ODOT contract 250196 bid tabulation
NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on April 10, 2025, NOB. 6 bids received; low bid $773,793 by J & J Bridge Company Inc, -28% against the engineer's estimate of $1,075,000.
- Owner
- Ohio DOT
- Letting
- 10 APR 2025
- Pay items
- 81
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | J & J Bridge Company Inc | $773,793 | Low | -28% |
| 2 | Black Horse Bridge Construction Inc | $888,470 | +15% | -17% |
| 3 | Buds Inc | $1,003,358 | +30% | -7.0% |
| 4 | Ohio-West Virginia Excavating Co | $1,093,077 | +41% | +2.0% |
| 5 | Complete General Construction Company | $1,118,791 | +45% | +4.0% |
| 6 | Shelly & Sands Inc | $1,150,220 | +49% | +7.0% |
Engineer's estimate: $1,075,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J & J Bridge Company Inc | 2. Black Horse Bridge Construction Inc | 3. Buds Inc | 4. Ohio-West Virginia Excavating Co | 5. Complete General Construction Company | 6. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $9,600.00 | $5,000.00 | $10,000 | $15,000 | $6,000.00 |
| 2 | Pipe removed, 24" and under (202E35100) | FT | 79 | $15.00 | $30.00 | $45.00 | $55.00 | $37.00 | $47.00 |
| 3 | Guardrail removed (202E38000) | FT | 223 | $1.00 | $4.00 | $2.50 | $14.00 | $2.40 | $2.40 |
| 4 | Excavation (203E10000) | CY | 745 | $25.00 | $32.00 | $45.00 | $35.00 | $30.00 | $45.00 |
| 5 | Embankment (203E20000) | CY | 250 | $15.00 | $22.00 | $65.00 | $35.00 | $25.00 | $40.00 |
| 6 | Subgrade compaction (204E10000) | SY | 1,394 | $5.00 | $4.50 | $8.00 | $5.00 | $5.00 | $6.50 |
| 7 | Excavation of subgrade (204E13000) | CY | 500 | $5.00 | $18.00 | $25.00 | $35.00 | $30.00 | $35.00 |
| 8 | Granular material, type B (204E30010) | CY | 500 | $25.00 | $85.00 | $65.00 | $75.00 | $90.00 | $115.00 |
| 9 | Proof rolling (204E45000) | HR | 1 | $200.00 | $200.00 | $95.00 | $185.00 | $300.00 | $220.00 |
| 10 | Geotextile fabric (204E50000) | SY | 500 | $1.00 | $2.00 | $2.00 | $2.50 | $8.00 | $1.80 |
| 11 | Geogrid (204E51000) | SY | 500 | $1.00 | $3.00 | $2.00 | $3.50 | $5.00 | $1.50 |
| 12 | Guardrail, type MGS (606E15050) | FT | 483.40 | $21.40 | $18.00 | $22.00 | $24.00 | $18.00 | $18.00 |
| 13 | Guardrail, type MGS with long posts (606E15100) | FT | 100 | $24.40 | $20.40 | $23.00 | $26.00 | $20.40 | $20.40 |
| 14 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $1,630.00 | $1,570.00 | $1,900.00 | $1,800.00 | $1,570.00 | $1,570.00 |
| 15 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,000.00 | $1,330.00 | $1,200.00 | $1,200.00 | $1,330.00 | $1,330.00 |
| 16 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,250.00 | $2,540.00 | $2,450.00 | $2,500.00 | $2,540.00 | $2,540.00 |
| 17 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 130 | $140.00 | $136.00 | $112.00 | $130.00 | $140.00 | $125.00 |
| 18 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $125.00 | $50.00 | $125.00 | $150.00 | $150.00 |
| 19 | Topsoil (659E00300) | CY | 148 | $10.00 | $55.00 | $25.00 | $70.00 | $45.00 | $70.00 |
| 20 | Seeding and mulching (659E10000) | SY | 1,325 | $1.00 | $3.00 | $3.00 | $5.50 | $2.57 | $2.57 |
| 21 | Repair seeding and mulching (659E14000) | SY | 67 | $1.00 | $3.00 | $0.05 | $5.50 | $2.57 | $2.57 |
| 22 | Commercial fertilizer (659E20000) | TON | 0.18 | $3,000.00 | $895.00 | $800.17 | $525.00 | $1,250.00 | $1,250.00 |
| 23 | Lime (659E31000) | ACRE | 0.27 | $2,000.00 | $160.00 | $400.00 | $450.00 | $150.00 | $150.00 |
| 24 | Water (659E35000) | MGAL | 8 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Erosion control (832E30000) | EACH | 7,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | Seeding and erosion control with turf reinforcing mat, type 3 (836E10030) | SY | 210 | $5.00 | $10.00 | $6.00 | $12.00 | $5.00 | $5.00 |
| 27 | Concrete masonry (602E20000) | CY | 2 | $2,500.00 | $3,300.00 | $2,290.00 | $1,400.00 | $3,500.00 | $4,000.00 |
| 28 | Aggregate drains (605E31100) | FT | 133 | $20.00 | $19.00 | $24.00 | $30.00 | $18.00 | $20.00 |
| 29 | 8" conduit, type B (611E01800) | FT | 25 | $6.00 | $34.00 | $10.00 | $40.00 | $95.00 | $19.00 |
| 30 | 8" conduit, type E (611E02500) | FT | 25 | $7.00 | $34.00 | $10.00 | $40.00 | $60.00 | $19.00 |
| 31 | 8" conduit, type F (611E02600) | FT | 25 | $8.00 | $34.00 | $8.00 | $40.00 | $65.00 | $19.00 |
| 32 | 12" conduit, type D (611E04900) | FT | 59 | $46.00 | $60.00 | $95.00 | $130.00 | $105.00 | $100.00 |
| 33 | 18" conduit, type B (611E07400) | FT | 30 | $53.00 | $92.00 | $124.00 | $245.00 | $200.00 | $280.00 |
| 34 | 18" conduit, type C (611E07600) | FT | 7 | $125.00 | $123.00 | $170.00 | $300.00 | $340.00 | $220.00 |
| 35 | 18" conduit, type D (611E07900) | FT | 40 | $91.00 | $70.00 | $123.00 | $135.00 | $225.00 | $150.00 |
| 36 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,500.00 | $1,900.00 | $2,500.00 | $4,000.00 | $3,100.00 | $4,500.00 |
| 37 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 178 | $261.00 | $250.00 | $255.00 | $350.00 | $261.00 | $250.00 |
| 38 | Aggregate base (304E20000) | CY | 226 | $105.00 | $115.00 | $98.00 | $135.00 | $150.00 | $135.00 |
| 39 | Non-tracking tack coat (407E20000) | GAL | 121 | $4.00 | $3.50 | $4.00 | $4.00 | $4.00 | $3.50 |
| 40 | Stabilized crushed aggregate (411E10000) | CY | 56 | $140.00 | $100.00 | $118.00 | $185.00 | $145.00 | $152.00 |
| 41 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 35 | $433.00 | $425.00 | $430.00 | $550.00 | $433.00 | $425.00 |
| 42 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 49 | $344.00 | $350.00 | $350.00 | $375.00 | $344.00 | $350.00 |
| 43 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 13 | $11.00 | $14.00 | $11.75 | $12.00 | $13.20 | $13.20 |
| 44 | Ground mounted support, no. 2 post (630E02100) | FT | 53 | $13.00 | $18.00 | $20.00 | $14.00 | $18.00 | $18.00 |
| 45 | Street name sign support, no. 2 post (630E08510) | FT | 9.80 | $35.00 | $25.00 | $25.00 | $32.00 | $25.00 | $25.00 |
| 46 | Sign post reflector (630E08600) | EACH | 1 | $35.00 | $45.00 | $55.00 | $38.00 | $45.00 | $45.00 |
| 47 | Sign, flat sheet (630E80100) | SF | 18.30 | $35.00 | $20.00 | $25.00 | $35.00 | $20.00 | $20.00 |
| 48 | Removal of ground mounted sign and disposal (630E84900) | EACH | 5 | $15.00 | $10.00 | $15.00 | $18.00 | $10.00 | $10.00 |
| 49 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $50.00 | $65.00 | $110.00 | $60.00 | $65.00 | $65.00 |
| 50 | Removal of ground mounted post support and disposal (630E86002) | EACH | 7 | $18.00 | $15.00 | $15.00 | $18.00 | $15.00 | $15.00 |
| 51 | Edge line, 6", type 1 (642E00104) | MI | 0.21 | $3,975.00 | $5,050.00 | $4,500.00 | $4,500.00 | $3,975.00 | $3,975.00 |
| 52 | Center line, type 1 (642E00300) | MI | 0.10 | $7,725.00 | $9,945.00 | $8,500.00 | $8,500.00 | $7,725.00 | $7,725.00 |
| 53 | Detour signing (614E12420) | LS | 1 | $2,750.00 | $5,045.00 | $4,800.00 | $3,200.00 | $5,000.00 | $2,750.00 |
| 54 | Water (616E10000) | MGAL | 2 | $10.00 | $1.00 | $1.00 | $10.00 | $125.00 | $70.00 |
| 55 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $30,000 | $22,400 | $35,000 | $37,000 | $85,000 | $41,000 |
| 56 | Wearing course removed (202E23500) | SY | 151 | $1.00 | $10.00 | $33.00 | $25.00 | $11.00 | $17.00 |
| 57 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $100.00 | $7,500.00 | $8,500.00 | $15,000 | $20,000 | $37,000 |
| 58 | Unclassified excavation (503E21300) | LS | 1 | $20,000 | $24,600 | $15,000 | $40,000 | $40,000 | $55,000 |
| 59 | Pile driving equipment mobilization (505E11100) | LS | 1 | $15,000 | $8,000.00 | $18,000 | $2,000.00 | $28,000 | $25,000 |
| 60 | Steel piles HP10X42, furnished, as per plan (507E00101) | FT | 330 | $35.00 | $40.00 | $34.00 | $45.00 | $60.00 | $30.00 |
| 61 | Prebored holes, as per plan (507E92201) | FT | 265 | $150.00 | $175.00 | $225.00 | $165.00 | $125.00 | $150.00 |
| 62 | Epoxy coated steel reinforcement (509E10000) | LB | 13,522 | $2.00 | $2.00 | $2.08 | $2.33 | $1.80 | $1.70 |
| 63 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 40 | $800.00 | $1,500.00 | $2,100.00 | $1,800.00 | $1,750.00 | $2,600.00 |
| 64 | Class QC1 concrete, abutment including footing (511E43510) | CY | 65 | $650.00 | $800.00 | $955.00 | $1,200.00 | $1,350.00 | $1,500.00 |
| 65 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 82 | $30.00 | $43.00 | $25.00 | $25.00 | $45.00 | $45.00 |
| 66 | Prestressed concrete composite box beam bridge members, level 1, CB21-48, as per plan (515E12051) | EACH | 7 | $17,500 | $19,500 | $22,000 | $24,000 | $21,000 | $18,000 |
| 67 | 2" preformed expansion joint filler (516E13900) | SF | 33 | $10.00 | $18.00 | $25.00 | $12.00 | $48.23 | $10.00 |
| 68 | Integral abutment expansion joint seal (516E14014) | FT | 83 | $35.00 | $33.00 | $32.00 | $32.00 | $46.50 | $46.50 |
| 69 | 2" deep joint sealer (516E31010) | FT | 56 | $14.00 | $33.00 | $23.00 | $15.00 | $38.00 | $38.00 |
| 70 | Elastomeric bearing with internal laminates and load plate (516E44000) | EACH | 28 | $650.00 | $1,000.00 | $975.00 | $875.00 | $600.00 | $700.00 |
| 71 | Railing (twin steel tube) (517E70000) | FT | 134 | $213.00 | $230.00 | $222.00 | $250.00 | $208.00 | $208.00 |
| 72 | Porous backfill with geotextile fabric (518E21200) | CY | 47 | $160.00 | $125.00 | $158.00 | $150.00 | $140.00 | $190.00 |
| 73 | Special - steel drip strip (518E22300) | FT | 145 | $21.00 | $27.00 | $18.00 | $20.00 | $16.00 | $16.00 |
| 74 | 6" perforated corrugated plastic pipe (518E40000) | FT | 92 | $9.00 | $14.00 | $18.00 | $10.00 | $13.00 | $6.00 |
| 75 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 42 | $9.00 | $18.00 | $24.00 | $10.00 | $16.00 | $6.00 |
| 76 | Reinforced concrete approach slabs (T=12") (526E10000) | SY | 94 | $460.00 | $375.00 | $445.00 | $500.00 | $395.00 | $600.00 |
| 77 | Type A installation (526E90010) | FT | 56 | $310.00 | $220.00 | $225.00 | $300.00 | $300.00 | $200.00 |
| 78 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $8,800.00 | $16,000 | $15,000 | $8,000.00 | $6,000.00 |
| 79 | Maintaining traffic (614E11000) | LS | 1 | $3,750.00 | $3,500.00 | $7,500.00 | $7,000.00 | $9,500.00 | $3,750.00 |
| 80 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,300.00 | $12,000 | $12,000 | $6,500.00 | $10,000 | $16,000 |
| 81 | Mobilization (624E10000) | LS | 1 | $24,000 | $25,000 | $35,000 | $40,000 | $55,000 | $57,536 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.