ODOT contract 250196 bid tabulation

NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on April 10, 2025, NOB. 6 bids received; low bid $773,793 by J & J Bridge Company Inc, -28% against the engineer's estimate of $1,075,000.

Owner
Ohio DOT
Letting
10 APR 2025
Pay items
81
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J & J Bridge Company Inc$773,793Low-28%
2Black Horse Bridge Construction Inc$888,470+15%-17%
3Buds Inc$1,003,358+30%-7.0%
4Ohio-West Virginia Excavating Co$1,093,077+41%+2.0%
5Complete General Construction Company$1,118,791+45%+4.0%
6Shelly & Sands Inc$1,150,220+49%+7.0%
ODOT contract 250196: bids by rank

Engineer's estimate: $1,075,000.

Bid tabulation

LinePay itemUnitQuantity1. J & J Bridge Company Inc2. Black Horse Bridge Construction Inc3. Buds Inc4. Ohio-West Virginia Excavating Co5. Complete General Construction Company6. Shelly & Sands Inc
1Clearing and grubbing, as per plan (201E11001)LS1$5,000.00$9,600.00$5,000.00$10,000$15,000$6,000.00
2Pipe removed, 24" and under (202E35100)FT79$15.00$30.00$45.00$55.00$37.00$47.00
3Guardrail removed (202E38000)FT223$1.00$4.00$2.50$14.00$2.40$2.40
4Excavation (203E10000)CY745$25.00$32.00$45.00$35.00$30.00$45.00
5Embankment (203E20000)CY250$15.00$22.00$65.00$35.00$25.00$40.00
6Subgrade compaction (204E10000)SY1,394$5.00$4.50$8.00$5.00$5.00$6.50
7Excavation of subgrade (204E13000)CY500$5.00$18.00$25.00$35.00$30.00$35.00
8Granular material, type B (204E30010)CY500$25.00$85.00$65.00$75.00$90.00$115.00
9Proof rolling (204E45000)HR1$200.00$200.00$95.00$185.00$300.00$220.00
10Geotextile fabric (204E50000)SY500$1.00$2.00$2.00$2.50$8.00$1.80
11Geogrid (204E51000)SY500$1.00$3.00$2.00$3.50$5.00$1.50
12Guardrail, type MGS (606E15050)FT483.40$21.40$18.00$22.00$24.00$18.00$18.00
13Guardrail, type MGS with long posts (606E15100)FT100$24.40$20.40$23.00$26.00$20.40$20.40
14Anchor assembly, MGS type A (606E25550)EACH1$1,630.00$1,570.00$1,900.00$1,800.00$1,570.00$1,570.00
15Anchor assembly, MGS type T (606E26550)EACH5$1,000.00$1,330.00$1,200.00$1,200.00$1,330.00$1,330.00
16MGS bridge terminal assembly, type 1 (606E35002)EACH4$2,250.00$2,540.00$2,450.00$2,500.00$2,540.00$2,540.00
17Rock channel protection, type C with geotextile fabric (601E32204)CY130$140.00$136.00$112.00$130.00$140.00$125.00
18Soil analysis test (659E00100)EACH2$50.00$125.00$50.00$125.00$150.00$150.00
19Topsoil (659E00300)CY148$10.00$55.00$25.00$70.00$45.00$70.00
20Seeding and mulching (659E10000)SY1,325$1.00$3.00$3.00$5.50$2.57$2.57
21Repair seeding and mulching (659E14000)SY67$1.00$3.00$0.05$5.50$2.57$2.57
22Commercial fertilizer (659E20000)TON0.18$3,000.00$895.00$800.17$525.00$1,250.00$1,250.00
23Lime (659E31000)ACRE0.27$2,000.00$160.00$400.00$450.00$150.00$150.00
24Water (659E35000)MGAL8$10.00$1.00$1.00$1.00$1.00$1.00
25Erosion control (832E30000)EACH7,500$1.00$1.00$1.00$1.00$1.00$1.00
26Seeding and erosion control with turf reinforcing mat, type 3 (836E10030)SY210$5.00$10.00$6.00$12.00$5.00$5.00
27Concrete masonry (602E20000)CY2$2,500.00$3,300.00$2,290.00$1,400.00$3,500.00$4,000.00
28Aggregate drains (605E31100)FT133$20.00$19.00$24.00$30.00$18.00$20.00
298" conduit, type B (611E01800)FT25$6.00$34.00$10.00$40.00$95.00$19.00
308" conduit, type E (611E02500)FT25$7.00$34.00$10.00$40.00$60.00$19.00
318" conduit, type F (611E02600)FT25$8.00$34.00$8.00$40.00$65.00$19.00
3212" conduit, type D (611E04900)FT59$46.00$60.00$95.00$130.00$105.00$100.00
3318" conduit, type B (611E07400)FT30$53.00$92.00$124.00$245.00$200.00$280.00
3418" conduit, type C (611E07600)FT7$125.00$123.00$170.00$300.00$340.00$220.00
3518" conduit, type D (611E07900)FT40$91.00$70.00$123.00$135.00$225.00$150.00
36Catch basin, no. 2-2B (611E98470)EACH1$2,500.00$1,900.00$2,500.00$4,000.00$3,100.00$4,500.00
37Asphalt concrete base, PG64-22, (449) (301E56000)CY178$261.00$250.00$255.00$350.00$261.00$250.00
38Aggregate base (304E20000)CY226$105.00$115.00$98.00$135.00$150.00$135.00
39Non-tracking tack coat (407E20000)GAL121$4.00$3.50$4.00$4.00$4.00$3.50
40Stabilized crushed aggregate (411E10000)CY56$140.00$100.00$118.00$185.00$145.00$152.00
41Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY35$433.00$425.00$430.00$550.00$433.00$425.00
42Asphalt concrete intermediate course, type 2, (449) (441E70300)CY49$344.00$350.00$350.00$375.00$344.00$350.00
43Barrier reflector, type 2 (bidirectional) (626E00110)EACH13$11.00$14.00$11.75$12.00$13.20$13.20
44Ground mounted support, no. 2 post (630E02100)FT53$13.00$18.00$20.00$14.00$18.00$18.00
45Street name sign support, no. 2 post (630E08510)FT9.80$35.00$25.00$25.00$32.00$25.00$25.00
46Sign post reflector (630E08600)EACH1$35.00$45.00$55.00$38.00$45.00$45.00
47Sign, flat sheet (630E80100)SF18.30$35.00$20.00$25.00$35.00$20.00$20.00
48Removal of ground mounted sign and disposal (630E84900)EACH5$15.00$10.00$15.00$18.00$10.00$10.00
49Removal of ground mounted sign and reerection (630E85100)EACH2$50.00$65.00$110.00$60.00$65.00$65.00
50Removal of ground mounted post support and disposal (630E86002)EACH7$18.00$15.00$15.00$18.00$15.00$15.00
51Edge line, 6", type 1 (642E00104)MI0.21$3,975.00$5,050.00$4,500.00$4,500.00$3,975.00$3,975.00
52Center line, type 1 (642E00300)MI0.10$7,725.00$9,945.00$8,500.00$8,500.00$7,725.00$7,725.00
53Detour signing (614E12420)LS1$2,750.00$5,045.00$4,800.00$3,200.00$5,000.00$2,750.00
54Water (616E10000)MGAL2$10.00$1.00$1.00$10.00$125.00$70.00
55Structure removed, over 20 foot span, as per plan (202E11003)LS1$30,000$22,400$35,000$37,000$85,000$41,000
56Wearing course removed (202E23500)SY151$1.00$10.00$33.00$25.00$11.00$17.00
57Cofferdams and excavation bracing (503E11100)LS1$100.00$7,500.00$8,500.00$15,000$20,000$37,000
58Unclassified excavation (503E21300)LS1$20,000$24,600$15,000$40,000$40,000$55,000
59Pile driving equipment mobilization (505E11100)LS1$15,000$8,000.00$18,000$2,000.00$28,000$25,000
60Steel piles HP10X42, furnished, as per plan (507E00101)FT330$35.00$40.00$34.00$45.00$60.00$30.00
61Prebored holes, as per plan (507E92201)FT265$150.00$175.00$225.00$165.00$125.00$150.00
62Epoxy coated steel reinforcement (509E10000)LB13,522$2.00$2.00$2.08$2.33$1.80$1.70
63Class QC2 concrete, superstructure, as per plan (511E31611)CY40$800.00$1,500.00$2,100.00$1,800.00$1,750.00$2,600.00
64Class QC1 concrete, abutment including footing (511E43510)CY65$650.00$800.00$955.00$1,200.00$1,350.00$1,500.00
65Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY82$30.00$43.00$25.00$25.00$45.00$45.00
66Prestressed concrete composite box beam bridge members, level 1, CB21-48, as per plan (515E12051)EACH7$17,500$19,500$22,000$24,000$21,000$18,000
672" preformed expansion joint filler (516E13900)SF33$10.00$18.00$25.00$12.00$48.23$10.00
68Integral abutment expansion joint seal (516E14014)FT83$35.00$33.00$32.00$32.00$46.50$46.50
692" deep joint sealer (516E31010)FT56$14.00$33.00$23.00$15.00$38.00$38.00
70Elastomeric bearing with internal laminates and load plate (516E44000)EACH28$650.00$1,000.00$975.00$875.00$600.00$700.00
71Railing (twin steel tube) (517E70000)FT134$213.00$230.00$222.00$250.00$208.00$208.00
72Porous backfill with geotextile fabric (518E21200)CY47$160.00$125.00$158.00$150.00$140.00$190.00
73Special - steel drip strip (518E22300)FT145$21.00$27.00$18.00$20.00$16.00$16.00
746" perforated corrugated plastic pipe (518E40000)FT92$9.00$14.00$18.00$10.00$13.00$6.00
756" non-perforated corrugated plastic pipe, including specials (518E40010)FT42$9.00$18.00$24.00$10.00$16.00$6.00
76Reinforced concrete approach slabs (T=12") (526E10000)SY94$460.00$375.00$445.00$500.00$395.00$600.00
77Type A installation (526E90010)FT56$310.00$220.00$225.00$300.00$300.00$200.00
78Premium for contract performance bond and for payment bond (103E05000)LS1$30,000$8,800.00$16,000$15,000$8,000.00$6,000.00
79Maintaining traffic (614E11000)LS1$3,750.00$3,500.00$7,500.00$7,000.00$9,500.00$3,750.00
80Construction layout stakes and surveying (623E10000)LS1$2,300.00$12,000$12,000$6,500.00$10,000$16,000
81Mobilization (624E10000)LS1$24,000$25,000$35,000$40,000$55,000$57,536
ODOT contract 250196: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy