ODOT contract 250259 bid tabulation
PER-TR 1180-00.605 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on May 8, 2025, PER. 5 bids received; low bid $655,173 by Axis Civil Construction LLC, -18% against the engineer's estimate of $800,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 61
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Axis Civil Construction LLC | $655,173 | Low | -18% |
| 2 | Shelly & Sands Inc | $760,535 | +16% | -5.0% |
| 3 | George J Igel & Co Inc | $774,566 | +18% | -3.0% |
| 4 | Complete General Construction Company | $850,698 | +30% | +6.0% |
| 5 | R C Construction Company and Son Inc | $918,561 | +40% | +15% |
Engineer's estimate: $800,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Axis Civil Construction LLC | 2. Shelly & Sands Inc | 3. George J Igel & Co Inc | 4. Complete General Construction Company | 5. R C Construction Company and Son Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,000 | $14,003 | $15,000 | $38,000 | $10,000 |
| 2 | Excavation (203E10000) | CY | 1,382 | $28.00 | $29.00 | $28.00 | $30.00 | $35.00 |
| 3 | Embankment (203E20000) | CY | 1,382 | $28.00 | $40.00 | $32.00 | $40.00 | $35.00 |
| 4 | Subgrade compaction (204E10000) | SY | 1,612 | $3.00 | $4.30 | $10.00 | $5.00 | $2.00 |
| 5 | Excavation of subgrade, as per plan (204E13001) | CY | 155 | $25.00 | $37.00 | $12.75 | $20.00 | $25.00 |
| 6 | Granular material, type C (204E30020) | CY | 155 | $100.00 | $85.00 | $60.00 | $35.00 | $125.00 |
| 7 | Proof rolling (204E45000) | HR | 4 | $250.00 | $216.00 | $126.00 | $347.64 | $200.00 |
| 8 | Guardrail, type 5 (606E13000) | FT | 162.50 | $21.50 | $21.50 | $21.50 | $24.80 | $75.00 |
| 9 | Flared end section (606E20000) | EACH | 4 | $50.00 | $50.00 | $50.00 | $95.00 | $300.00 |
| 10 | Anchor assembly, type T (606E26500) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $1,260.00 | $1,900.00 |
| 11 | Right-of-way monument, type B (623E40520) | EACH | 6 | $150.00 | $1,000.00 | $1,000.00 | $411.53 | $1,200.00 |
| 12 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $150.00 | $150.00 | $150.00 | $50.00 |
| 13 | Topsoil (659E00300) | CY | 185 | $55.00 | $50.00 | $15.00 | $35.00 | $75.00 |
| 14 | Seeding and mulching, class 1 (659E00500) | SY | 1,945 | $2.00 | $2.00 | $6.50 | $2.00 | $10.00 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.20 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,900.00 |
| 16 | Lime (659E31000) | ACRE | 0.45 | $150.00 | $150.00 | $150.00 | $150.00 | $1,500.00 |
| 17 | Water (659E35000) | MGAL | 0.15 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $6,500.00 |
| 19 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $5,150.00 | $3,600.00 | $5,150.00 | $5,400.00 | $12,500 |
| 20 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,500.00 | $1,550.00 | $1,505.00 | $7,500.00 | $5,500.00 |
| 21 | Erosion control (832E30000) | EACH | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Aggregate drains (605E31100) | FT | 40 | $25.00 | $23.00 | $40.00 | $13.00 | $100.00 |
| 23 | 15" conduit, type D (611E06400) | FT | 20 | $85.00 | $73.00 | $150.00 | $200.00 | $150.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 107 | $320.00 | $276.00 | $253.00 | $253.00 | $325.00 |
| 25 | Aggregate base (304E20000) | CY | 312 | $110.00 | $85.00 | $108.00 | $95.00 | $175.00 |
| 26 | Non-tracking tack coat (407E20000) | GAL | 74 | $6.00 | $3.05 | $3.90 | $3.90 | $20.00 |
| 27 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 52 | $380.00 | $416.00 | $393.00 | $393.00 | $500.00 |
| 28 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 4 | $650.00 | $217.00 | $400.00 | $400.00 | $1,500.00 |
| 29 | Barrier reflector, type 3, bidirectional (626E00112) | EACH | 8 | $12.00 | $12.00 | $12.00 | $12.50 | $25.00 |
| 30 | Ground mounted support, no. 3 post (630E03100) | FT | 46 | $25.00 | $25.00 | $25.00 | $22.50 | $45.00 |
| 31 | Sign, flat sheet (630E80100) | SF | 12 | $32.00 | $32.00 | $32.00 | $25.00 | $125.00 |
| 32 | Edge line, 4", type 1 (642E00100) | MI | 0.30 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 | $14,500 |
| 33 | Center line, type 1 (642E00300) | MI | 0.20 | $4,250.00 | $4,250.00 | $4,250.00 | $4,250.00 | $18,500 |
| 34 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $18,000 | $20,000 | $57,500 | $35,000 | $20,000 |
| 35 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $22,000 | $76,000 | $40,000 | $40,000 | $15,000 |
| 36 | Unclassified excavation (503E21300) | LS | 1 | $12,000 | $6,200.00 | $13,500 | $10,000 | $15,000 |
| 37 | Pile driving equipment mobilization (505E11100) | LS | 1 | $30,140 | $24,000 | $8,500.00 | $15,000 | $35,000 |
| 38 | Steel piles HP10X42, furnished (507E00100) | FT | 420 | $36.00 | $28.00 | $40.00 | $40.00 | $60.00 |
| 39 | Steel piles HP10X42, driven (507E00150) | FT | 360 | $36.00 | $50.00 | $32.00 | $35.00 | $45.00 |
| 40 | Epoxy coated steel reinforcement (509E10000) | LB | 10,814 | $2.50 | $2.23 | $2.25 | $2.08 | $3.50 |
| 41 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 12 | $55.00 | $29.00 | $70.00 | $250.00 | $150.00 |
| 42 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 22 | $1,350.00 | $2,700.00 | $2,100.00 | $2,500.00 | $1,800.00 |
| 43 | Class QC1 concrete, abutment including footing (511E43510) | CY | 64 | $750.00 | $1,200.00 | $1,000.00 | $1,700.00 | $750.00 |
| 44 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 40 | $65.00 | $65.00 | $65.00 | $65.00 | $50.00 |
| 45 | Prestressed concrete composite box beam bridge members, level 1, CB12-48 (515E12010) | EACH | 6 | $12,000 | $11,157 | $18,000 | $13,750 | $15,000 |
| 46 | 2" preformed expansion joint filler, as per plan (516E13901) | SF | 23 | $50.00 | $55.00 | $60.00 | $100.00 | $100.00 |
| 47 | Semi-integral abutment expansion joint seal (516E14020) | FT | 49 | $32.00 | $46.00 | $46.00 | $46.00 | $200.00 |
| 48 | Nylon reinforced neoprene sheeting (516E25000) | SF | 36 | $38.00 | $6.00 | $15.00 | $175.00 | $150.00 |
| 49 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 12 | $95.00 | $21.00 | $65.00 | $95.50 | $200.00 |
| 50 | Elastomeric bearing with internal laminates and load plate (516E44000) | EACH | 24 | $1,060.00 | $492.00 | $600.00 | $875.00 | $1,100.00 |
| 51 | Railing (deep beam rail with steel tubular backup and type 2 steel posts) (517E72306) | FT | 75 | $140.00 | $140.00 | $140.00 | $162.00 | $210.00 |
| 52 | Deep beam bridge retrofit railing (517E75600) | FT | 75 | $115.00 | $115.00 | $115.00 | $112.00 | $500.00 |
| 53 | Prefabricated geocomposite drain (518E20000) | SY | 37 | $35.00 | $18.00 | $35.00 | $175.00 | $100.00 |
| 54 | Special - steel drip strip (518E22300) | FT | 72 | $22.00 | $16.00 | $20.00 | $16.00 | $40.00 |
| 55 | 6" perforated corrugated plastic pipe (518E40000) | FT | 85 | $12.00 | $5.50 | $18.00 | $15.00 | $25.00 |
| 56 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 40 | $16.00 | $5.50 | $25.00 | $20.00 | $25.00 |
| 57 | Low strength mortar backfill (613E41200) | CY | 56 | $210.00 | $230.00 | $310.00 | $500.00 | $175.00 |
| 58 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,500.00 | $4,400.00 | $4,000.00 | $6,500.00 | $22,000 |
| 59 | Maintaining traffic (614E11000) | LS | 1 | $7,500.00 | $10,000 | $15,000 | $10,000 | $35,000 |
| 60 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,500.00 | $12,000 | $12,000 | $15,000 | $15,000 |
| 61 | Mobilization (624E10000) | LS | 1 | $25,000 | $38,064 | $29,000 | $42,500 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.