ODOT contract 250512 bid tabulation
FRA-EXPO CENTER/OHC-FY2026 (PARKING AREAS). Let by Ohio DOT on October 23, 2025, FRA. 7 bids received; low bid $1,024,417 by Shelly Company, -17% against the engineer's estimate of $1,232,000.
- Owner
- Ohio DOT
- Letting
- 23 OCT 2025
- Pay items
- 31
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $1,024,417 | Low | -17% |
| 2 | Strawser Paving Co Inc | $1,110,197 | +8.0% | -10% |
| 3 | Shelly & Sands Inc | $1,115,455 | +9.0% | -9.0% |
| 4 | George J Igel & Co Inc | $1,174,917 | +15% | -5.0% |
| 5 | Kokosing Construction Company Inc | $1,208,218 | +18% | -2.0% |
| 6 | Fillmore Construction | $1,427,550 | +39% | +16% |
| 7 | Alan Stone Co Inc | $1,600,755 | +56% | +30% |
Engineer's estimate: $1,232,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Strawser Paving Co Inc | 3. Shelly & Sands Inc | 4. George J Igel & Co Inc | 5. Kokosing Construction Company Inc | 6. Fillmore Construction |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Pavement removed, as per plan (202E23001) | SY | 27,526 | $2.30 | $5.25 | $5.10 | $2.40 | $4.64 | $3.75 |
| 2 | Curb removed, as per plan (202E32001) | FT | 2,221 | $4.25 | $18.00 | $8.50 | $5.50 | $23.00 | $10.00 |
| 3 | Subgrade compaction (204E10000) | SY | 27,526 | $1.00 | $0.50 | $1.00 | $1.00 | $0.30 | $3.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 5 | Pavement repair, as per plan (253E01001) | SY | 66 | $84.00 | $55.00 | $70.00 | $82.00 | $223.00 | $150.00 |
| 6 | Pavement repair, as per plan (253E01001) | SY | 226 | $85.00 | $68.00 | $75.00 | $66.00 | $225.00 | $200.00 |
| 7 | Pavement planing, asphalt CONCRETE1.5" (254E01000) | SY | 10,336 | $3.00 | $1.80 | $2.00 | $1.75 | $4.50 | $2.00 |
| 8 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,296 | $151.00 | $163.00 | $165.00 | $192.00 | $147.00 | $184.00 |
| 9 | Non-tracking tack coat (407E20000) | GAL | 2,399 | $4.00 | $5.00 | $3.50 | $4.75 | $2.65 | $3.50 |
| 10 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 1,585 | $203.00 | $226.75 | $190.00 | $251.00 | $208.00 | $226.00 |
| 11 | Curb, type 6 (609E26000) | FT | 2,221 | $36.50 | $26.00 | $40.00 | $23.50 | $36.00 | $100.00 |
| 12 | Ground mounted support, no. 2 post (630E02100) | FT | 126 | $16.00 | $15.00 | $20.25 | $19.50 | $16.00 | $16.00 |
| 13 | Ground mounted support, no. 3 post (630E03100) | FT | 180 | $16.50 | $30.00 | $20.85 | $22.00 | $16.50 | $16.50 |
| 14 | Sign, flat sheet (630E80100) | SF | 68.50 | $18.00 | $35.00 | $22.80 | $34.00 | $18.00 | $18.00 |
| 15 | Removal of ground mounted sign and disposal (630E84900) | EACH | 14 | $25.00 | $35.00 | $31.50 | $65.00 | $125.00 | $25.00 |
| 16 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $50.00 | $100.00 | $63.50 | $140.00 | $150.00 | $50.00 |
| 17 | Edge line, 4" (644E00100) | MI | 0.01 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 18 | Parking lot stall marking (644E01200) | FT | 19,012 | $1.89 | $1.89 | $1.89 | $1.90 | $1.89 | $1.89 |
| 19 | Handicap symbol marking (644E01600) | EACH | 27 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 20 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $4,500.00 | $3,750.00 | $3,310.00 | $5,000.00 | $4,000.00 | $8,500.00 |
| 21 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $5,500.00 | $4,256.32 | $6,000.00 | $5,000.00 | $8,500.00 |
| 22 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $1,500.00 | $10,500 | $5,000.00 | $24,474 | $17,500 |
| 23 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $9,500.00 | $1,500.00 | $5,000.00 | $3,700.00 | $318.88 | $17,500 |
| 24 | Mobilization (624E10000) | LS | 1 | $27,500 | $2,500.00 | $30,000 | $52,500 | $60,000 | $25,000 |
| 100 | Topsoil (659E00300) | CY | 51 | $135.00 | $75.00 | $75.00 | $50.00 | $185.00 | $100.00 |
| 101 | Seeding and mulching (659E10000) | SY | 493 | $6.90 | $3.00 | $6.50 | $4.55 | $6.50 | $5.00 |
| 102 | Repair seeding and mulching (659E14000) | SY | 24 | $10.00 | $1.00 | $6.50 | $5.00 | $6.50 | $5.00 |
| 103 | Inter-seeding (659E15000) | SY | 24 | $10.00 | $1.00 | $6.50 | $5.00 | $6.50 | $5.00 |
| 104 | Commercial fertilizer (659E20000) | TON | 0.07 | $800.00 | $1,000.00 | $800.00 | $2,850.00 | $1,250.00 | $5,000.00 |
| 105 | Lime (659E31000) | ACRE | 0.10 | $20.00 | $500.00 | $20.00 | $2,000.00 | $150.00 | $5,000.00 |
| 106 | Water (659E35000) | MGAL | 2 | $10.00 | $1.00 | $10.00 | $125.00 | $1.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 23, 2025. Compiled by Mirage Metrics.