ODOT contract 260457 bid tabulation
COL-SR 518-06.69 (TWO LANE RESURFACING). Let by Ohio DOT on October 15, 2026, COL. 4 bids received; low bid $1,403,113 by Shelly & Sands Inc, -14% against the engineer's estimate of $1,623,000.
- Owner
- Ohio DOT
- Letting
- 15 OCT 2026
- Pay items
- 30
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $1,403,113 | Low | -14% |
| 2 | Karvo Companies Inc | $1,675,434 | +19% | +3.0% |
| 3 | NLS Paving, Inc | $1,683,829 | +20% | +4.0% |
| 4 | Shelly Company | $1,697,884 | +21% | +5.0% |
Engineer's estimate: $1,623,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Karvo Companies Inc | 3. NLS Paving, Inc | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 861 | $10.00 | $22.00 | $14.00 | $4.00 |
| 2 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 8.82 | $1,200.00 | $125.00 | $2,500.00 | $2,250.00 |
| 3 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 1 | $4,000.00 | $4,000.00 | $2,500.00 | $2,000.00 |
| 4 | Special - mailbox support system, single (690E50100) | EACH | 1 | $940.00 | $880.00 | $450.00 | $200.00 |
| 5 | Special - mailbox support system, double (690E50200) | EACH | 1 | $1,350.00 | $975.00 | $500.00 | $300.00 |
| 6 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 7 | Aggregate drains (605E31100) | FT | 60 | $30.00 | $55.00 | $25.00 | $30.00 |
| 8 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 20 | $875.00 | $500.00 | $700.00 | $580.00 |
| 9 | Pavement repair (253E02000) | CY | 60 | $890.00 | $500.00 | $710.00 | $730.00 |
| 10 | Pavement planing, asphalt concrete, 2.25" (254E01000) | SY | 66,995 | $1.00 | $2.28 | $2.65 | $3.00 |
| 11 | Tack coat (407E10000) | GAL | 9,379 | $2.00 | $3.50 | $3.25 | $3.00 |
| 12 | Prime coat, as per plan (408E10001) | GAL | 3,750 | $3.05 | $6.00 | $5.00 | $4.25 |
| 13 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 2,399 | $217.00 | $260.00 | $250.00 | $255.00 |
| 14 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 1,862 | $211.00 | $250.00 | $235.00 | $220.00 |
| 15 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 30 | $675.00 | $825.00 | $600.00 | $600.00 |
| 16 | Compacted aggregate, as per plan (617E10101) | CY | 325 | $100.00 | $130.00 | $90.00 | $100.00 |
| 17 | Shoulder preparation, as per plan (617E20001) | SY | 10,271 | $2.00 | $0.50 | $2.35 | $0.65 |
| 18 | RPM (621E00100) | EACH | 576 | $36.00 | $33.80 | $36.00 | $33.80 |
| 19 | Raised pavement marker removed (621E54000) | EACH | 576 | $5.00 | $1.00 | $8.00 | $9.50 |
| 20 | Edge line, 6" (646E10010) | MI | 8.70 | $3,318.00 | $3,280.00 | $3,318.00 | $3,280.00 |
| 21 | Center line (646E10200) | MI | 4.35 | $4,244.00 | $4,065.00 | $4,244.00 | $4,065.00 |
| 22 | Stop line (646E10400) | FT | 28 | $30.00 | $15.00 | $30.00 | $14.10 |
| 23 | Work zone marking sign (614E12460) | EACH | 21 | $98.00 | $105.00 | $90.00 | $90.00 |
| 24 | Work zone center line, class II, 642 paint (614E21500) | MI | 13.14 | $900.00 | $855.00 | $500.00 | $855.00 |
| 25 | Work zone center line, class III, 642 paint (614E21550) | MI | 13.14 | $900.00 | $1,285.00 | $935.00 | $1,285.00 |
| 26 | Work zone stop line, class III, 642 paint (614E26610) | FT | 28 | $5.00 | $7.50 | $14.00 | $7.50 |
| 27 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,000.00 | $14,566 | $8,500.00 | $10,000 |
| 28 | Maintaining traffic (614E11000) | LS | 1 | $66,348 | $50,000 | $100,000 | $132,500 |
| 29 | Field office, type B (619E16010) | MNTH | 3 | $4,000.00 | $3,000.00 | $2,850.00 | $2,000.00 |
| 30 | Mobilization (624E10000) | LS | 1 | $40,000 | $65,000 | $40,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.