ODOT contract 260386 bid tabulation

LAW-VAR South Point-Sidewalk (SIDEWALK). Let by Ohio DOT on August 27, 2026, LAW. 3 bids received; low bid $1,158,611 by Axis Civil Construction LLC, +28% against the engineer's estimate of $906,000.

Owner
Ohio DOT
Letting
27 AUG 2026
Pay items
91
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Axis Civil Construction LLC$1,158,611Low+28%
2Allard Excavation LLC$1,183,938+2.0%+31%
3Alan Stone Co Inc$1,385,588+20%+53%
ODOT contract 260386: bids by rank

Engineer's estimate: $906,000.

Bid tabulation

LinePay itemUnitQuantity1. Axis Civil Construction LLC2. Allard Excavation LLC3. Alan Stone Co Inc
1Clearing and grubbing (201E11000)LS1$20,000$17,250$23,000
2Pavement removed (202E23000)SY604$25.00$42.00$15.00
3Walk removed (202E30000)SF121$6.00$18.00$50.00
4Curb removed (202E32000)FT178$7.00$10.00$10.00
5Gutter removed (202E32600)FT110$9.89$10.00$5.00
6Pipe removed, 24" and under (202E35100)FT57$18.00$5.00$25.00
7Guardrail removed (202E38000)FT46$7.00$4.00$10.00
8Catch basin removed (202E58100)EACH4$1,000.00$524.00$490.00
9Removal misc.: 17 L.F. chain link & woven wire fen (202E98000)LS1$500.00$146.00$490.00
10Removal misc.: 18 L.F. wood fence at 202 park aven (202E98000)LS1$500.00$143.00$490.00
11Removal misc.: 3' tall conc. filled metal post (202E98000)LS1$1,200.00$146.00$2,000.00
12Removal misc.: 3' tall wood posts (12) at 402 (202E98000)LS1$500.00$143.00$490.00
13Removal misc.: 3' X 5' X 2' rock at 41 (202E98000)LS1$500.00$143.00$990.00
14Removal misc.: 5 L.F. chain link fence at 420 soli (202E98000)LS1$500.00$68.00$490.00
15Removal misc.: 73 L.F. chain link & woven wire fen (202E98000)LS1$500.00$271.00$490.00
16Removal misc.: 9 L.F. chain link fence at 318 soli (202E98000)LS1$250.00$68.00$490.00
17Removal misc.: 92 L.F. 3' tall split rail fenc (202E98000)LS1$500.00$271.00$490.00
18Removal misc.: wood post at 208 park avenue (202E98000)LS1$250.00$271.00$250.00
19Removal misc.:11 L.F. 3' tall split rail fence (202E98000)LS1$250.00$141.00$250.00
20Removal misc.:3' tall wood post around conc. M (202E98000)LS1$250.00$135.00$250.00
21Removal misc.:4 L.F. 3' tall split rail fence (202E98000)LS1$250.00$68.00$250.00
22Removal misc.:ollard at 408 9TH street (202E98000)LS1$500.00$54.00$490.00
23Removal misc.:post at 421 solida road (202E98000)LS1$250.00$41.00$250.00
24Removal misc.:steel post at 214 park avenue (202E98000)LS1$500.00$68.00$490.00
25Subgrade compaction (204E10000)SY2,678$2.50$3.00$5.00
26Proof rolling (204E45000)HR1$250.00$244.00$270.00
274" concrete walk (608E10000)SF21,040$10.50$10.00$10.00
28Curb ramp (608E52000)SF1,340$18.00$28.00$35.00
29Detectable warning (608E53020)SF249$35.00$28.00$100.00
30Curb, type 6 (609E26000)FT1,024$33.00$46.00$50.00
31Special - mailbox support system, single (690E50100)EACH24$450.00$205.00$280.00
32Special - mailbox support system, double (690E50200)EACH12$600.00$293.00$280.00
33Soil analysis test (659E00100)EACH1$150.00$150.00$230.00
34Topsoil (659E00300)CY395$58.00$73.00$120.00
35Seeding and mulching (659E10000)SY3,557$2.00$1.35$4.00
36Repair seeding and mulching (659E14000)SY178$1.00$1.00$7.50
37Inter-seeding (659E15000)SY178$1.00$1.00$7.50
38Commercial fertilizer (659E20000)TON0.49$1,250.00$1,250.00$640.00
39Lime (659E31000)ACRE0.74$150.00$150.00$910.00
40Water (659E35000)MGAL20$1.00$1.00$110.00
41Slope erosion protection (670E00500)SY575$2.00$2.00$3.50
42Storm water pollution prevention plan (832E15000)LS1$2,500.00$2,500.00$3,300.00
43Storm water pollution prevention inspections (832E15002)LS1$9,550.00$9,550.00$15,000
44Storm water pollution prevention inspection software (832E15010)LS1$13,000$11,100$14,000
45Erosion control (832E30000)EACH55,000$1.00$1.00$1.00
466" conduit, type B (611E00900)FT145$25.00$27.00$15.00
478" conduit, type B (611E01800)FT12$45.00$45.00$110.00
4812" conduit, type B (611E04400)FT95$100.00$152.00$200.00
4912" conduit, type C (611E04600)FT58$100.00$156.00$100.00
5018" conduit, type B (611E07400)FT10$125.00$167.00$160.00
51Catch basin, no. 3A (611E98180)EACH1$3,500.00$4,948.00$4,600.00
52Catch basin, no. 6, as per plan (611E98371)EACH4$3,500.00$3,837.00$3,500.00
53Catch basin, no. 7 (611E98390)EACH1$3,500.00$4,299.00$4,000.00
54Catch basin, no. 2-2A (611E98450)EACH1$3,500.00$4,203.00$4,800.00
55Catch basin, no. 2-2B (611E98470)EACH1$3,500.00$4,067.00$4,200.00
56Catch basin adjusted to grade (611E98630)EACH7$1,200.00$1,463.00$1,100.00
57Manhole, no. 3 (611E99574)EACH1$4,500.00$5,037.00$4,800.00
58Manhole adjusted to grade (611E99654)EACH3$1,500.00$1,350.00$1,200.00
59Special - trench drain (611E99830)FT5$500.00$630.00$2,300.00
60Trench drain, type A with pedestrian grate (839E29100)FT21$250.00$384.00$2,000.00
61Pavement planing, asphalt concrete, 3.0" (254E01000)SY113$50.00$60.00$100.00
62Asphalt concrete base, PG64-22, (449) (301E56000)CY9$500.00$520.00$1,200.00
63Aggregate base (304E20000)CY264$150.00$144.00$170.00
646" concrete base, class QC 1P (305E10010)SY71$168.00$119.00$150.00
65Tack coat (407E10000)GAL102$7.00$2.50$5.00
66Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY42$680.00$545.00$700.00
67Asphalt concrete intermediate course, type 2, (449) (441E70300)CY54$650.00$532.00$590.00
686" non-reinforced concrete pavement, class QC 1P (452E10010)SY690$135.00$104.00$110.00
698" non-reinforced concrete pavement, class QC 1P (452E12010)SY606$145.00$180.00$130.00
70Fire hydrant extended and adjusted to grade (638E10300)EACH2$3,900.00$4,266.00$2,500.00
71Fire hydrant adjusted to grade (638E10400)EACH1$2,500.00$4,266.00$2,200.00
72Fire hydrant removed and reset (638E10500)EACH2$5,500.00$5,035.00$6,200.00
73Valve box adjusted to grade (638E10800)EACH13$400.00$1,328.00$620.00
74Meter and chamber removed and reset (638E11100)EACH11$1,800.00$2,273.00$500.00
75Ground mounted support, no. 3 post (630E03100)FT198$28.00$21.50$25.00
76Street name sign support, no. 3 post (630E08520)FT90$28.50$21.50$25.00
77Sign, flat sheet (630E80100)SF138.80$28.00$25.00$30.00
78Sign, flat sheet, as per plan (630E80101)SF100$20.00$25.00$30.00
79Removal of ground mounted sign and disposal (630E84900)EACH29$28.00$18.00$20.00
80Removal of ground mounted post support and disposal (630E86002)EACH17$28.00$23.00$25.00
81School speed limit sign with flashing beacons, solar powered (631E93240)EACH1$8,850.00$10,200$12,000
82Pedestal foundation (632E64020)EACH1$5,000.00$987.00$1,100.00
83Pedestal, 14.4' tall, transformer base (632E89930)EACH1$5,000.00$1,264.00$1,400.00
84Crosswalk line, 12" (644E00620)FT490$6.25$11.00$10.00
85Removal of pavement marking (644E30000)FT72$15.00$44.00$50.00
86Water (616E10000)MGAL5$1.00$1.00$0.20
87Special - retaining wall, modular block wall (530E50010)SF318$190.00$180.00$210.00
88Premium for contract performance bond and for payment bond (103E05000)LS1$10,000$8,900.00$15,000
89Maintaining traffic (614E11000)LS1$85,000$75,157$63,000
90Construction layout stakes and surveying (623E10000)LS1$22,000$49,445$27,000
91Mobilization (624E10000)LS1$40,000$25,000$150,000
ODOT contract 260386: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.