ODOT contract 250443 bid tabulation
UNI-SR 38-03.21 (BRIDGE REPAIR). Let by Ohio DOT on September 25, 2025, UNI. 4 bids received; low bid $4,332,873 by Complete General Construction Company, +39% against the engineer's estimate of $3,125,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 69
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $4,332,873 | Low | +39% |
| 2 | Shelly & Sands Inc | $4,386,824 | +1.0% | +40% |
| 3 | Eagle Bridge Co | $5,000,549 | +15% | +60% |
| 4 | George J Igel & Co Inc | $5,093,937 | +18% | +63% |
Engineer's estimate: $3,125,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Shelly & Sands Inc | 3. Eagle Bridge Co | 4. George J Igel & Co Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 | $2,000.00 | $2,500.00 | $2,000.00 |
| 2 | Pavement removed (202E23000) | SY | 689 | $16.00 | $12.50 | $20.00 | $15.00 |
| 3 | Guardrail removed (202E38000) | FT | 457 | $2.00 | $2.80 | $5.00 | $5.00 |
| 4 | Excavation (203E10000) | CY | 169 | $26.00 | $30.00 | $55.00 | $30.00 |
| 5 | Embankment (203E20000) | CY | 169 | $35.00 | $20.00 | $22.00 | $42.50 |
| 6 | Guardrail, type MGS with long posts (606E15100) | FT | 457 | $22.40 | $22.00 | $22.00 | $26.50 |
| 7 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,515.00 | $2,500.00 | $2,500.00 | $2,650.00 |
| 8 | Soil analysis test (659E00100) | EACH | 1 | $150.00 | $150.00 | $100.00 | $150.00 |
| 9 | Topsoil (659E00300) | CY | 60 | $45.00 | $50.00 | $30.00 | $40.00 |
| 10 | Seeding and mulching (659E10000) | SY | 484 | $6.00 | $6.00 | $7.00 | $8.50 |
| 11 | Repair seeding and mulching (659E14000) | SY | 25 | $6.00 | $6.00 | $3.00 | $6.00 |
| 12 | Inter-seeding (659E15000) | SY | 25 | $6.00 | $6.00 | $3.00 | $6.00 |
| 13 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,250.00 | $1,250.00 | $2,000.00 | $1,250.00 |
| 14 | Lime (659E31000) | ACRE | 0.10 | $150.00 | $150.00 | $10.00 | $150.00 |
| 15 | Water (659E35000) | MGAL | 2.70 | $1.00 | $1.00 | $15.00 | $1.00 |
| 16 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | Aggregate drains (605E31100) | FT | 87 | $18.60 | $25.00 | $18.00 | $46.00 |
| 18 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 267 | $30.00 | $16.00 | $14.50 | $9.25 |
| 19 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 259 | $255.00 | $200.00 | $255.00 | $238.00 |
| 20 | Aggregate base (304E20000) | CY | 148 | $160.00 | $85.00 | $125.00 | $76.75 |
| 21 | Tack coat (407E10000) | GAL | 240 | $4.10 | $3.05 | $3.25 | $4.25 |
| 22 | Stabilized crushed aggregate (411E10000) | CY | 6 | $180.00 | $175.00 | $335.00 | $215.00 |
| 23 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 38 | $360.00 | $290.00 | $465.00 | $328.00 |
| 24 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 53 | $320.00 | $275.00 | $290.00 | $282.00 |
| 25 | Structure grounding system (625E33000) | EACH | 1 | $18,000 | $8,312.00 | $16,500 | $16,500 |
| 26 | RPM (621E00100) | EACH | 15 | $165.00 | $165.00 | $165.00 | $165.00 |
| 27 | Raised pavement marker removed (621E54000) | EACH | 15 | $13.00 | $5.50 | $20.00 | $30.00 |
| 28 | Barrier reflector, type 1, bidirectional (626E00102) | EACH | 4 | $12.30 | $10.00 | $10.00 | $13.00 |
| 29 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 10 | $13.70 | $12.00 | $12.00 | $13.00 |
| 30 | Ground mounted support, no. 2 post (630E02100) | FT | 12 | $28.00 | $18.00 | $18.00 | $18.00 |
| 31 | Sign, flat sheet (630E80100) | SF | 6.30 | $30.00 | $20.00 | $20.00 | $20.00 |
| 32 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $10.00 | $65.00 | $55.00 | $30.00 |
| 33 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $65.00 | $130.00 | $75.00 | $30.00 |
| 34 | Edge line, 6", type 1 (642E00104) | MI | 0.24 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 35 | Center line, type 1 (642E00300) | MI | 0.12 | $10,600 | $10,600 | $10,600 | $10,600 |
| 36 | Stop line, type 1 (642E00500) | FT | 21 | $7.40 | $7.40 | $7.40 | $7.40 |
| 37 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $380,000 | $230,000 | $475,000 | $677,000 |
| 38 | Approach slab removed (202E22900) | SY | 134 | $48.00 | $32.00 | $65.00 | $45.00 |
| 39 | Wearing course removed (202E23500) | SY | 972 | $13.00 | $7.00 | $15.00 | $15.00 |
| 40 | Unclassified excavation (503E21300) | LS | 1 | $25,000 | $13,000 | $40,000 | $25,000 |
| 41 | Epoxy coated steel reinforcement (509E10000) | LB | 89,576 | $1.60 | $1.35 | $1.50 | $1.35 |
| 42 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 508 | $20.00 | $30.00 | $30.00 | $27.00 |
| 43 | Semi-integral diaphragm guide (511E33500) | EACH | 2 | $4,600.00 | $5,000.00 | $5,000.00 | $4,200.00 |
| 44 | Class QC2 concrete, superstructure (511E34410) | CY | 49 | $925.00 | $1,200.00 | $1,500.00 | $736.50 |
| 45 | Class QC2 concrete, bridge deck, as per plan (511E34445) | CY | 243 | $1,400.00 | $1,200.00 | $1,800.00 | $1,300.00 |
| 46 | Class QC1 concrete, pier cap, as per plan (511E42511) | CY | 12 | $4,000.00 | $7,500.00 | $4,000.00 | $6,625.00 |
| 47 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 29 | $1,300.00 | $2,100.00 | $1,500.00 | $1,160.00 |
| 48 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 627 | $48.00 | $48.00 | $48.00 | $110.00 |
| 49 | Concrete repair by epoxy injection (512E10600) | FT | 4 | $250.00 | $225.00 | $500.00 | $398.00 |
| 50 | Structural steel members, level 3, as per plan (513E10261) | LB | 38,483 | $5.30 | $5.50 | $5.25 | $4.90 |
| 51 | Structural steel members, level 3, as per plan (513E10261) | LB | 236,128 | $4.36 | $4.30 | $5.25 | $5.15 |
| 52 | Welded stud shear connectors (513E20000) | EACH | 4,512 | $6.00 | $5.90 | $4.65 | $5.90 |
| 53 | Armorless preformed joint seal (516E10010) | FT | 90 | $155.00 | $155.00 | $65.00 | $62.00 |
| 54 | Semi-integral abutment expansion joint seal (516E14020) | FT | 114 | $55.00 | $55.00 | $40.00 | $40.00 |
| 55 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 10 | $1,900.00 | $2,100.00 | $2,250.00 | $2,900.00 |
| 56 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 5 | $1,700.00 | $2,300.00 | $2,250.00 | $3,100.00 |
| 57 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 10 | $1,500.00 | $2,200.00 | $2,000.00 | $3,000.00 |
| 58 | Railing (three steel tube bridge railing) (517E70100) | FT | 533 | $516.00 | $472.00 | $472.00 | $509.00 |
| 59 | Reinforced concrete approach slabs (T=15") (526E25000) | SY | 192 | $420.00 | $375.00 | $400.00 | $375.00 |
| 60 | Type C installation (526E90030) | FT | 90 | $335.00 | $180.00 | $315.00 | $240.00 |
| 61 | Special - retaining wall (walls behind abutments) (530E50000) | EACH | 2 | $28,000 | $40,000 | $45,000 | $32,500 |
| 62 | Patching concrete structures with trowelable mortar (843E50000) | SF | 123 | $285.00 | $285.00 | $340.00 | $193.00 |
| 63 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $24,000 | $30,000 | $23,000 |
| 64 | Maintaining traffic (614E11000) | LS | 1 | $12,000 | $10,000 | $30,000 | $21,000 |
| 65 | Construction layout stakes and surveying (623E10000) | LS | 1 | $22,000 | $21,000 | $10,000 | $15,000 |
| 66 | Mobilization (624E10000) | LS | 1 | $100,000 | $228,500 | $150,000 | $250,000 |
| 67 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 10,000 | $105.00 | $120.00 | $120.00 | $120.00 |
| 100 | Subgrade compaction (204E10000) | SY | 1,101 | $4.00 | $6.50 | $6.00 | $5.00 |
| 101 | Special - steel drip strip (518E22300) | FT | 637 | $14.85 | $15.75 | $15.00 | $14.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.