ODOT contract 250189 bid tabulation
BUT-SR 126-02.92 (SLIDE REPAIR). Let by Ohio DOT on April 10, 2025, BUT. 5 bids received; low bid $5,163,250 by Beaty Construction Inc, +35% against the engineer's estimate of $3,811,000.
- Owner
- Ohio DOT
- Letting
- 10 APR 2025
- Pay items
- 60
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Beaty Construction Inc | $5,163,250 | Low | +35% |
| 2 | KT Holden Construction LLC | $5,397,265 | +5.0% | +42% |
| 3 | John R Jurgensen Company | $5,464,902 | +6.0% | +43% |
| 4 | Complete General Construction Company | $5,534,474 | +7.0% | +45% |
| 5 | Sunesis Construction Co | $7,180,688 | +39% | +88% |
Engineer's estimate: $3,811,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beaty Construction Inc | 2. KT Holden Construction LLC | 3. John R Jurgensen Company | 4. Complete General Construction Company | 5. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $50,000 | $22,200 | $25,977 | $40,000 | $19,800 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $1,250.00 | $490.00 | $1,077.69 | $600.00 | $304.01 |
| 3 | Concrete slope protection removed (202E32800) | SY | 0.60 | $1,700.00 | $305.00 | $903.08 | $450.00 | $286.87 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 40 | $175.00 | $47.00 | $81.60 | $50.00 | $101.20 |
| 5 | Guardrail removed (202E38000) | FT | 479 | $2.40 | $6.50 | $2.40 | $2.40 | $7.22 |
| 6 | Catch basin removed (202E58100) | EACH | 1 | $1,100.00 | $700.00 | $553.87 | $550.00 | $526.03 |
| 7 | Excavation (203E10000) | CY | 231 | $45.00 | $36.00 | $40.11 | $32.00 | $43.89 |
| 8 | Embankment (203E20000) | CY | 140 | $50.00 | $17.00 | $30.15 | $40.00 | $30.96 |
| 9 | Subgrade compaction (204E10000) | SY | 871 | $6.00 | $2.60 | $3.02 | $5.00 | $5.29 |
| 10 | Proof rolling (204E45000) | HR | 0.50 | $1,325.00 | $400.00 | $233.24 | $130.00 | $422.68 |
| 11 | Guardrail, type MGS half post spacing (606E15150) | FT | 587.50 | $27.60 | $27.60 | $27.60 | $27.60 | $34.50 |
| 12 | Anchor assembly, MGS type E, (MASH 2016) (606E26150) | EACH | 1 | $2,740.00 | $2,740.00 | $2,740.00 | $2,740.00 | $2,550.00 |
| 13 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,475.00 | $1,475.00 | $1,475.00 | $1,475.00 | $1,300.00 |
| 14 | Special - mailbox removed and reset (690E50350) | EACH | 1 | $260.00 | $590.00 | $260.00 | $260.00 | $199.46 |
| 15 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $65,000 | $27,295 | $4,850.00 | $5,000.00 | $10,136 |
| 16 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 14.10 | $350.00 | $180.00 | $173.55 | $250.00 | $210.78 |
| 17 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 60 | $200.00 | $200.00 | $286.74 | $125.00 | $203.44 |
| 18 | Seeding and mulching (659E10000) | SY | 714 | $3.10 | $5.00 | $3.10 | $5.95 | $4.35 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,500.00 | $1,500.00 | $1,500.00 | $670.00 | $1,400.00 |
| 20 | Lime (659E31000) | ACRE | 0.15 | $200.00 | $200.00 | $200.00 | $38.00 | $200.00 |
| 21 | Water (659E35000) | MGAL | 4 | $10.00 | $1.00 | $10.00 | $1.00 | $1.39 |
| 22 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | 6" unclassified pipe underdrains (605E13300) | FT | 480 | $50.00 | $13.50 | $33.01 | $22.00 | $22.38 |
| 24 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 20 | $55.00 | $50.00 | $73.06 | $50.00 | $100.47 |
| 25 | 24" conduit, type B (611E10400) | FT | 44 | $350.00 | $185.00 | $270.06 | $125.00 | $212.45 |
| 26 | Catch basin, no. 3 (611E98150) | EACH | 1 | $10,500 | $6,500.00 | $5,899.14 | $6,300.00 | $5,924.41 |
| 27 | Catch basin, no. 4 (611E98230) | EACH | 1 | $8,400.00 | $5,500.00 | $6,816.20 | $6,600.00 | $6,325.54 |
| 28 | Pavement planing, asphalt concrete, 1.25" (254E01000) | SY | 860 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 29 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 194 | $265.00 | $265.00 | $265.00 | $265.00 | $265.00 |
| 30 | Aggregate base (304E20000) | CY | 146 | $180.00 | $90.00 | $98.82 | $130.00 | $133.38 |
| 31 | Non-tracking tack coat (407E20000) | GAL | 192 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 32 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 60 | $445.00 | $445.00 | $445.00 | $445.00 | $445.00 |
| 33 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 84 | $385.00 | $385.00 | $385.00 | $385.00 | $385.00 |
| 34 | Combination curb and gutter, type 2 (609E12000) | FT | 500 | $48.00 | $33.00 | $42.39 | $65.00 | $44.65 |
| 35 | RPM (621E00100) | EACH | 8 | $200.00 | $200.00 | $345.30 | $200.00 | $200.00 |
| 36 | Raised pavement marker removed (621E54000) | EACH | 8 | $25.00 | $21.00 | $30.15 | $26.00 | $18.27 |
| 37 | Barrier reflector, type 2, (bidirectional) (626E00110) | EACH | 8 | $11.30 | $11.30 | $11.30 | $11.30 | $15.00 |
| 38 | Edge line, 6", type 1 (642E00104) | MI | 0.24 | $4,860.00 | $4,860.00 | $4,685.00 | $4,860.00 | $4,860.00 |
| 39 | Center line, type 1 (642E00300) | MI | 0.12 | $7,290.00 | $7,290.00 | $6,245.00 | $7,290.00 | $7,290.00 |
| 40 | Detour signing (614E12420) | LS | 1 | $4,740.00 | $8,100.00 | $5,940.00 | $4,800.00 | $7,020.55 |
| 41 | Water (616E10000) | MGAL | 5 | $25.00 | $41.47 | $167.10 | $155.00 | $17.74 |
| 43 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $991,376 | $1,870,785 | $1,306,480 | $1,930,000 | $3,099,872 |
| 45 | Unclassified excavation, including rock and/or shale, as per plan (503E21331) | LS | 1 | $750,000 | $571,465 | $979,337 | $500,000 | $911,759 |
| 46 | Steel sheet piling left in place, PZ 40 (504E11100) | SF | 12,540 | $60.00 | $90.00 | $62.79 | $80.00 | $85.50 |
| 47 | Epoxy coated steel reinforcement (509E10000) | LB | 121,830 | $1.60 | $1.20 | $1.16 | $1.30 | $1.45 |
| 48 | Class QC1 concrete with QC/QA, retaining/wingwall not including footing (511E46012) | CY | 732 | $850.00 | $850.00 | $1,284.40 | $1,000.00 | $1,111.49 |
| 49 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 755 | $550.00 | $360.00 | $552.67 | $500.00 | $559.11 |
| 50 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 957 | $40.00 | $24.50 | $24.50 | $24.50 | $24.50 |
| 51 | Type 2 waterproofing (512E33000) | SY | 81 | $50.00 | $22.00 | $30.50 | $28.00 | $30.50 |
| 52 | 1" preformed expansion joint filler (516E13600) | SF | 225 | $10.00 | $7.15 | $16.36 | $14.00 | $5.01 |
| 53 | Prefabricated geocomposite drain (518E20000) | SY | 658 | $25.00 | $20.55 | $34.41 | $16.00 | $16.51 |
| 54 | Porous backfill with geotextile fabric (518E21200) | CY | 66 | $85.00 | $133.00 | $103.90 | $120.00 | $146.36 |
| 55 | 6" perforated corrugated plastic pipe (518E40000) | FT | 444 | $30.00 | $6.85 | $7.31 | $10.00 | $4.71 |
| 56 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 210 | $49.00 | $24.00 | $49.98 | $26.00 | $13.96 |
| 58 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $24,000 | $81,072 | $34,726 | $30,000 | $32,854 |
| 59 | Maintaining traffic (614E11000) | LS | 1 | $55,000 | $3,680.00 | $64,128 | $8,000.00 | $5,740.85 |
| 60 | Construction layout stakes and surveying (623E10000) | LS | 1 | $55,000 | $15,500 | $20,153 | $40,000 | $6,100.00 |
| 61 | Mobilization (624E10000) | LS | 1 | $258,150 | $264,800 | $270,000 | $275,000 | $235,134 |
| 100 | Pavement removed (202E23000) | SY | 783 | $25.00 | $22.50 | $29.28 | $24.00 | $26.18 |
| 101 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $504,353 | $46,100 | $100,035 | $87,985 | $21,467 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.