ODOT contract 250210 bid tabulation
ATB-SR 7-31.10 (MINOR RECONSTRUCTION). Let by Ohio DOT on April 24, 2025, ATB. 1 bid received; low bid $2,803,417 by Catts Construction Inc, +17% against the engineer's estimate of $2,392,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 165
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Catts Construction Inc | $2,803,417 | Low | +17% |
Engineer's estimate: $2,392,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Catts Construction Inc |
|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,575.00 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 5,410 | $13.25 |
| 3 | Walk removed (202E30000) | SF | 12,812 | $1.20 |
| 4 | Curb removed (202E32000) | FT | 550 | $9.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 1,188 | $23.00 |
| 6 | Manhole removed (202E58000) | EACH | 7 | $320.00 |
| 7 | Catch basin or inlet removed (202E58300) | EACH | 16 | $320.00 |
| 8 | Monument assembly removed (202E60010) | EACH | 2 | $85.00 |
| 9 | Removal misc.:building awning (202E98100) | EACH | 1 | $5,500.00 |
| 10 | Excavation (203E10000) | CY | 980 | $46.00 |
| 11 | Embankment (203E20000) | CY | 25 | $53.00 |
| 12 | Subgrade compaction (204E10000) | SY | 5,458 | $1.50 |
| 13 | Proof rolling (204E45000) | HR | 4 | $290.00 |
| 14 | 4" concrete walk (608E10000) | SF | 12,193 | $8.15 |
| 15 | Curb ramp (608E52000) | SF | 721 | $20.00 |
| 16 | Monument assembly, type C (623E38500) | EACH | 2 | $947.00 |
| 17 | Special - as-built construction plans (690E91000) | LS | 1 | $3,125.00 |
| 18 | Special - preconstruction video documentation (690E98400) | LS | 1 | $600.00 |
| 19 | Special - survey control verification (690E98400) | LS | 1 | $3,600.00 |
| 20 | Soil analysis test (659E00100) | EACH | 2 | $60.00 |
| 21 | Topsoil (659E00300) | CY | 98 | $50.00 |
| 22 | Seeding and mulching (659E10000) | SY | 878 | $5.00 |
| 23 | Repair seeding and mulching (659E14000) | SY | 44 | $9.00 |
| 24 | Inter-seeding (659E15000) | SY | 44 | $9.00 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.12 | $8.33 |
| 26 | Lime (659E31000) | ACRE | 0.18 | $5.56 |
| 27 | Water (659E35000) | MGAL | 6 | $1.00 |
| 28 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,500.00 |
| 29 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $9,900.00 |
| 30 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $16,850 |
| 31 | Erosion control (832E30000) | EACH | 25,000 | $1.00 |
| 32 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 1,438 | $20.00 |
| 33 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 311 | $18.00 |
| 34 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 170 | $21.00 |
| 35 | 12" conduit, type B, as per plan (611E04401) | FT | 211 | $161.00 |
| 36 | 15" conduit, type B, as per plan (611E05901) | FT | 596 | $178.00 |
| 37 | 18" conduit, type B, as per plan (611E07401) | FT | 657 | $290.00 |
| 38 | Catch basin, no. 3 (611E98150) | EACH | 4 | $8,000.00 |
| 39 | Catch basin, no. 3A (611E98180) | EACH | 11 | $4,500.00 |
| 40 | Catch basin, no. 6 (611E98370) | EACH | 1 | $5,200.00 |
| 41 | Manhole, no. 3 (611E99574) | EACH | 7 | $7,950.00 |
| 42 | Manhole, no. 3 with 96" base I.D. and 9" weir (611E99584) | EACH | 1 | $14,975 |
| 43 | Special - miscellaneous metal (611E99820) | LB | 2,000 | $2.25 |
| 44 | Manufactured water quality structure, type 2 (895E10020) | EACH | 1 | $30,000 |
| 45 | Full depth pavement sawing (255E20000) | FT | 1,125 | $3.50 |
| 46 | Aggregate base (304E20000) | CY | 892 | $95.00 |
| 47 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 315 | $111.00 |
| 48 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 3,202 | $98.00 |
| 49 | 9" non-reinforced concrete pavement, class QC MS (452E13040) | SY | 1,702 | $118.00 |
| 50 | Non-reinforced concrete pavement, misc.:brick cros (452E19200) | SY | 248 | $173.00 |
| 51 | Curb, type 2-A (609E14000) | FT | 1,042 | $4.00 |
| 52 | Curb, type 6 (609E26000) | FT | 1,398 | $32.50 |
| 53 | Fire hydrant extended and adjusted to grade, as per plan (638E10301) | EACH | 1 | $4,700.00 |
| 54 | Valve box adjusted to grade (638E10800) | EACH | 12 | $375.00 |
| 55 | Manhole adjusted to grade (611E99654) | EACH | 5 | $750.00 |
| 56 | Connection, fused pull apart (625E00450) | EACH | 12 | $175.00 |
| 57 | Connection, unfused pull apart (625E00460) | EACH | 18 | $175.00 |
| 58 | Connection, unfused permanent (625E00480) | EACH | 15 | $140.00 |
| 59 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 7 | $4,720.00 |
| 60 | No. 4 AWG 600 volt distribution cable (625E23000) | FT | 4,945 | $4.25 |
| 61 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,200 | $2.45 |
| 62 | Conduit, 3", 725.051 (625E25504) | FT | 576 | $18.00 |
| 63 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 253 | $91.00 |
| 64 | Trench, 24" deep (625E29002) | FT | 536 | $14.50 |
| 65 | Pull box, 725.08, 18" (625E30700) | EACH | 10 | $1,331.00 |
| 66 | Ground rod (625E32000) | EACH | 9 | $363.00 |
| 67 | Power service, as per plan (625E34001) | EACH | 1 | $9,678.00 |
| 68 | Remove and reerect existing light pole, as per plan (625E35011) | EACH | 1 | $484.00 |
| 69 | Underground warning marking tape (625E36010) | FT | 536 | $4.25 |
| 70 | Light pole removed for storage, as per plan (625E75403) | EACH | 9 | $484.00 |
| 71 | Light pole foundation removed (625E75500) | EACH | 9 | $484.00 |
| 72 | Luminaire removed for storage, as per plan (625E75505) | EACH | 9 | $163.00 |
| 73 | Distribution cable removed, as per plan (625E75551) | FT | 750 | $1.25 |
| 77 | Light pole, decorative, as per plan (625E10481) | EACH | 6 | $20,690 |
| 78 | Light pole, decorative, as per plan (625E10481) | EACH | 1 | $17,180 |
| 79 | Luminaire, decorative, as per plan, LED, 40W, 4000 [alternate group AA2] (625E27551) | EACH | 6 | $3,025.00 |
| 80 | Luminaire, decorative, as per plan, LED, 80W, 4000 [alternate group AA2] (625E27551) | EACH | 6 | $3,025.00 |
| 81 | Ground mounted support, no. 3 post (630E03100) | FT | 361 | $14.50 |
| 82 | One way support, no. 3 post (630E08004) | FT | 12 | $17.00 |
| 83 | Street name sign support, no. 3 post (630E08520) | FT | 12 | $17.00 |
| 84 | Sign, flat sheet (630E80100) | SF | 173 | $17.00 |
| 85 | Sign, double faced, street name (630E80500) | EACH | 1 | $200.00 |
| 86 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $115.00 |
| 87 | Removal of ground mounted sign and delivery (630E85200) | EACH | 23 | $42.00 |
| 88 | Removal of ground mounted post support and disposal (630E86002) | EACH | 12 | $48.00 |
| 89 | Removal of overhead mounted sign and delivery (630E87450) | EACH | 11 | $102.00 |
| 90 | Removal of pole mounted sign and reerection (630E87520) | EACH | 1 | $115.00 |
| 91 | Removal of pole mounted sign and delivery (630E87550) | EACH | 22 | $36.00 |
| 92 | Edge line, 6" (646E10010) | MI | 0.49 | $6,292.00 |
| 93 | Center line (646E10200) | MI | 0.61 | $7,865.00 |
| 94 | Channelizing line, 12" (646E10310) | FT | 443 | $3.00 |
| 95 | Stop line (646E10400) | FT | 148 | $17.00 |
| 96 | Crosswalk line, 12" (646E10510) | FT | 500 | $9.00 |
| 97 | Transverse/diagonal line (646E10600) | FT | 51 | $13.00 |
| 98 | Island marking (646E10800) | SF | 68 | $4.85 |
| 99 | Parking lot stall marking (646E20200) | FT | 201 | $6.00 |
| 100 | Lane arrow (646E20300) | EACH | 8 | $223.00 |
| 101 | Two way left turn arrow (646E20370) | EACH | 3 | $393.00 |
| 102 | Shared lane marking (646E20650) | EACH | 12 | $393.00 |
| 103 | 4" conduit, type E (611E00400) | FT | 200 | $9.00 |
| 104 | Connection, fused pull apart (625E00450) | EACH | 4 | $133.00 |
| 105 | Connection, unfused pull apart (625E00460) | EACH | 8 | $133.00 |
| 106 | Connection, unfused permanent (625E00480) | EACH | 9 | $139.00 |
| 107 | Bracket arm, 8', as per plan (625E17961) | EACH | 4 | $1,179.00 |
| 108 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 987 | $3.50 |
| 109 | No. 10 AWG pole and bracket cable (625E23400) | FT | 636 | $2.50 |
| 110 | Conduit, 2", 725.051 (625E25408) | FT | 247 | $7.50 |
| 111 | Conduit, 3", 725.051 (625E25504) | FT | 85 | $10.00 |
| 112 | Conduit, 4", 725.051 (625E25604) | FT | 10 | $22.83 |
| 113 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 198 | $133.00 |
| 114 | Trench, 24" deep (625E29002) | FT | 337 | $17.00 |
| 115 | Pull box, 725.08, 18" (625E30700) | EACH | 3 | $1,149.00 |
| 116 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $1,512.00 |
| 117 | Ground rod (625E32000) | EACH | 9 | $423.00 |
| 118 | Sign attachment assembly, mast arm (630E79200) | EACH | 9 | $478.00 |
| 119 | Sign support assembly, pole mounted (630E79500) | EACH | 3 | $91.00 |
| 120 | Sign, flat sheet (630E80100) | SF | 106 | $17.00 |
| 121 | Sign, street name (630E80510) | EACH | 4 | $332.00 |
| 122 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 8 | $930.00 |
| 123 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 1 | $1,920.00 |
| 124 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $645.00 |
| 125 | Covering of vehicular signal head, as per plan (632E25001) | EACH | 9 | $49.00 |
| 126 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $49.00 |
| 127 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 8 | $280.00 |
| 128 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,116 | $2.40 |
| 129 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 455 | $2.80 |
| 130 | Signal support foundation, as per plan (632E64011) | EACH | 4 | $8,300.00 |
| 131 | Pedestal foundation (632E64020) | EACH | 4 | $1,330.00 |
| 132 | Loop detector lead-in cable (632E65200) | FT | 766 | $1.85 |
| 133 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 156 | $3.60 |
| 134 | Power service, as per plan (632E70001) | EACH | 1 | $4,420.00 |
| 135 | Combination signal support, type TC-81.22, design 4, as per plan (632E79111) | EACH | 4 | $25,261 |
| 136 | Pedestal, 8', transformer base, as per plan (632E89901) | EACH | 4 | $1,149.00 |
| 137 | Removal of traffic signal installation (632E90100) | EACH | 1 | $5,445.00 |
| 138 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $19,344 |
| 139 | Cabinet foundation (633E67100) | EACH | 1 | $1,332.00 |
| 140 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $9,226.00 |
| 141 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $10,418 |
| 142 | Atc controller (809E69122) | EACH | 1 | $8,349.00 |
| 144 | Luminaire, decorative, as per plan, LED, 80W, 4000 [alternate group AB2] (625E27551) | EACH | 4 | $3,025.00 |
| 145 | Traffic compacted surface, type A or B (410E12000) | CY | 100 | $70.00 |
| 146 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $108.00 |
| 147 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $513.00 |
| 148 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $1,270.00 |
| 149 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 0.09 | $725.00 |
| 150 | Work zone center line, class I, 642 paint (614E21100) | MI | 1.07 | $3,025.00 |
| 151 | Work zone center line, class I, 873 (614E21350) | MI | 0.33 | $20,200 |
| 152 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.44 | $1,025.00 |
| 153 | Work zone edge line, class I, 6", 873 (614E22326) | MI | 0.59 | $15,125 |
| 154 | Work zone channelizing line, class I, 12", 873 (614E23130) | FT | 198 | $1.80 |
| 155 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 468 | $1.15 |
| 156 | Work zone dotted line, class I, 6", 873 (614E24122) | FT | 125 | $4.25 |
| 157 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 125 | $3.60 |
| 158 | Work zone stop line, class I, 642 paint (614E26200) | FT | 216 | $5.45 |
| 159 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 161 | $12.00 |
| 160 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 9 | $90.79 |
| 161 | Work zone arrow, class I, 740.06, type I (614E30400) | EACH | 5 | $242.00 |
| 162 | Roads for maintaining traffic (615E10000) | LS | 1 | $24,269 |
| 163 | Pavement for maintaining traffic, class A (615E20000) | SY | 898 | $114.00 |
| 164 | Water (616E10000) | MGAL | 20 | $95.00 |
| 165 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $28,658 |
| 166 | Maintaining traffic (614E11000) | LS | 1 | $65,000 |
| 167 | Field office, type B (619E16010) | MNTH | 16 | $3,300.00 |
| 168 | Construction layout stakes and surveying (623E10000) | LS | 1 | $24,800 |
| 169 | Mobilization (624E10000) | LS | 1 | $36,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.