ODOT contract 250376 bid tabulation
CLI-SR 134-02.25 (BRIDGE REPAIR). Let by Ohio DOT on August 28, 2025, CLI. 4 bids received; low bid $1,592,885 by Eagle Bridge Co, -17% against the engineer's estimate of $1,930,000.
- Owner
- Ohio DOT
- Letting
- 28 AUG 2025
- Pay items
- 66
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eagle Bridge Co | $1,592,885 | Low | -17% |
| 2 | Double Z Construction Company | $1,798,565 | +13% | -7.0% |
| 3 | Complete General Construction Company | $1,834,888 | +15% | -5.0% |
| 4 | KT Holden Construction LLC | $2,077,664 | +30% | +8.0% |
Engineer's estimate: $1,930,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Bridge Co | 2. Double Z Construction Company | 3. Complete General Construction Company | 4. KT Holden Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,500.00 | $15,000 | $5,000.00 | $12,000 |
| 2 | Pavement removed (202E23000) | SY | 423 | $20.00 | $17.00 | $20.00 | $12.00 |
| 3 | Wearing course removed (202E23500) | SY | 730 | $12.00 | $17.00 | $10.00 | $6.00 |
| 4 | Guardrail removed (202E38000) | FT | 475 | $3.00 | $5.00 | $2.00 | $9.00 |
| 5 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 4 | $300.00 | $750.00 | $355.00 | $500.00 |
| 6 | Excavation (203E10000) | CY | 658 | $20.00 | $30.00 | $10.00 | $35.00 |
| 7 | Embankment (203E20000) | CY | 796 | $20.00 | $20.00 | $20.00 | $20.00 |
| 8 | Subgrade compaction (204E10000) | SY | 813 | $5.00 | $10.00 | $7.00 | $2.60 |
| 9 | Excavation of subgrade (204E13000) | CY | 271 | $50.00 | $40.00 | $25.00 | $39.00 |
| 10 | Granular material, type C (204E30020) | CY | 271 | $85.00 | $65.00 | $75.00 | $86.00 |
| 11 | Geotextile fabric (204E50000) | SY | 813 | $1.75 | $1.25 | $5.00 | $2.00 |
| 12 | Reshaping under guardrail (209E15050) | MI | 0.19 | $3,000.00 | $5,000.00 | $2,800.00 | $4,000.00 |
| 13 | Guardrail, type MGS (606E15050) | FT | 237.50 | $21.00 | $21.00 | $21.60 | $22.00 |
| 14 | Anchor assembly, MGS type E (NCHRP 350 or MASH 201 (606E26150) | EACH | 4 | $2,500.00 | $2,500.00 | $2,520.00 | $2,600.00 |
| 15 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,350.00 | $2,350.00 | $2,475.00 | $2,750.00 |
| 16 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $5,000.00 | $17,000 | $15,000 | $8,658.00 |
| 17 | Topsoil (659E00300) | CY | 188 | $15.00 | $75.00 | $25.00 | $55.00 |
| 18 | Seeding and mulching (659E10000) | SY | 1,690 | $3.00 | $8.00 | $2.25 | $1.45 |
| 19 | Repair seeding and mulching (659E14000) | SY | 85 | $3.00 | $2.25 | $2.25 | $2.20 |
| 20 | Commercial fertilizer (659E20000) | TON | 0.23 | $1,500.00 | $1,250.00 | $1,250.00 | $1,400.00 |
| 21 | Lime (659E31000) | ACRE | 0.35 | $5.00 | $150.00 | $150.00 | $450.00 |
| 22 | Water (659E35000) | MGAL | 9.10 | $20.00 | $1.00 | $1.00 | $3.50 |
| 23 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | Pavement planing, asphalt concrete (D=1.50") (254E01000) | SY | 410 | $9.00 | $9.00 | $20.00 | $10.00 |
| 25 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 181 | $300.00 | $300.00 | $245.00 | $245.00 |
| 26 | Aggregate base (304E20000) | CY | 446 | $65.00 | $76.00 | $90.00 | $80.00 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 164 | $1.00 | $1.00 | $5.00 | $5.00 |
| 28 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 59 | $350.00 | $350.00 | $655.00 | $655.00 |
| 29 | RPM (621E00100) | EACH | 6 | $289.00 | $289.00 | $289.00 | $540.00 |
| 30 | Raised pavement marker removed (621E54000) | EACH | 6 | $20.00 | $15.00 | $75.00 | $30.00 |
| 31 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 24 | $13.00 | $13.00 | $13.00 | $12.00 |
| 32 | Edge line, 6" (644E00104) | MI | 0.10 | $16,500 | $16,500 | $16,500 | $17,825 |
| 33 | Center line (644E00300) | MI | 0.05 | $22,000 | $22,000 | $22,000 | $22,580 |
| 34 | Edge line, 6" (646E10010) | MI | 0.08 | $32,410 | $32,410 | $32,410 | $22,570 |
| 35 | Center line (646E10200) | MI | 0.04 | $43,210 | $43,210 | $43,210 | $30,115 |
| 46 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $118,000 | $165,000 | $175,000 | $296,530 |
| 47 | Approach slab removed (202E22900) | SY | 223 | $45.00 | $50.00 | $95.00 | $90.00 |
| 48 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $100,000 | $35,000 | $150,000 | $80,000 |
| 49 | Unclassified excavation (503E21300) | LS | 1 | $10,000 | $25,000 | $20,000 | $17,000 |
| 50 | Special - pile encasement (507E71200) | FT | 52.50 | $250.00 | $190.00 | $250.00 | $300.00 |
| 51 | Galvanized steel reinforcement (509E26000) | LB | 96,261 | $1.75 | $1.60 | $1.75 | $2.00 |
| 52 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 144 | $30.00 | $30.00 | $25.00 | $18.00 |
| 53 | Class QC2 concrete with QC/QA, superstructure (511E33312) | CY | 321 | $1,350.00 | $1,850.00 | $1,480.00 | $1,775.00 |
| 54 | Class QC1 concrete with QC/QA, abutment (511E45712) | CY | 27 | $1,350.00 | $1,850.00 | $1,325.00 | $1,500.00 |
| 56 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 150 | $40.00 | $40.00 | $40.00 | $40.00 |
| 57 | Type 2 waterproofing (512E33000) | SY | 2 | $15.00 | $100.00 | $550.00 | $300.00 |
| 58 | Surface preparation of existing structural steel (514E00050) | SF | 508 | $35.00 | $108.16 | $106.00 | $100.00 |
| 59 | Field painting of existing structural steel, prime coat (514E00056) | SF | 508 | $20.00 | $29.71 | $29.12 | $50.00 |
| 60 | 1/2" preformed expansion joint filler (516E13200) | SF | 15 | $9.00 | $16.00 | $13.00 | $4.00 |
| 61 | 1" preformed expansion joint filler (516E13600) | SF | 87 | $10.00 | $17.00 | $13.00 | $6.00 |
| 62 | Integral abutment expansion joint seal (516E14014) | FT | 80 | $40.00 | $35.00 | $52.00 | $52.00 |
| 63 | Railing (three steel tube bridge railing) (517E70100) | FT | 241.56 | $463.75 | $463.75 | $485.00 | $485.00 |
| 64 | Porous backfill with geotextile fabric (518E21200) | CY | 58 | $100.00 | $130.00 | $95.00 | $130.00 |
| 65 | Special - steel drip strip (518E22300) | FT | 281 | $15.00 | $20.00 | $15.50 | $15.50 |
| 66 | 6" perforated corrugated plastic pipe (518E40000) | FT | 96 | $15.00 | $15.00 | $15.00 | $9.00 |
| 67 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 100 | $15.00 | $20.00 | $20.00 | $30.00 |
| 68 | Reinforced concrete approach slabs (T=15"), as per plan (526E25001) | SY | 222 | $450.00 | $420.00 | $425.00 | $460.00 |
| 69 | Type A installation (526E90010) | FT | 80 | $275.00 | $225.00 | $250.00 | $245.00 |
| 70 | Polymer modified asphalt expansion joint system (846E00110) | CF | 22.30 | $950.00 | $947.96 | $947.96 | $700.00 |
| 71 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $22,500 | $12,000 | $11,000 | $33,690 |
| 72 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $3,000.00 | $5,000.00 | $20,000 |
| 73 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,500 | $18,000 | $15,000 | $15,500 |
| 74 | Mobilization (624E10000) | LS | 1 | $75,000 | $40,000 | $92,000 | $100,000 |
| 100 | Special - asbestos abatementwork involving asbesto (690E71000) | LS | 1 | $150.00 | $100.00 | $2,000.00 | $1,500.00 |
| 101 | Law enforcement officer with patrol car for assistance, as per plan (614E11111) | HR | 80 | $70.00 | $60.00 | $95.00 | $80.00 |
| 102 | Detour signing (614E12420) | LS | 1 | $10,000 | $15,000 | $9,000.00 | $11,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 28, 2025. Compiled by Mirage Metrics.