$1,250.00$1,950.00$2,200.00$1,250.00
31Manhole, no. 3 (611E99574)EACH1$7,700.00$11,330$7,500.00$7,700.00
32Manhole adjusted to grade, as per plan (611E99655)EACH7$1,075.00$1,650.00$1,500.00$1,075.00
33Manhole reconstructed to grade, as per plan (611E99661)EACH21$1,225.00$1,950.00$2,000.00$1,225.00
34Special - miscellaneous metal (611E99820)LB48,320$2.00$2.45$2.00$2.00
35Partial depth pavement repair (441), as per plan (251E01001)SY1,435$85.00$44.00$80.00$80.00
36Partial depth pavement repair (441), as per plan (251E01001)SY2,700$80.00$42.00$60.00$100.00
37Pavement repair, as per plan (253E02001)CY1,100$450.00$238.00$200.00$400.00
38Pavement planing, asphalt concrete, as per PLAN3" (254E01001)SY62,674$5.00$5.75$6.00$3.15
39Full depth pavement removal and rigid replacement, type 1, class QC MS, as per plan (255E15001)SY100$435.00$325.00$300.00$330.00
40Full depth pavement sawing (255E20000)FT250$6.00$7.50$5.00$5.50
41Aggregate base, as per plan (304E20001)CY224$100.00$74.50$100.00$100.00
429" concrete base, class QC 1P (305E13010)SY23$500.00$435.00$200.00$500.00
43Non-tracking tack coat (407E20000)GAL3,453$3.00$3.20$3.00$2.75
44Aggregate, single chip seal, type A (422E11000)SY62,765$1.00$2.25$0.50$2.00
45Emulsion, chip seal (422E25000)GAL25,106$2.00$3.00$5.00$3.00
46Asphalt concrete surface course, type 1, (448), as per plan (441E50101)CY2,180$265.00$278.00$300.00$280.00
47Asphalt concrete intermediate course, type 2, (448) (441E50300)CY3,052$205.00$268.00$250.00$220.00
486" non-reinforced concrete pavement, class QC MS (452E10050)SY40$85.00$165.00$100.00$85.00
498" non-reinforced concrete pavement, class QC MS (452E12050)SY1,200$85.00$155.00$115.00$85.00
50Curb, type 2-B (609E16000)FT297$25.00$77.00$60.00$25.00
51Curb, type 6, as per plan (609E26001)FT3,528$40.00$10.00$35.00$40.00
52Longitudinal joint adhesive (875E10000)LB5,796$3.00$3.00$1.00$4.00
53Valve box adjusted to grade, as per plan (638E10801)EACH88$700.00$1,100.00$1,200.00$700.00
54Water work, misc.: water manhole adjusted to grade (638E98000)EACH1$1,000.00$1,850.00$1,200.00$1,000.00
55Ground mounted support, no. 3 post (630E03100)FT30$150.00$15.00$10.00$15.00
56Sign hanger assembly, mast arm, as per plan (630E79101)EACH2$550.00$550.00$525.00$550.00
57Sign support assembly, pole mounted (630E79500)EACH8$105.00$105.00$125.00$105.00
58Sign, flat sheet (630E80100)SF54$18.00$18.00$25.00$18.00
59Channelizing line, 8" (644E00400)FT1,701$1.05$1.05$2.50$1.05
60Stop line (644E00500)FT1,012$9.00$9.00$7.25$9.00
61Crosswalk line, 12" (644E00620)FT366$4.50$4.50$6.00$4.50
62Crosswalk line, 12", as per plan (644E00621)FT3,329$4.50$4.50$6.00$4.50
63Crosswalk line, 24", as per plan (644E00631)FT3,340$8.50$8.50$7.25$8.50
64Transverse/diagonal line (644E00700)FT157$8.50$8.50$7.25$8.50
65Island marking (644E00900)SF60$4.50$4.50$7.25$4.50
66School symbol marking, 120" (644E01120)EACH2$950.00$950.00$550.00$950.00
67Lane arrow (644E01300)EACH62$105.00$105.00$125.00$105.00
68Dotted line, 4" (644E01500)FT153$3.00$3.00$1.50$3.00
69Edge line, 4" (646E10000)MI0.02$4,500.00$4,500.00$3,800.00$4,500.00
70Lane line, 4" (646E10100)MI3.38$2,800.00$2,800.00$1,930.00$2,800.00
71Center line (646E10200)MI2.61$5,100.00$5,100.00$4,424.00$5,100.00
72Conduit, 2", 725.051 (625E25408)FT48$7.50$7.50$7.50$7.50
73Conduit, 3", 725.051 (625E25504)FT5$9.50$9.50$9.50$9.50
74Conduit, jacked or drilled, 725.051, 3" (625E25906)FT79$95.00$95.00$95.00$95.00
75Trench (625E29000)FT53$15.00$15.00$15.00$15.00
76Pull box, 725.08, 18" (625E30700)EACH4$950.00$950.00$950.00$950.00
77Pull box, 725.08, 24" (625E30706)EACH1$1,250.00$1,250.00$1,250.00$1,250.00
78Pull box, misc.: adjust to grade (625E31600)EACH6$400.00$400.00$400.00$400.00
79Ground rod, as per plan (625E32001)EACH6$350.00$350.00$350.00$350.00
80Underground warning/marking tape, as per plan (625E36011)FT53$3.50$3.50$3.50$3.50
81Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH2$675.00$675.00$675.00$675.00
82Pedestrian pushbutton, as per plan (632E26001)EACH2$325.00$325.00$325.00$325.00
83Signal cable, 2 conductor, no. 14 AWG (632E40200)FT164$1.60$1.60$1.60$1.60
84Signal cable, 5 conductor, no. 14 AWG (632E40500)FT186$1.85$1.85$1.85$1.85
85Signal cable, 7 conductor, no. 14 AWG (632E40700)FT456$2.25$2.25$2.25$2.25
86Signal support foundation (632E64010)EACH2$7,200.00$7,200.00$7,200.00$7,200.00
87Pedestal foundation (632E64020)EACH2$2,100.00$2,100.00$2,100.00$2,100.00
88Power cable, 2 conductor, no. 6 AWG (632E68200)FT30$6.00$6.00$6.00$6.00
89Service cable, 3 conductor, no. 6 AWG (632E69800)FT50$9.00$9.00$9.00$9.00
90Power service, as per plan (632E70001)EACH1$3,100.00$3,100.00$3,100.00$3,100.00
91Conduit riser, 3" diameter (632E70600)EACH1$350.00$350.00$350.00$350.00
92Signal support, type TC-81.22, design 4, as per plan (632E72111)EACH2$15,420$15,420$15,420$15,420
93Pedestal, 14.4' tall, transformer base (632E89930)EACH2$2,700.00$2,700.00$2,700.00$2,700.00
94Signalization, misc.: foundation test hole (632E90400)EACH5$600.00$600.00$600.00$600.00
95Signalization, misc.: pedestrian hybrid beacon (632E90400)EACH4$1,500.00$1,500.00$1,500.00$1,500.00
96Cabinet foundation, as per plan (633E67101)EACH1$3,800.00$3,800.00$3,800.00$3,800.00
97Controller work pad, as per plan (633E67201)EACH1$900.00$900.00$900.00$900.00
98Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH1$8,800.00$8,800.00$8,800.00$8,800.00
99Controller item, misc.:controlled, actuated, 8 pha (633E99000)EACH1$20,325$20,325$20,325$20,325
100Mulch (661E00500)CY16$75.00$62.90$75.00$75.00
101Perennials hemerocallis 'going bananas' (going ban (661E14000)EACH42$50.00$17.70$60.00$60.00
102Perennials liriope muscari 'royal purple' (royal P (661E14000)EACH120$50.00$17.40$80.00$80.00
103Perennials nepeta X faassenii 'walkers low' (walke (661E14000)EACH72$50.00$24.60$60.00$60.00
104Deciduous shrub, 12" height, rhus aromatica 'gro-L (661E19000)EACH32$150.00$59.15$120.00$120.00
105Law enforcement officer with patrol car for assistance (614E11110)HR400$125.00$110.00$125.00$130.00
106Work zone lane line, class I, 4", 642 paint (614E20100)MI4.46$600.00$600.00$725.00$600.00
107Work zone lane line, class III, 4", 642 paint (614E20550)MI1.67$600.00$600.00$575.00$600.00
108Work zone center line, class I, 642 paint (614E21100)MI6.76$1,300.00$1,300.00$1,500.00$1,300.00
109Work zone center line, class I, 740.06, type I (614E21200)MI0.61$15,700$15,700$13,500$15,700
110Work zone center line, class III, 642 paint (614E21550)MI1.24$1,300.00$1,300.00$1,500.00$1,300.00
111Work zone edge line, class I, 4", 642 paint (614E22100)MI6.18$900.00$900.00$1,150.00$900.00
112Work zone edge line, class I, 4", 740.06, type I (614E22200)MI0.94$8,300.00$8,300.00$10,000$8,300.00
113Work zone channelizing line, class I, 8", 642 paint (614E23200)FT4,945$1.05$1.05$0.80$1.05
114Work zone channelizing line, class III, 8", 642 paint (614E23680)FT1,138$1.05$1.05$0.80$1.05
115Work zone dotted line, class III, 4", 642 paint (614E24610)FT153$3.00$3.00$0.75$3.00
116Work zone transverse/diagonal line, class I, 642 paint (614E25200)FT316$2.70$2.70$2.50$2.70
117Work zone stop line, class I, 642 paint (614E26200)FT1,589$5.00$5.00$4.00$5.00
118Work zone stop line, class III, 642 paint (614E26610)FT721$5.00$5.00$4.00$5.00
119Work zone crosswalk line, class I, 12", 642 paint (614E27050)FT1,468$2.50$2.50$3.75$2.50
120Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT2,097$2.50$2.50$3.75$2.50
121Work zone arrow, class I, 642 paint (614E30200)EACH190$75.00$75.00$65.00$75.00
122Work zone arrow, class I, 740.06, type I (614E30400)EACH5$120.00$120.00$250.00$120.00
123Work zone arrow, class III, 642 paint (614E30650)EACH31$75.00$75.00$65.00$75.00
124Work zone island marking, class I (614E32700)SF150$2.00$2.00$5.00$2.00
125Work zone island marking, class III, 642 paint (614E32800)SF30$2.00$2.00$5.00$2.00
126Water (616E10000)MGAL10$10.00$1.00$5.00$20.00
127Calcium chloride (616E20000)TON1$1.00$300.00$25.00$100.00
128Premium for contract performance bond and for payment bond (103E05000)LS1$25,985$45,500$50,000$25,000
129Maintaining traffic (614E11000)LS1$300,000$274,069$349,000$871,500
130Field office, type B, as per plan (619E16011)MNTH12$1,500.00$2,500.00$3,000.00$5,000.00
131Construction layout stakes and surveying, as per plan (623E10001)LS1$20,950$12,500$35,000$25,000
132Mobilization (624E10000)LS1$121,000$250,000$415,000$200,000
ODOT contract 260310: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy