ODOT contract 260031 bid tabulation
CUY-SR 176-10.65 (MISCELLANEOUS). Let by Ohio DOT on January 15, 2026, CUY. 2 bids received; low bid $2,967,842 by Karvo Companies Inc, +22% against the engineer's estimate of $2,440,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 104
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Karvo Companies Inc | $2,967,842 | Low | +22% |
| 2 | Catts Construction Inc | $3,292,365 | +11% | +35% |
Engineer's estimate: $2,440,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Karvo Companies Inc | 2. Catts Construction Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $500.00 | $7,360.00 |
| 2 | Pavement removed (202E23000) | SY | 358 | $35.00 | $28.00 |
| 3 | Concrete barrier removed (202E30700) | FT | 1,225 | $15.00 | $15.00 |
| 4 | Curb removed (202E32000) | FT | 1,359 | $18.00 | $18.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 64 | $35.00 | $45.00 |
| 6 | Guardrail removed (202E38000) | FT | 747 | $2.00 | $4.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 5 | $165.00 | $258.00 |
| 8 | Impact attenuator removed (202E47800) | EACH | 2 | $925.00 | $451.00 |
| 9 | Excavation (203E10000) | CY | 50 | $145.00 | $125.00 |
| 10 | Geotextile fabric (204E50000) | SY | 155 | $3.00 | $3.00 |
| 11 | Geogrid (204E51000) | SY | 69 | $8.00 | $4.00 |
| 12 | Guardrail, type MGS (606E15050) | FT | 957 | $20.00 | $28.00 |
| 13 | Anchor assembly, MGS type E (606E26150) | EACH | 6 | $2,520.00 | $3,418.00 |
| 14 | Impact attenuator, type 3 unidirectional (606E60040) | EACH | 1 | $32,880 | $43,536 |
| 15 | Concrete barrier, single slope, type C (622E10120) | FT | 85 | $500.00 | $400.00 |
| 16 | Concrete barrier, end anchorage, reinforced, type C (622E25008) | EACH | 1 | $12,500 | $10,659 |
| 17 | Soil analysis test (659E00100) | EACH | 2 | $300.00 | $100.00 |
| 18 | Topsoil (659E00300) | CY | 129 | $62.50 | $85.00 |
| 19 | Seeding and mulching, class 2 (659E00510) | SY | 1,157 | $2.75 | $2.00 |
| 20 | Repair seeding and mulching (659E14000) | SY | 58 | $2.75 | $1.00 |
| 21 | Inter-seeding (659E15000) | SY | 58 | $2.75 | $1.00 |
| 22 | Commercial fertilizer (659E20000) | TON | 0.19 | $1,125.00 | $10.00 |
| 23 | Lime (659E31000) | ACRE | 0.24 | $1,575.00 | $10.00 |
| 24 | Water (659E35000) | MGAL | 7 | $125.00 | $10.00 |
| 25 | Erosion control (832E30000) | EACH | 19,635 | $1.00 | $1.00 |
| 26 | 15" conduit, type B, as per plan (611E05901) | FT | 947 | $185.00 | $210.00 |
| 27 | 15" conduit, type C, as per plan (611E06101) | FT | 588 | $105.00 | $107.00 |
| 28 | 21" conduit, type C, as per plan (611E09101) | FT | 16 | $275.00 | $245.00 |
| 29 | Inlet, no. 3B50, as per plan (611E98805) | EACH | 2 | $22,000 | $32,750 |
| 30 | Inlet, no. 2-A-6, as per plan (611E98841) | EACH | 5 | $10,000 | $7,115.00 |
| 31 | Inlet, no. 2-A-8, as per plan (611E98851) | EACH | 4 | $6,000.00 | $7,973.00 |
| 32 | Inlet adjusted to grade (611E99150) | EACH | 9 | $2,250.00 | $840.00 |
| 33 | Manhole, no. 3, as per plan (611E99575) | EACH | 5 | $7,500.00 | $6,050.00 |
| 34 | Full depth rigid pavement removal and flexible replacement, as per plan (252E01001) | SY | 2,355 | $180.00 | $196.00 |
| 35 | Full depth pavement sawing (252E01500) | FT | 4,776 | $5.00 | $8.00 |
| 36 | Pavement planing, asphalt concrete, (1.5") (254E01000) | SY | 1,378 | $25.00 | $28.50 |
| 37 | Pavement planing, portland cement concrete, (1.5&Q (254E01010) | SY | 351 | $75.00 | $50.00 |
| 38 | Full depth pavement removal and rigid replacement, type 1, class QC1, as per plan (255E11001) | SY | 494 | $175.00 | $260.00 |
| 39 | Full depth pavement removal and rigid replacement, type 2, class QC1, as per plan (255E12001) | SY | 305 | $175.00 | $217.00 |
| 40 | Full depth pavement sawing (255E20000) | FT | 826 | $8.00 | $8.00 |
| 41 | Aggregate base (304E20000) | CY | 50 | $125.00 | $195.00 |
| 42 | Concrete base, misc.: 9.75" concrete base, CL (305E17500) | SY | 25 | $215.00 | $450.00 |
| 43 | Non-tracking tack coat (407E20000) | GAL | 157 | $3.00 | $4.00 |
| 44 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 73 | $850.00 | $1,690.00 |
| 45 | Curb, type 2-A (609E14000) | FT | 547 | $10.00 | $25.00 |
| 46 | Curb, type 3-B (609E22000) | FT | 15 | $80.00 | $100.00 |
| 47 | Curb, type 6 (609E26000) | FT | 1,983 | $32.00 | $45.00 |
| 48 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 4,060 | $1.65 | $2.00 |
| 49 | Rumble strips, shoulder (concrete) (618E40200) | FT | 3,898 | $1.95 | $2.50 |
| 50 | Connection, unfused permanent (625E00480) | EACH | 8 | $150.00 | $141.00 |
| 51 | Distribution cable, misc.: no. 2 AWG 5000 volt dis (625E23308) | FT | 80 | $10.00 | $78.00 |
| 52 | Special - maintain existing lighting (625E40000) | LS | 1 | $25,000 | $11,745 |
| 53 | Disconnect circuit (625E75800) | EACH | 2 | $500.00 | $451.00 |
| 54 | RPM (621E00100) | EACH | 1,104 | $40.00 | $45.00 |
| 55 | Raised pavement marker removed (621E54000) | EACH | 498 | $1.00 | $25.50 |
| 56 | Ground rod (625E32000) | EACH | 4 | $300.00 | $387.00 |
| 57 | Barrier reflector, type 1, one way (626E00102) | EACH | 4 | $13.00 | $16.50 |
| 58 | Barrier reflector, type 2, one way (626E00110) | EACH | 14 | $13.60 | $16.50 |
| 59 | Ground mounted support, no. 3 post (630E03100) | FT | 312 | $18.00 | $19.00 |
| 60 | Sign post reflector (630E08600) | EACH | 6 | $45.00 | $65.00 |
| 61 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 2 | $75,000 | $79,979 |
| 62 | Sign attachment assembly (630E75000) | EACH | 4 | $720.00 | $1,290.00 |
| 63 | Sign, flat sheet (630E80100) | SF | 330 | $16.50 | $28.00 |
| 64 | Sign, overhead extrusheet (630E80224) | SF | 891.70 | $22.00 | $33.50 |
| 65 | Sign, temporary overlay (630E80300) | SF | 648 | $35.00 | $42.00 |
| 66 | Covering of sign (630E83000) | SF | 112 | $39.80 | $51.00 |
| 67 | Rigid overhead sign support foundation (630E84510) | EACH | 4 | $12,275 | $15,835 |
| 68 | Removal of ground mounted sign and disposal (630E84900) | EACH | 9 | $10.00 | $13.00 |
| 69 | Removal of ground mounted post support and disposal (630E86002) | EACH | 11 | $15.00 | $19.00 |
| 70 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 33 | $345.00 | $445.00 |
| 71 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 1 | $2,350.00 | $3,031.00 |
| 72 | Edge line, 6", type 1 (642E00104) | MI | 8.80 | $1,600.00 | $2,064.00 |
| 73 | Lane line, 6", type 1 (642E00204) | MI | 6.88 | $1,250.00 | $1,612.00 |
| 74 | Channelizing line, 12", type 1 (642E00404) | FT | 25,326 | $0.85 | $1.00 |
| 75 | Chevron marking, type 1 (642E00720) | FT | 668 | $3.80 | $5.00 |
| 76 | Dotted line, 6", type 1 (642E01510) | FT | 2,534 | $0.70 | $1.00 |
| 77 | Dotted line, 12", type 1 (642E01560) | FT | 6,084 | $1.00 | $1.25 |
| 78 | Removal of pavement marking (642E30000) | FT | 15,416 | $1.00 | $1.25 |
| 79 | Removal of pavement marking (642E30020) | EACH | 2 | $45.00 | $58.00 |
| 80 | Removal of pavement marking (642E30030) | MI | 10.17 | $2,250.00 | $2,902.00 |
| 81 | Edge line, 6" (646E10010) | MI | 1.61 | $5,000.00 | $6,450.00 |
| 82 | Lane line, 6" (646E10110) | MI | 0.66 | $2,250.00 | $2,902.00 |
| 83 | Channelizing line, 12" (646E10310) | FT | 5,027 | $2.15 | $2.75 |
| 84 | Chevron marking (646E10620) | FT | 427 | $8.00 | $10.30 |
| 85 | Dotted line, 12" (646E20510) | FT | 3,150 | $2.00 | $2.50 |
| 86 | Interstate elongated route shield symbol marking, type B125 (814E00010) | EACH | 4 | $7,500.00 | $6,450.00 |
| 87 | Cardinal direction (north, south, west & east) marking, type B125 (814E00016) | EACH | 2 | $3,000.00 | $3,870.00 |
| 88 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 240 | $125.00 | $122.50 |
| 89 | Increased barrier delineation (614E11630) | FT | 8,758 | $1.00 | $1.25 |
| 90 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 6 | $2,540.00 | $3,147.00 |
| 91 | Barrier reflector, type 1, BI-directional (614E13310) | EACH | 176 | $17.50 | $22.50 |
| 92 | Barrier reflector, type 3, one way (614E13314) | EACH | 22 | $25.00 | $32.00 |
| 93 | Object marker, one way (614E13350) | EACH | 198 | $25.00 | $32.00 |
| 94 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $1,250.00 | $1,161.00 |
| 95 | Work zone edge line, class I, 6" (614E22010) | MI | 1.53 | $2,000.00 | $2,580.00 |
| 96 | Work zone channelizing line, class I, 12" (614E23010) | FT | 2,860 | $2.00 | $2.50 |
| 97 | Work zone channelizing line, class II, 12" (614E23656) | FT | 4,320 | $1.65 | $2.00 |
| 98 | Work zone dotted line, class I (614E24000) | FT | 720 | $1.00 | $1.25 |
| 99 | Work zone pavement marking, misc.:removable non-RE (614E98000) | MI | 1.08 | $17,500 | $22,576 |
| 100 | Portable barrier, unanchored (622E41100) | FT | 6,748 | $32.00 | $15.00 |
| 101 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $34,540 |
| 102 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $300,000 | $323,400 |
| 103 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $100,000 | $80,000 |
| 104 | Mobilization (624E10000) | LS | 1 | $250,000 | $325,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.