ODOT contract 260280 bid tabulation

FRA-US 33-08.75 Culvert Repl. (CULVERT REPLACEMENT). Let by Ohio DOT on May 21, 2026, FRA. 2 bids received; low bid $2,223,194 by Complete General Construction Company, +31% against the engineer's estimate of $1,699,000.

Owner
Ohio DOT
Letting
21 MAY 2026
Pay items
72
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Complete General Construction Company$2,223,194Low+31%
2Axis Civil Construction LLC$2,472,520+11%+46%
ODOT contract 260280: bids by rank

Engineer's estimate: $1,699,000.

Bid tabulation

LinePay itemUnitQuantity1. Complete General Construction Company2. Axis Civil Construction LLC
1Clearing and grubbing (201E11000)LS1$36,500$30,000
2Structure removed (202E11004)EACH1$70,000$350,000
3Headwall removed (202E20010)EACH2$8,000.00$1,500.00
4Pavement removed (202E23000)SY884$30.00$19.00
5Pipe removed, 24" and under (202E35100)FT509$30.00$33.00
6Guardrail removed (202E38000)FT448$2.00$5.00
7Excavation (203E10000)CY881$17.00$32.00
8Embankment (203E20000)CY2,465$19.00$32.00
9Subgrade compaction (204E10000)SY1,039$6.00$4.00
10Guardrail, type MGS (606E15050)FT425$24.00$25.00
11Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH3$2,620.00$2,700.00
12Inspection and compaction testing of unbound materials (878E25000)LS1$25,500$30,000
13Riprap, type D (601E11000)SY21$900.00$300.00
14Tied concrete block mat with type 1 underlayment (601E21050)SY2$150.00$400.00
15Rock channel protection, type A with aggregate filter (601E32010)CY64$295.00$135.00
16Soil analysis test (659E00100)EACH2$85.00$200.00
17Topsoil (659E00300)CY194$30.00$75.00
18Seeding and mulching, class 5B, as per plan (659E00581)SY690$5.34$5.50
19Seeding and mulching (659E10000)SY1,056$3.80$3.00
20Repair seeding and mulching (659E14000)SY87$3.00$1.90
21Commercial fertilizer (659E20000)TON0.24$750.00$1,250.00
22Lime (659E31000)ACRE0.36$10.00$150.00
23Water (659E35000)MGAL10$1.00$1.00
24Erosion control (832E30000)EACH10,000$1.00$1.00
25Concrete masonry (602E20000)CY13.85$3,000.00$2,000.00
266" shallow pipe underdrains (605E11100)FT450$20.00$25.00
276" base pipe underdrains (605E14000)FT450$20.00$25.00
286" conduit, type F for underdrain outlets (611E00510)FT10$60.00$40.00
296" conduit, type B (611E00900)FT42$95.00$30.00
3015" conduit, type B, as per plan (611E05901)FT109$650.00$200.00
3115" conduit, type C (611E06100)FT105$500.00$132.00
3224" conduit, type B, as per plan (611E10401)FT145$725.00$260.00
33108" conduit, type A, 706.02 (611E32000)FT208$3,000.00$4,480.00
34Catch basin, no. 2-2B, as per plan (611E98471)EACH1$10,000$3,400.00
35Manhole, no. 3 (611E99574)EACH2$5,000.00$4,400.00
36Manhole, no. 4, as per plan (611E99601)EACH2$10,000$13,000
37Precast reinforced concrete outlet (611E99710)EACH1$500.00$450.00
38Pavement planing, asphalt concrete (T = 1.5") (254E01000)SY7,333$4.00$4.70
39Asphalt concrete base, PG64-22, (449) (301E56000)CY220$202.00$230.00
40Aggregate base (304E20000)CY173$85.00$129.00
41Tack coat (407E10000)GAL627$4.50$4.50
42Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY386$250.00$270.00
43Special - 12" water main dip class 52 push on joints and fittings (638E20174)FT255$325.00$290.00
44Special - 12" gate valve with valve box (columbus (638E20586)EACH2$5,000.00$10,000
45Barrier reflector, type 1 (bidirectional) (626E00102)EACH10$13.40$15.00
46Ground mounted support, no. 2 post (630E02100)FT28$20.00$25.00
47Sign, flat sheet (630E80100)SF6.50$30.00$30.00
48Removal of ground mounted sign and disposal (630E84900)EACH1$15.00$25.00
49Removal of ground mounted post support and disposal (630E86002)EACH2$20.00$25.00
50Lane line, 6", type 1 (642E00204)MI0.40$2,000.00$2,000.00
51Center line, type 1 (642E00300)MI0.20$2,000.00$2,000.00
52Edge line, 6" (644E00104)MI0.16$12,000$12,000
53Lane line, 6" (644E00204)MI0.06$7,000.00$7,000.00
54Center line (644E00300)MI0.08$24,000$24,000
55Channelizing line, 12" (644E00404)FT311$1.80$1.80
56Stop line (644E00500)FT62$8.00$8.00
57Transverse/diagonal line (644E00700)FT82$8.00$8.00
58Chevron marking (644E00720)FT68$8.00$8.00
59Lane arrow (644E01300)EACH4$98.00$98.00
60Law enforcement officer with patrol car for assistance (614E11110)HR40$95.00$65.00
61Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH1$2,200.00$3,000.00
62Detour signing (614E12420)LS1$15,000$15,000
63Asphalt concrete for maintaining traffic (614E13000)CY10$465.00$200.00
64Work zone edge line, class I, 6", 740.06, type I (614E22210)MI0.20$9,250.00$9,300.00
65Work zone arrow, class I, 740.06, type I (614E30400)EACH12$215.00$215.00
66Portable barrier, unanchored (622E41100)FT280$47.00$35.00
67Cofferdams and excavation bracing, as per plan (503E11101)LS1$395,000$225,000
68Premium for contract performance bond and for payment bond (103E05000)LS1$13,000$20,000
69Maintaining traffic (614E11000)LS1$40,000$35,000
70Field office, type B (619E16010)MNTH6$3,350.00$2,900.00
71Construction layout stakes and surveying, as per plan (623E10001)LS1$15,000$18,000
72Mobilization (624E10000)LS1$111,000$80,000
ODOT contract 260280: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy