ODOT contract 250018 bid tabulation
LIC-SR 37-19.18 (PART 1) (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on January 16, 2025, LIC. 3 bids received; low bid $4,915,311 by Complete General Construction Company, -4.9% against the engineer's estimate of $5,170,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 135
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $4,915,311 | Low | -5.0% |
| 2 | George J Igel & Co Inc | $5,317,418 | +8.0% | +3.0% |
| 3 | Shelly & Sands Inc | $6,159,925 | +25% | +19% |
Engineer's estimate: $5,170,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. George J Igel & Co Inc | 3. Shelly & Sands Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 | $20,000 | $25,000 |
| 2 | Wearing course removed (202E23500) | SY | 711 | $20.00 | $4.50 | $13.00 |
| 3 | Guardrail removed (202E38000) | FT | 350 | $2.00 | $3.50 | $3.50 |
| 4 | Excavation, as per plan (203E10001) | CY | 18 | $200.00 | $70.00 | $100.00 |
| 5 | Subgrade compaction (204E10000) | SY | 258 | $9.00 | $6.00 | $9.00 |
| 6 | Reshaping under guardrail (209E15000) | STA | 2.75 | $60.00 | $50.00 | $50.00 |
| 7 | Borrow (209E70000) | CY | 20 | $50.00 | $23.00 | $60.00 |
| 8 | Guardrail, type MGS with long posts (606E15100) | FT | 206 | $19.50 | $23.00 | $22.50 |
| 9 | Anchor assembly, MGS type B (606E26050) | EACH | 2 | $2,460.00 | $2,500.00 | $2,500.00 |
| 10 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,520.00 | $2,600.00 | $2,600.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,380.00 | $1,250.00 | $1,250.00 |
| 12 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,550.00 | $2,600.00 | $2,600.00 |
| 13 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 7 | $150.00 | $200.00 | $150.00 |
| 14 | Rock channel protection, type B with filter (601E32100) | CY | 243 | $95.00 | $83.00 | $125.00 |
| 15 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $200.00 | $435.00 | $410.00 |
| 16 | Seeding and mulching, class 2 (659E00510) | SY | 1,500 | $2.42 | $4.00 | $2.42 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.21 | $865.90 | $865.90 | $866.00 |
| 18 | Lime (659E31000) | ACRE | 0.32 | $149.97 | $149.97 | $150.00 |
| 19 | Water (659E35000) | MGAL | 8.10 | $1.00 | $1.00 | $1.00 |
| 20 | Erosion control (832E30000) | EACH | 1,100 | $1.00 | $1.00 | $1.00 |
| 21 | Full depth pavement sawing (252E01500) | FT | 130 | $8.00 | $2.00 | $5.00 |
| 22 | Pavement repair (253E02000) | CY | 375 | $348.00 | $320.00 | $348.00 |
| 23 | Pavement planing, asphalt concrete (3" thickness) (254E01000) | SY | 4,006 | $4.50 | $4.00 | $4.50 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 306 | $239.00 | $210.00 | $239.00 |
| 25 | Aggregate base (304E20000) | CY | 61 | $95.00 | $80.00 | $150.00 |
| 26 | Non-tracking tack coat (407E20000) | GAL | 757 | $3.90 | $6.00 | $3.90 |
| 27 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 252 | $260.00 | $250.00 | $260.00 |
| 28 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 206 | $210.00 | $250.00 | $210.00 |
| 29 | Compacted aggregate, as per plan (617E10101) | CY | 30 | $200.00 | $100.00 | $140.00 |
| 30 | Special - reinforced mesh for transverse and/or longitudinal joints and cracks (690E12050) | SY | 76 | $30.00 | $70.00 | $30.00 |
| 31 | RPM (621E00100) | EACH | 14 | $296.60 | $220.00 | $220.00 |
| 32 | Raised pavement marker removed (621E54000) | EACH | 14 | $75.00 | $15.00 | $20.00 |
| 33 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 14 | $12.20 | $12.00 | $12.00 |
| 34 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 48 | $17.50 | $18.00 | $18.00 |
| 35 | Sign, flat sheet (630E80100) | SF | 12 | $25.00 | $25.00 | $25.00 |
| 36 | Edge line, 4", type 1 (642E00100) | MI | 3 | $765.00 | $700.00 | $700.00 |
| 37 | Center line, type 1 (642E00300) | MI | 3.75 | $1,550.00 | $1,392.00 | $1,392.00 |
| 38 | Edge line, 6" (646E10010) | MI | 0.49 | $8,695.00 | $10,175 | $10,175 |
| 39 | Center line (646E10200) | MI | 0.26 | $11,255 | $13,700 | $13,700 |
| 40 | Stop line (646E10400) | FT | 31 | $15.00 | $10.00 | $10.00 |
| 41 | Railroad symbol marking (646E20000) | EACH | 1 | $750.00 | $1,500.00 | $1,500.00 |
| 42 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $215,000 | $180,000 | $250,000 |
| 43 | Approach slab removed (202E22900) | SY | 222 | $75.00 | $45.00 | $30.00 |
| 44 | Bridge railing removed (202E38500) | FT | 238 | $4.40 | $10.00 | $10.00 |
| 45 | Unclassified excavation (503E21300) | LS | 1 | $35,000 | $50,000 | $30,000 |
| 46 | Galvanized steel reinforcement (509E26000) | LB | 73,463 | $2.00 | $2.00 | $1.80 |
| 47 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 362 | $25.00 | $33.00 | $30.00 |
| 48 | Class QC2 concrete, superstructure, as per plan (511E32211) | CY | 283 | $1,500.00 | $1,450.00 | $1,450.00 |
| 49 | Class QC1 concrete, abutment including footing (511E43510) | CY | 39 | $1,825.00 | $1,350.00 | $2,200.00 |
| 50 | 1/2" preformed expansion joint filler, as per plan (516E13201) | SF | 152 | $15.00 | $27.00 | $9.00 |
| 51 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 262 | $20.00 | $32.00 | $10.00 |
| 52 | Semi-integral abutment expansion joint seal (516E14020) | FT | 136 | $42.50 | $37.00 | $42.00 |
| 53 | 2" deep joint sealer, as per plan (516E31011) | FT | 114 | $24.00 | $30.00 | $24.00 |
| 54 | Elastomeric bearing pad, misc.: (1 1/2" X 8" X 2'- (516E42000) | EACH | 34 | $725.00 | $340.00 | $260.00 |
| 55 | Railing (three steel tube bridge railing) (517E70100) | FT | 218 | $475.00 | $460.00 | $452.00 |
| 56 | Porous backfill with geotextile fabric (518E21200) | CY | 47 | $145.06 | $130.00 | $150.00 |
| 57 | Special - steel drip strip (518E22300) | FT | 212 | $15.50 | $15.00 | $15.50 |
| 58 | 6" perforated corrugated plastic pipe (518E40000) | FT | 148 | $15.00 | $12.00 | $6.00 |
| 59 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $20.00 | $19.00 | $6.00 |
| 60 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 238 | $425.00 | $460.00 | $550.00 |
| 61 | Traffic compacted surface, type C (410E13000) | CY | 30 | $115.00 | $88.00 | $115.00 |
| 62 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $92.00 | $100.00 | $110.00 |
| 63 | Detour signing, as per plan (614E12421) | LS | 1 | $6,060.00 | $8,000.00 | $5,000.00 |
| 64 | Asphalt concrete for maintaining traffic (614E13000) | CY | 15 | $750.00 | $420.00 | $400.00 |
| 65 | Portable changeable message sign, as per plan (614E18601) | SNMT | 18 | $1,000.00 | $530.00 | $1,250.00 |
| 66 | Clearing and grubbing (201E11000) | LS | 1 | $45,000 | $55,000 | $47,000 |
| 67 | Pavement removed (202E23000) | SY | 769 | $20.00 | $19.00 | $15.00 |
| 68 | Guardrail removed (202E38000) | FT | 391 | $2.00 | $3.50 | $3.50 |
| 69 | Anchor assembly removed, type E (202E42010) | EACH | 3 | $145.00 | $225.00 | $225.00 |
| 70 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $95.00 | $150.00 | $150.00 |
| 71 | Fence removed (202E75000) | FT | 803 | $4.50 | $5.00 | $5.00 |
| 72 | Excavation (203E10000) | CY | 200 | $20.00 | $33.00 | $40.00 |
| 73 | Embankment (203E20000) | CY | 355 | $25.00 | $15.00 | $50.00 |
| 74 | Guardrail, type MGS (606E15050) | FT | 337.50 | $18.60 | $25.00 | $25.00 |
| 75 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,520.00 | $2,600.00 | $2,600.00 |
| 76 | Anchor assembly, MGS type T (606E26550) | EACH | 3 | $1,380.00 | $1,250.00 | $1,250.00 |
| 77 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $4,000.00 | $1,950.00 | $2,500.00 |
| 78 | Post construction survey monument verification and report (623E51000) | LS | 1 | $4,000.00 | $1,950.00 | $2,500.00 |
| 79 | Soil analysis test (659E00100) | EACH | 2 | $125.00 | $125.00 | $125.00 |
| 80 | Topsoil (659E00300) | CY | 275 | $50.00 | $60.00 | $40.00 |
| 81 | Seeding and mulching, class 3B (659E00530) | SY | 4,071 | $1.02 | $2.40 | $1.03 |
| 82 | Repair seeding and mulching (659E14000) | SY | 124 | $1.80 | $1.80 | $1.80 |
| 83 | Inter-seeding (659E15000) | SY | 124 | $1.80 | $1.80 | $1.80 |
| 84 | Commercial fertilizer (659E20000) | TON | 0.33 | $911.97 | $911.97 | $912.00 |
| 85 | Lime (659E31000) | ACRE | 0.51 | $158.78 | $158.78 | $159.00 |
| 86 | Water (659E35000) | MGAL | 14 | $1.00 | $1.00 | $1.00 |
| 87 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 |
| 88 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 301 | $90.00 | $100.00 | $120.00 |
| 89 | Subgrade compaction (204E10000) | SY | 873 | $7.00 | $3.00 | $8.00 |
| 90 | Pavement repair (253E02000) | CY | 125 | $348.00 | $320.00 | $348.00 |
| 91 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 314 | $237.00 | $225.00 | $237.00 |
| 92 | Aggregate base (304E20000) | CY | 200 | $95.00 | $88.00 | $140.00 |
| 93 | Non-tracking tack coat (407E20000) | GAL | 149 | $3.90 | $6.00 | $3.90 |
| 94 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 25 | $380.00 | $350.00 | $380.00 |
| 95 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 30 | $325.00 | $370.00 | $325.00 |
| 96 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 40 | $310.00 | $375.00 | $310.00 |
| 97 | Compacted aggregate, as per plan (617E10101) | CY | 19 | $250.00 | $160.00 | $187.00 |
| 98 | RPM (621E00100) | EACH | 3 | $296.60 | $220.00 | $220.00 |
| 99 | Raised pavement marker removed (621E54000) | EACH | 3 | $150.00 | $34.00 | $45.00 |
| 100 | Barrier reflector, type 2(BI-directional) (626E00110) | EACH | 8 | $12.25 | $12.00 | $12.00 |
| 101 | Edge line, 4", type 1 (642E00100) | MI | 1 | $765.00 | $700.00 | $700.00 |
| 102 | Center line, type 1 (642E00300) | MI | 1.25 | $1,550.00 | $1,392.00 | $1,392.00 |
| 103 | Edge line, 6" (646E10010) | MI | 0.10 | $8,695.00 | $10,175 | $10,175 |
| 104 | Center line (646E10200) | MI | 0.05 | $11,255 | $13,700 | $13,700 |
| 105 | Stop line (646E10400) | FT | 24 | $15.00 | $10.00 | $10.00 |
| 106 | Structure removed, over 20 foot span (202E11002) | LS | 1 | $50,000 | $120,000 | $75,000 |
| 107 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $200,000 | $280,000 | $470,000 |
| 108 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $50,000 | $400,000 | $300,000 |
| 109 | Steel piles, misc.:W27X94, furnished and installed (507E00400) | FT | 3,570 | $70.00 | $80.00 | $75.00 |
| 110 | Galvanized steel reinforcement (509E26000) | LB | 7,442 | $2.00 | $2.00 | $1.80 |
| 111 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 3 | $3,500.00 | $3,200.00 | $2,925.00 |
| 112 | Class QC1 concrete, footing (511E46510) | CY | 125 | $800.00 | $820.00 | $800.00 |
| 113 | Concrete, misc.:pneumatically placed concrete - SH (511E71200) | SF | 5,136 | $50.00 | $76.00 | $75.00 |
| 114 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 641 | $13.50 | $13.00 | $13.50 |
| 115 | Type 2 waterproofing (512E33000) | SY | 402 | $24.00 | $24.00 | $24.00 |
| 116 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 62 | $30.00 | $32.00 | $6.00 |
| 117 | Porous backfill with geotextile fabric (518E21200) | CY | 33 | $175.00 | $170.00 | $188.00 |
| 118 | 6" perforated corrugated plastic pipe, as per plan (518E40001) | FT | 223 | $10.00 | $25.00 | $16.00 |
| 119 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 3,623 | $235.00 | $175.00 | $250.00 |
| 120 | Conduit, type A, precast reinforced concrete arch sections, as per plan (611E71001) | FT | 66 | $4,200.00 | $4,850.00 | $8,500.00 |
| 121 | Precast gravity and semigravity retaining wall (851E10000) | SF | 734 | $175.00 | $121.00 | $175.00 |
| 122 | On-site assistance (851E14000) | DAY | 2 | $750.00 | $1.00 | $2,200.00 |
| 123 | PGSRW inspection and compaction testing (851E15500) | LS | 1 | $8,800.00 | $11,500 | $4,900.00 |
| 124 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $80.00 | $100.00 | $110.00 |
| 125 | Detour signing, as per plan (614E12421) | LS | 1 | $5,000.00 | $8,000.00 | $5,000.00 |
| 126 | Asphalt concrete for maintaining traffic (614E13000) | CY | 5 | $750.00 | $460.00 | $560.00 |
| 127 | Portable changeable message sign, as per plan (614E18601) | SNMT | 18 | $1,000.00 | $530.00 | $1,250.00 |
| 128 | Water (616E10000) | MGAL | 6 | $100.00 | $46.00 | $60.00 |
| 129 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $20,000 | $10,300 | $16,000 |
| 130 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $27,000 | $23,000 | $35,000 |
| 131 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $35,000 | $30,000 |
| 132 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $30,000 | $60,000 | $100,000 |
| 133 | Mobilization (624E10000) | LS | 1 | $247,500 | $250,000 | $300,000 |
| 134 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 5,000 | $57.00 | $55.00 | $60.00 |
| 200 | Full depth pavement sawing (252E01500) | FT | 57 | $2.00 | $2.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.