ODOT contract 250136 bid tabulation
WAR-US 42-20.23 (INTERSECTION). Let by Ohio DOT on February 27, 2025, WAR. 5 bids received; low bid $1,290,000 by Barrett Paving Materials Inc, +14% against the engineer's estimate of $1,128,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 136
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $1,290,000 | Low | +14% |
| 2 | KT Holden Construction LLC | $1,303,469 | +1.0% | +16% |
| 3 | John R Jurgensen Company | $1,352,658 | +5.0% | +20% |
| 4 | Complete General Construction Company | $1,424,794 | +10% | +26% |
| 5 | Sunesis Construction Co | $1,476,404 | +14% | +31% |
Engineer's estimate: $1,128,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. KT Holden Construction LLC | 3. John R Jurgensen Company | 4. Complete General Construction Company | 5. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 | $7,500.00 | $2,750.75 | $5,000.00 | $24,685 |
| 2 | Pavement removed (202E23000) | SY | 765 | $25.00 | $33.50 | $48.18 | $35.00 | $76.54 |
| 3 | Walk removed (202E30000) | SF | 1,185 | $6.00 | $3.30 | $5.22 | $7.00 | $4.54 |
| 4 | Concrete median removed (202E30600) | SY | 74 | $90.00 | $32.10 | $34.48 | $52.00 | $29.55 |
| 5 | Curb removed (202E32000) | FT | 974 | $9.00 | $9.10 | $5.93 | $10.00 | $8.82 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 60 | $30.00 | $32.55 | $77.14 | $95.00 | $35.15 |
| 7 | Catch basin removed (202E58100) | EACH | 5 | $240.00 | $678.00 | $670.14 | $450.00 | $594.98 |
| 8 | Removal misc.:decorative plaque (202E98100) | EACH | 1 | $400.00 | $344.00 | $465.44 | $1,800.00 | $159.62 |
| 9 | Excavation (203E10000) | CY | 567 | $42.00 | $47.60 | $75.38 | $35.00 | $94.89 |
| 10 | Embankment (203E20000) | CY | 131 | $42.00 | $43.10 | $61.07 | $25.00 | $46.31 |
| 11 | Subgrade compaction (204E10000) | SY | 1,506 | $4.00 | $10.40 | $3.65 | $4.00 | $7.86 |
| 12 | Excavation of subgrade (204E13000) | CY | 465 | $45.00 | $54.50 | $83.89 | $42.00 | $65.08 |
| 13 | Granular material, type C (204E30020) | CY | 465 | $70.00 | $71.50 | $101.59 | $46.00 | $122.24 |
| 14 | Proof rolling (204E45000) | HR | 0.90 | $1,500.00 | $406.00 | $278.13 | $386.00 | $435.26 |
| 15 | Geotextile fabric (204E50000) | SY | 1,393 | $5.00 | $1.10 | $3.98 | $2.50 | $4.13 |
| 16 | 4" concrete walk (608E10000) | SF | 1,140 | $7.00 | $11.50 | $8.71 | $15.00 | $18.38 |
| 17 | Curb ramp (608E52000) | SF | 332 | $20.00 | $29.00 | $25.13 | $35.00 | $37.38 |
| 18 | Soil analysis test (659E00100) | EACH | 2 | $135.00 | $150.00 | $135.00 | $135.00 | $75.00 |
| 19 | Topsoil (659E00300) | CY | 85 | $115.00 | $90.60 | $85.13 | $115.00 | $48.26 |
| 20 | Seeding and mulching (659E10000) | SY | 763 | $3.46 | $2.25 | $3.46 | $3.46 | $9.16 |
| 21 | Repair seeding and mulching (659E14000) | SY | 38 | $3.46 | $2.00 | $3.46 | $3.46 | $2.91 |
| 22 | Inter-seeding (659E15000) | SY | 38 | $1.00 | $2.00 | $1.00 | $1.00 | $2.91 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.17 | $1,000.00 | $1,400.00 | $1,000.00 | $1,000.00 | $2,033.82 |
| 24 | Lime (659E31000) | ACRE | 0.16 | $190.00 | $450.00 | $190.00 | $190.00 | $653.75 |
| 25 | Water (659E35000) | MGAL | 4 | $10.00 | $10.00 | $10.00 | $10.00 | $20.00 |
| 26 | Mowing (659E40000) | MSF | 2 | $200.00 | $15.00 | $200.00 | $200.00 | $21.79 |
| 27 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | Rock channel protection, type C with filter (601E32200) | CY | 1.10 | $300.00 | $1,085.00 | $2,691.61 | $578.25 | $713.55 |
| 29 | Concrete masonry (602E20000) | CY | 0.20 | $2,000.00 | $5,600.00 | $17,047 | $5,000.00 | $5,659.60 |
| 30 | 6" base pipe underdrains (605E14000) | FT | 1,502 | $16.00 | $15.05 | $38.92 | $25.00 | $21.03 |
| 31 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 132 | $35.00 | $37.50 | $54.23 | $34.00 | $53.25 |
| 32 | 12" conduit, type B (611E04400) | FT | 304 | $220.00 | $157.00 | $132.32 | $200.00 | $117.99 |
| 33 | 12" conduit, type C (611E04600) | FT | 10 | $450.00 | $136.30 | $213.34 | $195.00 | $424.92 |
| 34 | 15" conduit, type B (611E05900) | FT | 28 | $500.00 | $285.00 | $410.54 | $230.00 | $411.77 |
| 35 | 24" conduit, type B (611E10400) | FT | 16 | $560.00 | $315.50 | $615.48 | $350.00 | $397.00 |
| 36 | 24" conduit, type C (611E10600) | FT | 14 | $700.00 | $440.50 | $765.80 | $300.00 | $471.17 |
| 37 | Catch basin, no. 3 (611E98150) | EACH | 2 | $6,000.00 | $5,910.00 | $5,479.34 | $5,500.00 | $6,544.13 |
| 38 | Catch basin, no. 3A (611E98180) | EACH | 4 | $3,500.00 | $3,830.00 | $3,357.30 | $5,000.00 | $4,161.83 |
| 39 | Catch basin, no. 6 (611E98370) | EACH | 2 | $4,750.00 | $3,620.00 | $4,917.78 | $5,800.00 | $4,401.84 |
| 40 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,250.00 | $2,147.00 | $1,933.47 | $3,500.00 | $2,039.49 |
| 41 | Manhole, no. 3 (611E99574) | EACH | 3 | $7,000.00 | $7,620.00 | $8,708.24 | $5,500.00 | $5,332.89 |
| 42 | Trench drain, type A with standard grate (839E29000) | FT | 190 | $325.00 | $397.00 | $338.95 | $350.00 | $602.49 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 297 | $250.00 | $425.00 | $425.00 | $425.00 | $432.54 |
| 44 | Aggregate base (304E20000) | CY | 240 | $115.00 | $128.60 | $143.77 | $90.00 | $116.95 |
| 45 | Non-tracking tack coat (407E20000) | GAL | 198 | $3.75 | $5.00 | $5.00 | $5.00 | $5.00 |
| 46 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 100 | $535.00 | $605.00 | $605.00 | $605.00 | $605.00 |
| 47 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 113 | $104.00 | $124.00 | $115.24 | $140.00 | $104.00 |
| 48 | Curb, type 4-C (609E24510) | FT | 523 | $22.00 | $27.20 | $26.60 | $55.00 | $33.10 |
| 49 | Curb, type 6 (609E26000) | FT | 208 | $23.00 | $28.30 | $27.93 | $60.00 | $34.20 |
| 50 | Concrete median (609E72000) | SY | 138 | $63.00 | $85.00 | $71.11 | $115.00 | $63.00 |
| 51 | Fire hydrant extended and adjusted to grade (638E10300) | EACH | 1 | $7,500.00 | $15,100 | $9,861.56 | $1,500.00 | $15,447 |
| 52 | RPM (621E00100) | EACH | 29 | $120.00 | $120.00 | $120.00 | $103.00 | $120.00 |
| 53 | Raised pavement marker removed (621E54000) | EACH | 4 | $1.00 | $25.50 | $14.02 | $20.00 | $36.99 |
| 54 | Ground mounted support, no. 3 post (630E03100) | FT | 140 | $19.80 | $19.80 | $19.80 | $19.80 | $14.75 |
| 55 | Sign post reflector (630E08600) | EACH | 1 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 56 | Sign, flat sheet (630E80100) | SF | 54.50 | $20.00 | $20.00 | $20.00 | $20.00 | $22.50 |
| 57 | Removal of ground mounted sign and disposal (630E84900) | EACH | 21 | $15.00 | $15.00 | $15.00 | $15.00 | $25.00 |
| 58 | Removal of ground mounted post support and disposal (630E86002) | EACH | 11 | $20.00 | $20.00 | $20.00 | $20.00 | $75.00 |
| 59 | Removal of ground mounted pipe support and disposal (630E86272) | EACH | 1 | $60.00 | $60.00 | $60.00 | $60.00 | $75.00 |
| 60 | Edge line, 6" (644E00104) | MI | 0.12 | $14,000 | $14,000 | $14,000 | $4,500.00 | $14,000 |
| 61 | Center line (644E00300) | MI | 0.08 | $15,000 | $15,000 | $15,000 | $9,038.00 | $15,000 |
| 62 | Channelizing line, 12" (644E00404) | FT | 636 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 63 | Stop line (644E00500) | FT | 109 | $6.00 | $6.00 | $6.00 | $8.00 | $6.00 |
| 64 | Transverse/diagonal line (644E00700) | FT | 190 | $5.25 | $5.25 | $5.25 | $8.00 | $5.25 |
| 65 | Chevron marking (644E00720) | FT | 196 | $5.25 | $5.25 | $5.25 | $7.00 | $5.25 |
| 66 | Island marking (644E00900) | SF | 23 | $5.00 | $5.00 | $5.00 | $10.00 | $5.00 |
| 67 | Lane arrow (644E01300) | EACH | 6 | $150.00 | $150.00 | $150.00 | $130.00 | $150.00 |
| 68 | Removal of pavement marking (644E30000) | FT | 414 | $5.00 | $5.00 | $5.00 | $6.04 | $5.00 |
| 69 | Crosswalk line, 24", type B90 (647E20080) | FT | 200 | $14.00 | $14.00 | $14.00 | $19.78 | $14.00 |
| 70 | Connection, fused pull apart (625E00450) | EACH | 2 | $110.00 | $110.00 | $110.00 | $175.00 | $209.00 |
| 71 | Connection, unfused pull apart (625E00460) | EACH | 2 | $110.00 | $110.00 | $110.00 | $175.00 | $209.00 |
| 72 | Bracket arm, 10' (625E18000) | EACH | 2 | $850.00 | $850.00 | $850.00 | $1,500.00 | $819.00 |
| 73 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 1,062 | $2.50 | $2.50 | $2.50 | $3.00 | $2.75 |
| 74 | No. 10 AWG pole and bracket cable (625E23400) | FT | 240 | $1.50 | $1.50 | $1.50 | $2.50 | $2.15 |
| 75 | Conduit, 2", 725.051 (625E25408) | FT | 62 | $13.00 | $13.00 | $13.00 | $15.00 | $9.50 |
| 76 | Conduit, 3", 725.051 (625E25504) | FT | 161 | $16.50 | $16.50 | $16.50 | $16.00 | $14.95 |
| 77 | Conduit, 4", 725.051 (625E25604) | FT | 96 | $20.00 | $20.00 | $20.00 | $30.00 | $19.00 |
| 78 | Conduit, concrete encased, 2" (625E25802) | FT | 4 | $125.00 | $125.00 | $125.00 | $90.00 | $111.90 |
| 79 | Conduit, jacked or drilled, 725.052, 2" (625E25908) | FT | 268 | $36.00 | $36.00 | $36.00 | $40.00 | $38.40 |
| 80 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 268 | $41.00 | $41.00 | $41.00 | $70.00 | $46.90 |
| 81 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 2 | $525.00 | $525.00 | $525.00 | $1,125.00 | $553.00 |
| 82 | Trench (625E29000) | FT | 272 | $14.00 | $14.00 | $14.00 | $13.00 | $16.95 |
| 83 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,250.00 | $1,250.00 | $1,250.00 | $1,400.00 | $2,921.97 |
| 84 | Ground rod (625E32000) | EACH | 8 | $265.00 | $265.00 | $265.00 | $300.00 | $292.00 |
| 85 | Sign hanger assembly, mast arm (630E79100) | EACH | 6 | $450.00 | $450.00 | $450.00 | $450.00 | $559.00 |
| 86 | Sign support assembly, pole mounted (630E79500) | EACH | 6 | $295.00 | $295.00 | $295.00 | $295.00 | $180.00 |
| 87 | Sign, flat sheet (630E80100) | SF | 22 | $21.50 | $21.50 | $21.50 | $21.50 | $22.50 |
| 88 | Sign, street name (630E80510) | EACH | 6 | $195.00 | $195.00 | $195.00 | $195.00 | $355.00 |
| 89 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 11 | $1,275.00 | $1,275.00 | $1,275.00 | $1,300.00 | $1,300.00 |
| 90 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 4 | $850.00 | $850.00 | $850.00 | $800.00 | $1,006.00 |
| 91 | Covering of vehicular signal head (632E25000) | EACH | 11 | $40.00 | $40.00 | $40.00 | $40.00 | $47.00 |
| 92 | Covering of pedestrian signal head (632E25010) | EACH | 4 | $30.00 | $30.00 | $30.00 | $35.00 | $47.00 |
| 93 | Pedestrian pushbutton (632E26000) | EACH | 4 | $275.00 | $275.00 | $275.00 | $400.00 | $277.00 |
| 94 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,956 | $3.00 | $3.00 | $3.00 | $3.25 | $2.90 |
| 95 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 515 | $3.25 | $3.25 | $3.25 | $3.50 | $3.50 |
| 96 | Signal support foundation, as per plan (632E64011) | EACH | 3 | $7,900.00 | $7,900.00 | $7,900.00 | $13,000 | $8,795.00 |
| 97 | Pedestal foundation, as per plan (632E64021) | EACH | 4 | $1,150.00 | $1,150.00 | $1,150.00 | $2,000.00 | $1,321.00 |
| 98 | Loop detector lead-in cable (632E65200) | FT | 821 | $2.00 | $2.00 | $2.00 | $2.25 | $2.25 |
| 99 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 83 | $5.75 | $5.75 | $5.75 | $5.00 | $4.75 |
| 100 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 50 | $8.25 | $8.25 | $8.25 | $5.50 | $5.95 |
| 101 | Power service, as per plan (632E70001) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $4,000.00 | $4,252.00 |
| 102 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $600.00 | $600.00 | $600.00 | $1,250.00 | $773.00 |
| 103 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 1 | $14,500 | $14,500 | $14,500 | $20,000 | $19,373 |
| 104 | Combination signal support, type TC-12.31 design 1 (632E78497) | EACH | 1 | $39,000 | $39,000 | $39,000 | $46,000 | $51,856 |
| 105 | Combination signal support, type TC-81.22, design 14, as per plan (632E79151) | EACH | 1 | $21,350 | $21,350 | $21,350 | $22,500 | $25,238 |
| 106 | Pedestal, 11', transformer base (632E90000) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 | $2,000.00 | $1,063.00 |
| 107 | Pedestal, misc.: pedestal, 17' transformer base (632E90010) | EACH | 1 | $1,990.00 | $1,990.00 | $1,990.00 | $2,500.00 | $2,684.00 |
| 108 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $4,000.00 | $4,134.00 |
| 109 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $17,500 | $17,500 | $17,500 | $19,000 | $19,143 |
| 110 | Cabinet foundation (633E67100) | EACH | 1 | $2,850.00 | $2,850.00 | $2,850.00 | $4,750.00 | $1,910.00 |
| 111 | Controller work pad (633E67200) | EACH | 1 | $850.00 | $850.00 | $850.00 | $3,000.00 | $718.00 |
| 112 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,950.00 | $8,950.00 | $8,950.00 | $8,000.00 | $9,256.00 |
| 113 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $9,900.00 | $9,900.00 | $9,900.00 | $9,000.00 | $9,656.00 |
| 114 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $9,700.00 | $9,700.00 | $9,700.00 | $8,800.00 | $9,311.00 |
| 115 | Atc controller, as per plan (809E69123) | EACH | 1 | $5,800.00 | $5,800.00 | $5,800.00 | $4,800.00 | $6,036.00 |
| 116 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 104 | $100.00 | $80.00 | $136.46 | $90.00 | $85.00 |
| 117 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,400.00 | $2,400.00 | $2,400.00 | $2,520.00 | $2,400.00 |
| 118 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 3 | $2,400.00 | $2,400.00 | $2,400.00 | $2,520.00 | $2,400.00 |
| 119 | Work zone raised pavement marker (614E12800) | EACH | 16 | $21.00 | $21.00 | $38.53 | $40.00 | $21.00 |
| 120 | Barrier reflector, type 1, one-way (614E13310) | EACH | 29 | $14.00 | $14.00 | $14.00 | $20.00 | $14.00 |
| 121 | Object marker, one way (614E13350) | EACH | 29 | $18.00 | $18.00 | $18.00 | $22.00 | $18.00 |
| 122 | Portable changeable message sign (614E18600) | SNMT | 12 | $700.00 | $700.00 | $950.00 | $2,075.64 | $700.00 |
| 123 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.08 | $14,000 | $14,000 | $14,000 | $11,590 | $14,000 |
| 124 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.60 | $7,600.00 | $7,600.00 | $7,600.00 | $17,629 | $7,600.00 |
| 125 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.12 | $7,200.00 | $7,200.00 | $7,200.00 | $5,808.00 | $7,200.00 |
| 126 | Work zone channelizing line, class I, 12", 740.06, type I (614E23410) | FT | 507 | $3.00 | $3.00 | $3.00 | $2.00 | $3.00 |
| 127 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 636 | $2.90 | $2.90 | $2.90 | $1.00 | $2.90 |
| 128 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 1,166 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 129 | Water (616E10000) | MGAL | 0.80 | $15.00 | $30.00 | $9.10 | $7,500.00 | $16.09 |
| 130 | Portable barrier, unanchored (622E41100) | FT | 1,445 | $28.25 | $31.25 | $28.25 | $28.00 | $28.25 |
| 131 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,306.49 | $19,550 | $8,601.69 | $13,000 | $8,521.08 |
| 132 | Maintaining traffic (614E11000) | LS | 1 | $150,000 | $64,735 | $42,124 | $65,000 | $60,939 |
| 133 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $12,740 | $5,671.61 | $41,000 | $13,500 |
| 134 | Mobilization (624E10000) | LS | 1 | $20,000 | $65,170 | $67,500 | $75,000 | $62,807 |
| 135 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $15,000 | $9,740.00 | $4,605.00 | $15,000 | $3,000.00 |
| 136 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $20,000 | $4,890.00 | $13,195 | $5,000.00 | $4,352.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.