ODOT contract 250492 bid tabulation
D03-BH FY2026(A) (BRIDGE REPAIR). Let by Ohio DOT on October 23, 2025, District 3. 4 bids received; low bid $353,609 by BCC Ohio Inc, -12% against the engineer's estimate of $400,000.
- Owner
- Ohio DOT
- Letting
- 23 OCT 2025
- Pay items
- 34
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $353,609 | Low | -12% |
| 2 | Ohio Concrete Maintenance LLC | $399,408 | +13% | 0.0% |
| 3 | Catts Construction Inc | $449,442 | +27% | +12% |
| 4 | Complete General Construction Company | $470,652 | +33% | +18% |
Engineer's estimate: $400,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Ohio Concrete Maintenance LLC | 3. Catts Construction Inc | 4. Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 2 | Partial depth pavement repair (442), as per plan (251E01031) | CY | 4 | $3,434.51 | $2,000.00 | $1,022.00 | $950.00 |
| 3 | Edge line, 6" (646E10010) | MI | 0.06 | $40,215 | $42,000 | $68,600 | $57,505 |
| 4 | Center line (646E10200) | MI | 0.03 | $58,275 | $60,000 | $91,645 | $76,815 |
| 5 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $89.25 | $125.00 | $50.00 | $95.00 |
| 6 | Detour signing (614E12420) | LS | 1 | $15,258 | $21,000 | $22,121 | $18,515 |
| 7 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $840.00 | $1,200.00 | $1,480.00 | $1,245.00 |
| 8 | Joint sealer (516E31000) | FT | 66 | $28.95 | $30.00 | $21.60 | $35.00 |
| 9 | Deep beam bridge retrofit railing (517E75600) | FT | 125 | $127.68 | $125.00 | $196.00 | $118.00 |
| 10 | Special - steel drip strip (518E22300) | FT | 108 | $23.87 | $30.00 | $44.00 | $16.75 |
| 11 | Latex modified concrete overlay (1.5") (847E10100) | SY | 213 | $190.44 | $250.00 | $148.00 | $225.00 |
| 12 | Latex modified concrete overlay (variable thickness), material only (847E20100) | CY | 7 | $1,147.50 | $1,100.00 | $1,103.00 | $800.00 |
| 13 | Test slab (847E30000) | LS | 1 | $4,848.00 | $5,500.00 | $1,025.00 | $3,000.00 |
| 14 | Full depth repair (847E30200) | CY | 2 | $1,405.50 | $1,000.00 | $1,220.00 | $2,000.00 |
| 15 | Existing concrete overlay removed (1.5") (847E30400) | SY | 213 | $23.40 | $40.00 | $25.00 | $26.00 |
| 16 | Hand chipping (847E50000) | SY | 12 | $196.13 | $150.00 | $229.00 | $100.00 |
| 17 | Removal misc.: steel drip strip (202E98200) | FT | 102 | $6.45 | $30.00 | $32.00 | $17.00 |
| 18 | Deep beam bridge retrofit railing (517E75600) | FT | 125 | $127.68 | $125.00 | $196.00 | $118.00 |
| 19 | Special - steel drip strip (518E22300) | FT | 126 | $23.84 | $35.00 | $47.00 | $16.75 |
| 20 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 432 | $77.34 | $108.00 | $137.60 | $110.00 |
| 21 | Surface preparation using hydrodemolition (848E20000) | SY | 432 | $103.97 | $93.00 | $86.00 | $160.00 |
| 22 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 7 | $367.50 | $400.00 | $281.00 | $300.00 |
| 23 | Hand chipping (848E50000) | SY | 22 | $187.60 | $145.00 | $210.00 | $100.00 |
| 24 | Test slab (848E50100) | LS | 1 | $2,463.00 | $500.00 | $500.00 | $1,500.00 |
| 25 | Portions of structure removed, as per plan (202E11301) | CY | 0.30 | $3,096.00 | $9,000.00 | $4,800.00 | $8,000.00 |
| 26 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 0.30 | $6,771.00 | $9,000.00 | $6,000.00 | $18,000 |
| 27 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $146.07 | $200.00 | $130.00 | $500.00 |
| 28 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 444 | $150.69 | $149.00 | $225.50 | $142.50 |
| 29 | Structure grounding system, as per plan (625E33001) | EACH | 1 | $8,280.00 | $15,000 | $10,737 | $15,000 |
| 30 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,334.68 | $10,000 | $4,970.00 | $4,000.00 |
| 31 | Maintaining traffic (614E11000) | LS | 1 | $6,243.60 | $20,000 | $23,620 | $64,000 |
| 32 | Field office, type B (619E16010) | MNTH | 6 | $4,278.75 | $1,000.00 | $2,500.00 | $4,262.60 |
| 33 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,640.00 | $4,000.00 | $300.00 | $7,000.00 |
| 34 | Mobilization (624E10000) | LS | 1 | $5,503.05 | $15,000 | $32,500 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.