ODOT contract 250091 bid tabulation
LAK-Metroparks Lakefront Phase 2 (SIDEWALK). Let by Ohio DOT on February 13, 2025, LAK. 2 bids received; low bid $1,197,820 by Marucci & Gaffney Excavating Co, +12% against the engineer's estimate of $1,068,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 40
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Marucci & Gaffney Excavating Co | $1,197,820 | Low | +12% |
| 2 | S E T Inc | $1,524,715 | +27% | +43% |
Engineer's estimate: $1,068,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Marucci & Gaffney Excavating Co | 2. S E T Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $90,000 | $40,000 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 8 | $50.00 | $45.00 |
| 3 | Fence removed, as per plan (202E75001) | FT | 148 | $25.00 | $25.00 |
| 4 | Excavation (203E10000) | CY | 15,057 | $35.00 | $35.00 |
| 5 | Embankment (203E20000) | CY | 7,436 | $25.00 | $22.00 |
| 6 | Subgrade compaction (204E10000) | SY | 1,142 | $5.00 | $2.00 |
| 7 | Proof rolling (204E45000) | HR | 2 | $80.00 | $300.00 |
| 8 | Fence, type CLT, as per plan (607E23001) | FT | 900 | $35.00 | $36.00 |
| 9 | Fence, misc.:timber railing (607E98000) | FT | 778 | $53.00 | $55.00 |
| 10 | Special - top of bluff grading (690E98400) | LS | 1 | $20,000 | $205,000 |
| 11 | Special - excavate and replace (690E98700) | CY | 58 | $90.00 | $125.00 |
| 12 | Rock channel protection, type C with filter (601E32200) | CY | 16 | $250.00 | $225.00 |
| 13 | Topsoil furnished and placed (653E10000) | CY | 959 | $44.00 | $85.00 |
| 14 | Soil analysis test (659E00100) | EACH | 2 | $10.00 | $150.00 |
| 15 | Seeding and mulching, class 1 (659E00500) | SY | 344 | $10.00 | $4.00 |
| 16 | Commercial fertilizer (659E20000) | TON | 1.10 | $200.00 | $1,200.00 |
| 17 | Lime (659E31000) | ACRE | 2.40 | $20.00 | $200.00 |
| 18 | Water (659E35000) | MGAL | 62 | $0.01 | $10.00 |
| 19 | Seeding, misc.:native slope seeding mix (659E98000) | SY | 11,153 | $2.25 | $4.00 |
| 20 | Erosion control mat, type E (671E15040) | SY | 11,497 | $2.75 | $4.00 |
| 21 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,000.00 | $3,000.00 |
| 22 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $2,400.00 | $4,000.00 |
| 23 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $6,000.00 | $10,000 |
| 24 | Erosion control (832E30000) | EACH | 26,178 | $1.00 | $1.00 |
| 25 | Concrete masonry (602E20000) | CY | 0.42 | $6,500.00 | $5,000.00 |
| 26 | 4" base pipe underdrains with geotextile fabric (605E06020) | FT | 751 | $15.00 | $25.00 |
| 27 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 40 | $20.00 | $30.00 |
| 28 | 12" conduit, type D (611E04900) | FT | 58 | $150.00 | $75.00 |
| 29 | Inlet, misc.:yard drain (611E99500) | EACH | 2 | $1,200.00 | $4,000.00 |
| 30 | Drainage structure, misc.:cleanout (611E99900) | EACH | 5 | $250.00 | $1,000.00 |
| 31 | Aggregate base (304E20000) | CY | 161 | $125.00 | $100.00 |
| 32 | Non-tracking tack coat (407E20000) | GAL | 50 | $3.20 | $4.00 |
| 33 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 31 | $403.00 | $420.00 |
| 34 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 44 | $406.00 | $420.00 |
| 35 | Water (616E10000) | MGAL | 53 | $0.01 | $10.00 |
| 36 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $15,000 |
| 37 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $5,000.00 | $4,000.00 |
| 38 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $40,000 |
| 39 | Construction layout stakes and surveying (623E10000) | LS | 1 | $9,500.00 | $30,000 |
| 40 | Mobilization (624E10000) | LS | 1 | $40,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.