ODOT contract 250128 bid tabulation
MEG-US 33-13.98 (MAJOR WIDENING). Let by Ohio DOT on February 27, 2025, MEG. 6 bids received; low bid $31,149,716 by Kokosing Construction Company Inc, -1.1% against the engineer's estimate of $31,509,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 201
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $31,149,716 | Low | -1.0% |
| 2 | Allard Excavation LLC | $34,982,063 | +12% | +11% |
| 3 | George J Igel & Co Inc | $36,145,902 | +16% | +15% |
| 4 | Kanawha Stone Company Incorporated | $36,334,852 | +17% | +15% |
| 5 | Triton Construction Inc | $38,518,205 | +24% | +22% |
| 6 | Alan Stone Co Inc | $40,417,626 | +30% | +28% |
Engineer's estimate: $31,509,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Allard Excavation LLC | 3. George J Igel & Co Inc | 4. Kanawha Stone Company Incorporated | 5. Triton Construction Inc | 6. Alan Stone Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $100,000 | $950,000 | $935,000 | $1,549,991 | $403,953 | $650,000 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $350.00 | $256.00 | $550.00 | $457.24 | $500.00 | $470.00 |
| 3 | Pavement removed (202E23000) | SY | 28,966 | $5.00 | $10.00 | $6.50 | $5.19 | $5.00 | $10.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 110 | $16.00 | $7.00 | $4.50 | $16.53 | $30.00 | $15.00 |
| 5 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 565 | $12.00 | $7.00 | $4.00 | $24.59 | $50.00 | $15.00 |
| 6 | Guardrail removed (202E38000) | FT | 19,827.50 | $1.80 | $2.00 | $1.80 | $1.90 | $3.00 | $2.50 |
| 7 | Impact attenuator removed (202E47800) | EACH | 1 | $150.00 | $186.00 | $150.00 | $150.00 | $500.00 | $160.00 |
| 8 | Catch basin removed (202E58100) | EACH | 1 | $1,700.00 | $390.00 | $200.00 | $1,077.28 | $1,500.00 | $470.00 |
| 9 | Fence removed (202E75000) | FT | 924 | $5.00 | $2.00 | $6.50 | $4.05 | $4.00 | $5.00 |
| 10 | Excavation (203E10000) | CY | 931,325 | $6.25 | $8.25 | $9.00 | $8.00 | $10.00 | $12.00 |
| 11 | Embankment (203E20000) | CY | 507,036 | $0.95 | $3.00 | $2.25 | $1.59 | $2.00 | $2.00 |
| 12 | Granular material, type C, as per plan (203E35121) | CY | 470 | $116.00 | $109.00 | $110.00 | $111.60 | $120.00 | $120.00 |
| 13 | Special - settlement platform (203E65000) | EACH | 3 | $1,340.00 | $5,961.00 | $6,300.00 | $6,783.79 | $1,200.00 | $6,100.00 |
| 14 | Subgrade compaction (204E10000) | SY | 133,105 | $1.77 | $1.42 | $1.00 | $2.05 | $2.00 | $1.50 |
| 15 | Excavation of subgrade (204E13000) | CY | 8,317 | $6.25 | $8.00 | $21.75 | $3.62 | $10.00 | $20.00 |
| 16 | Granular material, type B, as per plan (204E30011) | CY | 8,317 | $85.00 | $91.00 | $100.00 | $119.24 | $120.00 | $70.00 |
| 17 | Proof rolling (204E45000) | HR | 45 | $250.00 | $268.00 | $120.00 | $255.50 | $250.00 | $1,000.00 |
| 18 | Pre-blast condition survey (208E10000) | LS | 1 | $34,775 | $8,595.00 | $34,755 | $34,755 | $25,000 | $95,000 |
| 19 | Blasting consultant (208E12000) | LS | 1 | $5,000.00 | $5,500.00 | $5,500.00 | $5,500.00 | $10,000 | $60,000 |
| 20 | Air blast and noise control (208E13000) | LS | 1 | $8,775.00 | $10,000 | $15,600 | $7,800.00 | $15,000 | $17,000 |
| 21 | Vibration control and monitoring (208E14000) | LS | 1 | $8,775.00 | $10,000 | $15,600 | $7,800.00 | $30,000 | $15,000 |
| 22 | Hydrologist (208E16000) | LS | 1 | $15,300 | $45,000 | $27,300 | $46,500 | $90,000 | $150,000 |
| 23 | Reshaping under guardrail (209E15000) | STA | 132.50 | $85.00 | $64.00 | $280.00 | $89.88 | $80.00 | $150.00 |
| 24 | Borrow (209E70000) | CY | 350.80 | $85.00 | $43.00 | $31.00 | $66.07 | $80.00 | $25.00 |
| 25 | Guardrail, type MGS (606E15050) | FT | 20,925 | $16.78 | $16.78 | $16.78 | $16.78 | $16.78 | $20.00 |
| 26 | MGS guardrail, type 8 (606E15400) | FT | 2,450 | $25.62 | $25.92 | $25.62 | $25.62 | $25.62 | $30.00 |
| 27 | Guardrail, barrier design, type MGS (606E15550) | FT | 62.50 | $31.20 | $31.20 | $31.20 | $31.20 | $31.20 | $35.00 |
| 28 | Raising type MGS guardrail (606E17050) | FT | 2,087.50 | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 | $5.00 |
| 29 | Post end anchor (or concrete block end anchor) (606E17500) | EACH | 18 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,280.00 | $1,500.00 |
| 30 | Anchor assembly, MGS type E, (MASH 2016) (606E26150) | EACH | 6 | $2,180.00 | $2,180.00 | $2,180.00 | $2,180.00 | $2,180.00 | $2,500.00 |
| 31 | Anchor assembly, MGS type T (606E26550) | EACH | 26 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,100.00 |
| 32 | Anchor assembly rebuilt, MGS type B (606E27846) | EACH | 1 | $760.00 | $760.00 | $760.00 | $760.00 | $760.00 | $870.00 |
| 33 | Anchor assembly rebuilt, MGS type T (606E27910) | EACH | 1 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $510.00 |
| 34 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 3 | $1,980.00 | $1,980.00 | $1,980.00 | $1,980.00 | $1,980.00 | $2,300.00 |
| 35 | MGS bridge terminal assembly rebuilt, type 1 (606E35012) | EACH | 2 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,400.00 |
| 36 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $340.00 | $340.00 | $340.00 | $340.00 | $340.00 | $390.00 |
| 37 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $8,600.00 |
| 38 | Fence, type 47 (607E15000) | FT | 853 | $15.16 | $15.16 | $15.16 | $15.16 | $15.16 | $15.00 |
| 39 | Reference monument, type A (623E40500) | EACH | 60 | $480.00 | $789.00 | $760.00 | $784.42 | $700.00 | $1,200.00 |
| 40 | Dumped rock fill, type A (601E25000) | CY | 27 | $140.00 | $105.00 | $130.00 | $164.38 | $170.00 | $120.00 |
| 41 | Dumped rock fill, type B, as per plan (601E26001) | CY | 3,056 | $11.00 | $104.00 | $115.00 | $128.95 | $140.00 | $65.00 |
| 42 | Rock channel protection, type B with filter (601E32100) | CY | 892 | $140.00 | $115.00 | $120.00 | $135.91 | $125.00 | $75.00 |
| 43 | Rock channel protection, type C with filter (601E32200) | CY | 1,382 | $145.00 | $115.00 | $120.00 | $131.28 | $160.00 | $70.00 |
| 44 | Water (616E10000) | MGAL | 4,300 | $70.00 | $1.00 | $38.00 | $65.99 | $20.00 | $35.00 |
| 45 | Topsoil (659E00300) | CY | 8,983 | $9.00 | $20.00 | $7.00 | $30.07 | $25.00 | $15.00 |
| 46 | Seeding and mulching (659E10000) | SY | 393,050 | $0.60 | $0.48 | $0.65 | $0.75 | $0.60 | $0.60 |
| 47 | Seeding and mulching, as per plan (659E10001) | SY | 39,133 | $0.55 | $1.00 | $0.85 | $1.00 | $0.55 | $1.00 |
| 48 | Repair seeding and mulching (659E14000) | SY | 21,610 | $0.60 | $1.00 | $0.65 | $0.75 | $0.60 | $0.50 |
| 49 | Inter-seeding (659E15000) | SY | 21,610 | $0.01 | $0.01 | $0.65 | $1.00 | $0.01 | $0.01 |
| 50 | Commercial fertilizer (659E20000) | TON | 39 | $250.00 | $1,863.00 | $1,250.00 | $1,250.00 | $250.00 | $1,700.00 |
| 51 | Lime (659E31000) | ACRE | 89.30 | $25.00 | $185.00 | $150.00 | $150.00 | $25.00 | $230.00 |
| 52 | Water (659E35000) | MGAL | 1,167 | $0.01 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 |
| 53 | Mowing (659E40000) | MSF | 3,168 | $1.00 | $1.00 | $10.00 | $10.00 | $12.00 | $1.00 |
| 54 | Ditch erosion protection (670E00700) | SY | 88,117 | $1.15 | $2.00 | $2.50 | $2.50 | $1.15 | $2.00 |
| 55 | Storm water pollution prevention plan (832E15000) | LS | 1 | $8,375.00 | $15,000 | $8,500.00 | $8,857.03 | $30,000 | $9,600.00 |
| 56 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $40,000 | $65,000 | $43,700 | $29,189 | $130,000 | $59,000 |
| 57 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $40,000 | $40,000 | $29,300 | $41,216 | $35,000 | $33,000 |
| 58 | Erosion control (832E30000) | EACH | 800,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 59 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 1,073 | $5.00 | $6.00 | $6.00 | $6.00 | $5.00 | $5.00 |
| 60 | Rock excavation (503E31100) | CY | 814 | $35.00 | $22.00 | $69.50 | $144.89 | $75.00 | $20.00 |
| 61 | Concrete masonry (602E20000) | CY | 8.19 | $6,420.00 | $4,142.00 | $3,500.00 | $4,695.49 | $6,500.00 | $3,000.00 |
| 62 | 6" shallow pipe underdrains (605E11100) | FT | 16,446 | $14.00 | $14.00 | $12.00 | $13.48 | $16.00 | $20.00 |
| 63 | 6" unclassified pipe underdrains (605E13300) | FT | 11,122 | $22.00 | $14.00 | $11.00 | $15.07 | $18.00 | $20.00 |
| 64 | 6" unclassified pipe underdrains for springs (605E13402) | FT | 1,200 | $30.00 | $30.00 | $15.75 | $19.53 | $30.00 | $20.00 |
| 65 | 6" rock cut underdrains (605E13500) | FT | 28,000 | $18.00 | $23.00 | $16.00 | $17.71 | $17.00 | $20.00 |
| 66 | 6" base pipe underdrains (605E14000) | FT | 13,058 | $9.00 | $13.00 | $9.00 | $11.37 | $12.00 | $15.00 |
| 67 | Aggregate drains for springs (605E32200) | FT | 200 | $16.00 | $46.00 | $22.75 | $48.29 | $30.00 | $25.00 |
| 68 | 4" conduit, type F (611E00406) | FT | 453 | $60.00 | $26.00 | $48.00 | $38.31 | $25.00 | $30.00 |
| 69 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 2,126 | $34.00 | $22.00 | $28.00 | $25.38 | $24.00 | $30.00 |
| 70 | 6" conduit, type F (611E01500) | FT | 10 | $67.00 | $16.00 | $65.00 | $80.18 | $30.00 | $60.00 |
| 71 | 12" conduit, type B (611E04400) | FT | 835 | $190.00 | $102.00 | $220.00 | $101.10 | $160.00 | $100.00 |
| 72 | 12" conduit, type C (611E04600) | FT | 1,000 | $145.00 | $65.00 | $75.00 | $93.19 | $160.00 | $100.00 |
| 73 | 18" conduit, type B (611E07400) | FT | 1,391 | $210.00 | $121.00 | $340.00 | $118.26 | $210.00 | $95.00 |
| 74 | 18" conduit, type C (611E07600) | FT | 200 | $190.00 | $93.00 | $100.00 | $107.48 | $210.00 | $120.00 |
| 75 | 21" conduit, type B (611E08900) | FT | 628 | $270.00 | $137.00 | $270.00 | $134.96 | $240.00 | $130.00 |
| 76 | Conduit, misc.: class QC1 concrete backfill (611E97600) | CY | 105 | $330.00 | $358.00 | $310.00 | $589.89 | $400.00 | $300.00 |
| 77 | Catch basin, no. 4 (611E98230) | EACH | 18 | $9,930.00 | $5,148.00 | $5,500.00 | $7,372.75 | $9,500.00 | $5,600.00 |
| 78 | Catch basin, no. 8 (611E98410) | EACH | 2 | $9,345.00 | $4,535.00 | $3,900.00 | $6,674.00 | $8,500.00 | $4,800.00 |
| 79 | Catch basin, no. 2-2C, as per plan (611E98505) | EACH | 13 | $4,710.00 | $3,099.00 | $4,100.00 | $4,450.03 | $4,200.00 | $2,800.00 |
| 80 | Manhole, no. 3, as per plan (611E99575) | EACH | 1 | $7,485.00 | $4,993.00 | $11,000 | $6,170.56 | $6,500.00 | $4,200.00 |
| 81 | Precast reinforced concrete outlet (611E99710) | EACH | 11 | $950.00 | $448.00 | $364.00 | $475.90 | $450.00 | $650.00 |
| 82 | Full depth pavement sawing (252E01500) | FT | 27,439 | $2.47 | $2.85 | $1.98 | $1.90 | $5.00 | $3.00 |
| 83 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 837 | $13.50 | $13.50 | $13.50 | $2.41 | $14.00 | $9.00 |
| 84 | Pavement planing, portland cement concrete, 1.5" (254E01010) | SY | 2,498 | $12.00 | $13.50 | $13.50 | $10.46 | $14.00 | $7.00 |
| 85 | Pavement planing, portland cement concrete, variab (254E01010) | SY | 153 | $66.50 | $13.50 | $13.50 | $13.75 | $14.00 | $40.00 |
| 86 | Full depth pavement removal and rigid replacement, type 1, class QC1 (255E11000) | SY | 1,997 | $225.00 | $273.00 | $171.25 | $338.00 | $235.00 | $260.00 |
| 87 | Full depth pavement sawing (255E20000) | FT | 6,200 | $3.90 | $5.00 | $3.00 | $3.00 | $5.00 | $5.50 |
| 88 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 19,377 | $190.00 | $193.35 | $198.10 | $198.10 | $208.00 | $230.00 |
| 89 | Aggregate base (304E20000) | CY | 21,687 | $95.00 | $92.00 | $102.00 | $120.79 | $105.00 | $100.00 |
| 90 | Tack coat, 702.13 (407E13900) | GAL | 12,544 | $4.05 | $4.05 | $4.05 | $4.05 | $4.05 | $4.50 |
| 91 | Non-tracking tack coat (407E20000) | GAL | 20,192 | $4.45 | $4.35 | $4.45 | $4.45 | $4.45 | $5.00 |
| 92 | Prime coat (408E10000) | GAL | 2,790 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 93 | Asphalt concrete intermediate course, type 1, (449), (under guardrail) (441E70800) | CY | 662.60 | $341.00 | $345.00 | $345.00 | $345.00 | $362.00 | $390.00 |
| 94 | Anti-segregation equipment (442E00100) | CY | 16,187 | $7.00 | $7.00 | $7.00 | $7.00 | $8.00 | $8.00 |
| 95 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 6,064 | $205.00 | $208.00 | $212.50 | $212.50 | $225.00 | $240.00 |
| 96 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 9,607 | $200.00 | $204.00 | $207.50 | $207.50 | $220.00 | $240.00 |
| 97 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 11,730 | $235.00 | $241.50 | $242.00 | $242.00 | $255.00 | $280.00 |
| 98 | Compacted aggregate (617E10100) | CY | 364 | $135.00 | $135.00 | $135.00 | $87.12 | $145.00 | $120.00 |
| 99 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 23.20 | $880.00 | $635.00 | $1,150.00 | $1,320.00 | $635.00 | $1,500.00 |
| 100 | Connection, fused pull apart (625E00450) | EACH | 4 | $226.00 | $140.00 | $115.00 | $140.00 | $140.00 | $180.00 |
| 101 | Connection, unfused pull apart (625E00460) | EACH | 4 | $220.00 | $140.00 | $115.00 | $140.00 | $140.00 | $180.00 |
| 102 | Connection, unfused permanent (625E00480) | EACH | 10 | $192.00 | $140.00 | $115.00 | $140.00 | $140.00 | $180.00 |
| 103 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 3 | $3,960.00 | $3,550.00 | $2,900.00 | $3,550.00 | $3,550.00 | $4,500.00 |
| 104 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,605 | $4.60 | $3.50 | $3.80 | $3.50 | $3.50 | $4.50 |
| 105 | No. 10 AWG pole and bracket cable (625E23400) | FT | 744 | $2.60 | $2.50 | $1.75 | $2.50 | $2.50 | $3.00 |
| 106 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 144 | $39.00 | $33.00 | $12.00 | $33.00 | $33.00 | $40.00 |
| 107 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 371 | $142.50 | $52.00 | $50.00 | $52.00 | $52.00 | $65.00 |
| 108 | Conduit cleaned and cables removed (625E25910) | FT | 149 | $6.10 | $1.00 | $1.00 | $1.00 | $1.00 | $1.50 |
| 109 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 4 | $530.00 | $775.00 | $575.00 | $775.00 | $775.00 | $980.00 |
| 110 | Trench, 24" deep (625E29002) | FT | 104 | $26.00 | $10.00 | $14.00 | $10.00 | $10.00 | $15.00 |
| 111 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $1,820.00 | $1,450.00 | $1,150.00 | $1,450.00 | $1,450.00 | $1,800.00 |
| 112 | Ground rod (625E32000) | EACH | 4 | $350.00 | $325.00 | $276.00 | $325.00 | $325.00 | $410.00 |
| 113 | Power service, as per plan (625E34001) | EACH | 2 | $18,800 | $7,700.00 | $8,925.00 | $7,700.00 | $7,700.00 | $9,800.00 |
| 114 | Remove and reerect existing light pole (625E35010) | EACH | 4 | $3,110.00 | $1,400.00 | $1,375.00 | $1,400.00 | $1,400.00 | $1,800.00 |
| 115 | Underground warning marking tape (625E36010) | FT | 104 | $8.50 | $1.00 | $3.00 | $1.00 | $1.00 | $1.50 |
| 116 | Power service removed (625E75510) | EACH | 2 | $1,650.00 | $500.00 | $650.00 | $500.00 | $500.00 | $630.00 |
| 117 | Luminaire support foundation removed (625E75522) | EACH | 3 | $750.00 | $650.00 | $500.00 | $650.00 | $650.00 | $820.00 |
| 118 | Distribution cable removed, as per plan (625E75551) | FT | 480 | $4.80 | $1.50 | $1.00 | $1.50 | $1.50 | $2.00 |
| 119 | Arc flash calculations and label (PS-1 at US 33 & (625E76000) | EACH | 1 | $630.00 | $2,350.00 | $4,000.00 | $2,350.00 | $2,350.00 | $3,000.00 |
| 120 | Arc flash calculations and label (PS-1 at US 33 & (625E76000) | EACH | 1 | $630.00 | $2,350.00 | $4,000.00 | $2,350.00 | $2,350.00 | $3,000.00 |
| 121 | Lighting, misc.: reuse and rehabilitation of exist (625E98000) | EACH | 1 | $2,700.00 | $1,250.00 | $250.00 | $1,250.00 | $1,250.00 | $1,600.00 |
| 122 | Lighting, misc.: reuse and rehabilitation of exist (625E98000) | EACH | 3 | $990.00 | $1,250.00 | $250.00 | $1,250.00 | $1,250.00 | $1,600.00 |
| 123 | RPM (621E00100) | EACH | 895 | $36.00 | $36.00 | $35.00 | $36.00 | $36.00 | $36.00 |
| 124 | Raised pavement marker removed (621E54000) | EACH | 485 | $28.00 | $31.00 | $31.00 | $31.00 | $6.00 | $31.00 |
| 125 | Barrier reflector, type 2, (1WAY) (626E00110) | EACH | 259 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 126 | Barrier reflector, type 2, (bidirectional) (626E00110) | EACH | 39 | $10.50 | $10.50 | $10.50 | $10.50 | $10.50 | $10.00 |
| 127 | Ground mounted support, no. 2 post (630E02100) | FT | 156 | $8.30 | $8.30 | $8.30 | $8.30 | $8.30 | $9.50 |
| 128 | Ground mounted support, no. 3 post (630E03100) | FT | 867 | $10.20 | $10.20 | $10.20 | $10.20 | $10.20 | $10.00 |
| 129 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 88 | $14.20 | $14.20 | $14.20 | $14.20 | $14.20 | $15.00 |
| 130 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 143.70 | $22.60 | $22.60 | $22.60 | $22.60 | $22.60 | $25.00 |
| 131 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 71.50 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 | $25.00 |
| 132 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 366.70 | $27.60 | $27.60 | $27.60 | $27.60 | $27.60 | $30.00 |
| 133 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 235.60 | $56.00 | $56.00 | $56.00 | $56.00 | $56.00 | $65.00 |
| 134 | Sign post reflector (630E08600) | EACH | 17 | $21.00 | $21.00 | $21.00 | $21.00 | $21.00 | $25.00 |
| 135 | Breakaway structural beam connection (630E09000) | EACH | 34 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $740.00 |
| 136 | Sign, flat sheet (630E80100) | SF | 553.50 | $13.60 | $13.60 | $13.60 | $13.60 | $13.60 | $15.00 |
| 137 | Sign, ground mounted extrusheet (630E80200) | SF | 1,650 | $19.50 | $19.50 | $19.50 | $19.50 | $19.50 | $20.00 |
| 138 | Ground mounted structural beam support foundation (630E84500) | EACH | 42 | $1,480.00 | $1,480.00 | $1,480.00 | $1,480.00 | $1,480.00 | $1,700.00 |
| 139 | Removal of ground mounted sign and disposal (630E84900) | EACH | 30 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $15.00 |
| 140 | Removal of ground mounted sign and storage (630E85000) | EACH | 70 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $25.00 |
| 141 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 10 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 | $130.00 |
| 142 | Removal of ground mounted post support and storage (630E86006) | EACH | 116 | $55.00 | $55.00 | $55.00 | $55.00 | $55.00 | $65.00 |
| 143 | Removal of ground mounted structural beam support (630E86102) | EACH | 24 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $290.00 |
| 144 | Stop line (644E00500) | FT | 111 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 | $9.50 |
| 145 | Transverse/diagonal line (644E00700) | FT | 777 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 | $9.50 |
| 146 | Island marking (644E00900) | SF | 904 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 | $3.00 |
| 147 | Lane arrow (644E01300) | EACH | 12 | $105.00 | $105.00 | $105.00 | $105.00 | $105.00 | $120.00 |
| 148 | Edge line, 6", type A4 (645E00118) | MI | 0.22 | $58,350 | $58,350 | $58,350 | $58,350 | $58,350 | $67,000 |
| 149 | Lane line, 6", type A4 (645E00220) | MI | 0.12 | $30,225 | $30,225 | $30,225 | $30,225 | $30,225 | $35,000 |
| 150 | Removal of pavement marking (646E50100) | FT | 3,267 | $4.22 | $4.72 | $4.72 | $4.70 | $5.00 | $5.50 |
| 151 | Removal of pavement marking (646E50300) | MI | 10.58 | $2,003.23 | $5,700.00 | $5,700.00 | $5,700.00 | $5,700.00 | $6,500.00 |
| 152 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 24.84 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,150.00 | $5,900.00 |
| 153 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 11.82 | $2,390.00 | $2,390.00 | $2,390.00 | $2,390.00 | $2,390.00 | $2,700.00 |
| 154 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 6,553 | $2.75 | $2.75 | $2.75 | $2.75 | $2.75 | $3.00 |
| 155 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 1,378 | $1.10 | $1.40 | $1.10 | $1.10 | $1.10 | $1.50 |
| 156 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 36.66 | $2,617.00 | $2,617.00 | $2,617.00 | $2,617.00 | $2,617.00 | $3,000.00 |
| 157 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 1,378 | $1.35 | $1.35 | $1.35 | $1.35 | $1.35 | $1.50 |
| 158 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 6,553 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.50 |
| 159 | Traffic compacted surface, type A (410E10000) | CY | 100 | $216.00 | $151.00 | $116.00 | $117.75 | $200.00 | $140.00 |
| 160 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 175 | $120.00 | $112.00 | $100.00 | $93.06 | $70.00 | $110.00 |
| 161 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 13 | $8,920.00 | $2,200.00 | $2,575.00 | $5,000.00 | $2,500.00 | $3,500.00 |
| 162 | Detour signing (614E12420) | LS | 1 | $6,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $4,000.00 |
| 163 | Detour signing (614E12420) | LS | 1 | $5,400.00 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 | $3,400.00 |
| 164 | Work zone marking sign (614E12460) | EACH | 26 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $95.00 |
| 165 | Replacement drum (614E12600) | EACH | 200 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $90.00 |
| 166 | Work zone crossover lighting system (614E12756) | EACH | 1 | $40,000 | $48,750 | $72,500 | $48,750 | $48,750 | $62,000 |
| 167 | Asphalt concrete for maintaining traffic (614E13000) | CY | 150 | $250.00 | $250.00 | $297.50 | $135.00 | $400.00 | $350.00 |
| 168 | Barrier reflector, type 1, (1WAY) (614E13310) | EACH | 165 | $18.00 | $18.00 | $11.00 | $18.00 | $18.00 | $20.00 |
| 169 | Barrier reflector, type 1, (bidirectional) (614E13310) | EACH | 211 | $20.25 | $20.25 | $14.25 | $20.25 | $20.25 | $25.00 |
| 170 | Object marker, one way (614E13350) | EACH | 165 | $22.50 | $22.50 | $15.25 | $22.50 | $22.50 | $25.00 |
| 171 | Object marker, two way (614E13360) | EACH | 211 | $26.50 | $26.50 | $18.75 | $26.50 | $26.50 | $30.00 |
| 172 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,700.00 |
| 173 | Work zone center line, class III, 642 paint (614E21550) | MI | 4.10 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $1,100.00 |
| 174 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 28.61 | $825.00 | $825.00 | $825.00 | $825.00 | $825.00 | $940.00 |
| 175 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 4,514 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 | $0.70 |
| 176 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 3,134 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 177 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 2,058 | $4.50 | $4.50 | $4.50 | $4.50 | $4.50 | $5.00 |
| 178 | Work zone stop line, class III, 642 paint (614E26610) | FT | 48 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 | $15.00 |
| 179 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 24 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 | $180.00 |
| 180 | Work zone word on pavement, 96", class III, 642 paint (614E31670) | EACH | 8 | $270.00 | $270.00 | $270.00 | $270.00 | $270.00 | $310.00 |
| 181 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $10,000 | $32,000 | $80,100 | $17,315 | $150,000 | $120,000 |
| 182 | Pavement for maintaining traffic, class A (615E20000) | SY | 2,261 | $51.00 | $83.00 | $65.00 | $86.67 | $85.00 | $65.00 |
| 183 | Portable barrier, unanchored (622E41100) | FT | 9,168 | $21.00 | $33.00 | $21.50 | $27.72 | $75.00 | $22.00 |
| 184 | Removal of pavement marking (642E30000) | FT | 1,004 | $4.22 | $4.72 | $4.72 | $4.70 | $5.00 | $5.50 |
| 185 | Removal of pavement marking (642E30020) | EACH | 12 | $48.03 | $52.00 | $52.00 | $52.00 | $52.00 | $60.00 |
| 186 | Removal of pavement marking (642E30030) | MI | 4.02 | $2,003.23 | $3,300.00 | $3,300.00 | $3,300.00 | $3,300.00 | $3,800.00 |
| 187 | Removal of longitudinal channelizing device (831E00500) | FT | 369 | $4.00 | $6.00 | $9.00 | $0.52 | $7.00 | $4.50 |
| 188 | Steel piles, misc.: W36X262 (507E00400) | FT | 2,323.40 | $380.00 | $307.00 | $340.00 | $315.00 | $400.00 | $570.00 |
| 189 | Drilled shafts, 48" diameter above bedrock, as per plan (524E94903) | FT | 1,493.90 | $260.00 | $165.00 | $139.50 | $410.00 | $300.00 | $300.00 |
| 190 | Drilled shafts, 48" diameter, into bedrock, as per plan (524E94905) | FT | 840 | $430.00 | $185.00 | $280.00 | $410.00 | $155.00 | $440.00 |
| 191 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $135,900 | $198,703 | $125,000 | $167,190 | $160,000 | $200,000 |
| 192 | CPM progress schedule (108E10000) | LS | 1 | $5,000.00 | $40,000 | $7,500.00 | $42,041 | $25,000 | $18,000 |
| 193 | Special - departments share facilitated partnering costs (111E10100) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 194 | Maintaining traffic (614E11000) | LS | 1 | $334,000 | $350,000 | $815,000 | $573,372 | $200,000 | $810,000 |
| 195 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $8,000.00 | $8,072.00 | $6,500.00 | $23,280 | $25,000 | $30,000 |
| 196 | Field office, type C (619E16020) | MNTH | 43 | $2,800.00 | $2,500.00 | $3,320.00 | $6,222.28 | $3,000.00 | $2,200.00 |
| 197 | Construction layout stakes and surveying (623E10000) | LS | 1 | $220,000 | $300,000 | $236,000 | $388,000 | $300,000 | $450,000 |
| 198 | Mobilization (624E10000) | LS | 1 | $1,560,000 | $1,750,000 | $1,628,000 | $741,365 | $1,925,000 | $466,000 |
| 200 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 23.64 | $675.00 | $675.00 | $675.00 | $713.85 | $675.00 | $770.00 |
| 201 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 11.82 | $525.00 | $525.00 | $525.00 | $555.22 | $525.00 | $600.00 |
| 202 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 49.68 | $1,245.00 | $1,245.00 | $1,245.00 | $1,316.66 | $1,245.00 | $1,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way