| 1 | Guardrail removed (202E38000) | FT | 17,088 | $2.00 | $2.00 | $2.00 |
| 2 | Guardrail removed, barrier design (202E38300) | FT | 4,575 | $2.00 | $2.00 | $2.00 |
| 3 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $200.00 | $200.00 | $200.00 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 19 | $200.00 | $200.00 | $200.00 |
| 5 | Anchor assembly removed, type B (202E42050) | EACH | 1 | $200.00 | $200.00 | $200.00 |
| 6 | Bridge terminal assembly removed (202E47000) | EACH | 19 | $200.00 | $200.00 | $200.00 |
| 7 | Impact attenuator removed (202E47800) | EACH | 4 | $350.00 | $350.00 | $350.00 |
| 8 | Excavation (203E10000) | CY | 50 | $75.00 | $75.00 | $25.00 |
| 9 | Reshaping under guardrail, as per plan (209E15001) | STA | 181 | $75.00 | $75.00 | $75.00 |
| 10 | Linear grading, as per plan (209E60201) | STA | 200 | $150.00 | $80.00 | $25.00 |
| 11 | Guardrail, type MGS (606E15050) | FT | 17,088 | $21.40 | $21.40 | $21.40 |
| 12 | Guardrail, barrier design, type MGS (606E15550) | FT | 7,100 | $30.00 | $30.00 | $30.00 |
| 13 | Anchor assembly, type B (606E26000) | EACH | 1 | $2,375.00 | $2,375.00 | $2,375.00 |
| 14 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,450.00 | $2,450.00 | $2,450.00 |
| 15 | Anchor assembly, MGS type T (606E26550) | EACH | 18 | $1,425.00 | $1,425.00 | $1,425.00 |
| 16 | Bridge terminal assembly, type 1 (606E35000) | EACH | 11 | $2,225.00 | $2,225.00 | $2,225.00 |
| 17 | Bridge terminal assembly, type 2 (606E35100) | EACH | 8 | $700.00 | $700.00 | $700.00 |
| 18 | Impact attenuator, type 1 (unidirectional) (606E60002) | EACH | 5 | $14,000 | $9,850.00 | $9,850.00 |
| 19 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 |
| 20 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 9 | $1,125.00 | $1,125.00 | $3,000.00 |
| 21 | Inlet adjusted to grade, as per plan (611E99151) | EACH | 12 | $2,900.00 | $2,900.00 | $3,000.00 |
| 22 | Partial depth pavement repair (442), as per plan (251E01021) | SY | 3,650 | $40.00 | $60.00 | $80.00 |
| 23 | Partial depth pavement repair (442), as per plan (251E01021) | SY | 2,970 | $50.00 | $100.00 | $125.00 |
| 24 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 228,204 | $2.25 | $2.00 | $4.75 |
| 25 | Full depth pavement removal and rigid replacement, type 1, class QC RS, as per plan (255E19001) | SY | 1,000 | $400.00 | $400.00 | $535.00 |
| 26 | Full depth pavement removal and rigid replacement, type 1, class QC RS, as per plan (255E19001) | SY | 160 | $375.00 | $400.00 | $535.00 |
| 27 | Full depth pavement sawing (255E20000) | FT | 9,932 | $5.25 | $5.25 | $4.00 |
| 28 | Aggregate base (304E20000) | CY | 50 | $90.00 | $90.00 | $25.00 |
| 29 | Non-tracking tack coat (407E20000) | GAL | 18,526 | $2.50 | $2.75 | $3.00 |
| 30 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 672 | $445.00 | $350.00 | $275.00 |
| 31 | Anti-segregation equipment (442E00100) | CY | 6,573 | $1.00 | $10.00 | $12.00 |
| 32 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 881 | $345.00 | $320.00 | $325.00 |
| 33 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 8,628 | $345.00 | $265.00 | $250.00 |
| 34 | Asphalt concrete curb, type 1, as per plan (609E10001) | FT | 200 | $25.00 | $70.00 | $50.00 |
| 35 | Curb, type 4-C (609E24510) | FT | 216 | $60.00 | $60.00 | $45.00 |
| 36 | Compacted aggregate, as per plan (617E10101) | CY | 300 | $75.00 | $120.00 | $200.00 |
| 37 | Rumble strips, shoulder (asphalt concrete), as per plan (618E40601) | MI | 11.88 | $1,150.00 | $1,150.00 | $1,150.00 |
| 38 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 24.14 | $1,425.00 | $1,425.00 | $1,425.00 |
| 39 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 4,111 | $0.75 | $0.75 | $0.75 |
| 40 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 6,880 | $1.15 | $1.15 | $1.15 |
| 41 | Grooving for 6" recessed pavement marking, (concrete) (850E20110) | FT | 3,344 | $1.10 | $1.10 | $1.10 |
| 42 | Void reducing asphalt membrane (vram) (872E10000) | FT | 6,215.62 | $4.50 | $4.50 | $1.00 |
| 43 | Delineator, post ground mounted (620E00500) | EACH | 1 | $200.00 | $150.00 | $150.00 |
| 44 | RPM (621E00100) | EACH | 1,147 | $44.00 | $44.00 | $44.00 |
| 45 | Raised pavement marker removed (621E54000) | EACH | 1,147 | $1.00 | $5.00 | $1.00 |
| 46 | Barrier reflector, type 2, one way (626E00110) | EACH | 165.50 | $13.00 | $13.00 | $13.00 |
| 47 | Stop line (646E10400) | FT | 96 | $12.50 | $12.50 | $12.50 |
| 48 | Crosswalk line, 12" (646E10510) | FT | 190 | $6.00 | $6.00 | $6.00 |
| 49 | Lane arrow (646E20300) | EACH | 31 | $165.00 | $165.00 | $165.00 |
| 50 | Wrong way arrow (646E20320) | EACH | 2 | $225.00 | $225.00 | $225.00 |
| 51 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 13.56 | $4,585.00 | $4,585.00 | $4,585.00 |
| 52 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 11.21 | $1,770.00 | $1,770.00 | $1,770.00 |
| 53 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 6,880 | $2.00 | $2.00 | $2.00 |
| 54 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 4,111 | $1.55 | $1.55 | $1.55 |
| 55 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 6 | $625.00 | $625.00 | $625.00 |
| 56 | Detector loop, as per plan (632E26501) | EACH | 6 | $1,650.00 | $1,650.00 | $1,650.00 |
| 57 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $125.00 | $100.00 | $144.94 |
| 58 | Work zone increased penalties sign (614E12484) | EACH | 6 | $200.00 | $200.00 | $200.00 |
| 59 | Asphalt concrete for maintaining traffic, as per plan (614E13001) | CY | 100 | $200.00 | $120.00 | $315.85 |
| 60 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $850.00 | $850.00 | $850.00 |
| 61 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 11.21 | $675.00 | $675.00 | $675.00 |
| 62 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 11.21 | $675.00 | $675.00 | $675.00 |
| 63 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 13.56 | $700.00 | $700.00 | $700.00 |
| 64 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 13.56 | $685.00 | $685.00 | $685.00 |
| 65 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 6,880 | $0.57 | $0.60 | $0.57 |
| 66 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 6,880 | $0.50 | $0.50 | $0.50 |
| 67 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 4,111 | $0.50 | $0.50 | $0.50 |
| 68 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 4,111 | $0.45 | $0.45 | $0.45 |
| 69 | Work zone stop line, class I, 642 paint (614E26200) | FT | 96 | $3.25 | $3.25 | $3.25 |
| 70 | Work zone stop line, class III, 642 paint (614E26610) | FT | 96 | $3.00 | $3.00 | $3.00 |
| 71 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 190 | $2.25 | $2.25 | $2.25 |
| 72 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 190 | $2.15 | $2.15 | $2.15 |
| 73 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 31 | $55.00 | $55.00 | $55.00 |
| 74 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 31 | $50.00 | $50.00 | $50.00 |
| 75 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 300 | $10.00 | $10.00 | $10.00 |
| 76 | Portable non-intrusive traffic sensor, class II (896E00012) | SNMT | 24 | $475.00 | $475.00 | $475.00 |
| 77 | Portable changeable message sign, as per plan (896E00021) | SNMT | 6 | $1,000.00 | $1,000.00 | $1,000.00 |
| 78 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $27,000 | $40,000 | $60,000 |
| 79 | CPM progress schedule (108E10000) | LS | 1 | $2,000.00 | $15,000 | $10,000 |
| 80 | Maintaining traffic (614E11000) | LS | 1 | $280,427 | $990,550 | $800,000 |
| 81 | Field office, type B, as per plan (619E16011) | MNTH | 6 | $2,200.00 | $8,000.00 | $3,000.00 |
| 82 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,000.00 | $20,000 | $15,000 |
| 83 | Mobilization (624E10000) | LS | 1 | $347,000 | $200,000 | $750,000 |